HomeMy WebLinkAboutHARMONY RIDGE P.U.D. 3RD REPLAT, 4609 MORNING DOVE LN. (6-PLEX) - PDP/FDP - FDP150043 - SUBMITTAL DOCUMENTS - ROUND 1 -QUALITY
`x ENGINEERING
W W W. QUALITY-ENGINEERING.COM
TRANSMITTAL
Date: December 11, 2015
To: Clay Frickey
City of Fort Collins
Planning
281 North College Avenue
Fort Collins, Colorado 80524
From: Gary Floyd, EI
Quality Engineering, LLC
Project: Harmony Ridge Townhomes
Quality Project Number: 1090-001
We are sending you:
❑ Plans
❑ Specifications
❑ Shop Drawings
❑ Samples
❑ Letters/Reports
El Submittals
Rl Electronic Files on Drive
El Other
Transmitted herewith are the followinE:
• Project Development Application
• Transportation Development Review Application
• PDP Application Fee + TDR Fee = $3,160.00
• APO mailing fee = $111.00 ($0.75/address)
• Three (3) lists of names and addresses of all owners w/in 800' of proposed property: (2 printed on
mailing labels) (1 on included thumb drive)
• (31) copies of the Statement of Planning Objectives
• (23) 24"06"-folded copies of the Subdivision Plat
• (1) Email from planning describing the necessary items for submittal/approval.
Comments:
Clay,
All items highlighted in your email discussion with Cody Geisendorfer have been included to assure a
smooth process.
Thanks!
Gary Floyd, EI
CC: Joe Kish, Post Modem Development
QUALITY ENGINEERING, LLC (970) 416-7891 2637 MIDPOINT DR. SUITE E FORT COLLINS, COLORADO