Loading...
HomeMy WebLinkAboutTRAILHEAD VILLAGE TOWNHOMES - PDP - 43-02C - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTOctober 12, 2005 Mr. Basil Hamdan City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Final Drainage and Erosion Control Report Trail Head Town Homes -Tracts F & G JR PN 39145.25 & 39145.26 Dear Mr. Basil Hamdan: J•R .ENGINEERING A Westrian Company We are pleased to submit for your review and approval the Trail Head Town Homes -Tracts F & G utility plan set. As you probably know these tracts are located in the previously approved Trail Head plan set. The final drainage report for Trail Head sized all of the necessary storm water infrastructure for the developed conditions of these two tracts. At this time we are asking that it be acceptable to submit these utility sheets with the understanding that the storm water has been considered with the final drainage report of the Trail Head plan set. Since we are not altering the direction of the storm water flows and the receiving detention ponds, the calculations within the final drainage report are still valid. Along with our next submittal we will be performing a drainage analysis within these sub basins of the Trail Head drainage report and will supply all calculations that support the sizes and extensions into Tracts F & G. We appreciate your time and consideration in reviewing this submittal. If you have any questions or need additional information please call (970) 491-9888. Sincerely, Z^1->� /a� Timothy J. lopoff, Lead Project Engineer 2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • w Jrengineering.com