Loading...
HomeMy WebLinkAboutTRAILHEAD VILLAGE TOWNHOMES - PDP - 43-02C - CORRESPONDENCE - STREET RELATED DOCUMENTAnne Aspen Trailhead Page 1 From: Anne Aspen To: cmathis@vfavfr.com Date: 01/05/2006 10:10:26 AM Subject: Trailhead Hi Cathy, Clark Mapes, Mike Herzig, Sheri Wamhoff and I just met about the sidewalk issue at Trailhead. We all agreed on the following: -The parkways along Vine and Greenfields can be greater than 10 feet wide. -A bow or slight meander to approach the mid -block internal ped system is acceptable. -The following concerns should be kept in mind when redesigning: +The sidewalk must be no more than 25' from the curb; +The sidewalk should be positioned and detailed such that it is clear that it is a public sidewalk; +Be mindful of nighttime safety —the sidewalk needs to be adequately lit by the streetlights; +Be mindful of snow removal operations. We'll need to figure out who will maintain the sidewalk; +Coordinate carefully with utilities: trees should be dimensioned on drawing from something that will exist at the time of construction like a property line or sidewalk, no manhole covers from the storm sewer are allowed in the sidewalk, etc. Hope this helps. Please let me know if you have further questions. I've copied Mike, Sheri and Clark so if I've misrepresented the meeting, hopefully one of them will correct me. Anne Anne Aspen City Planner Current Planning Department City of Fort Collins, CO aaspen@fcgov.com (970)221-6206 CC: Clark Mapes; Mike Herzig; Sheri Wamhoff