Loading...
HomeMy WebLinkAboutHARMONY RIDGE P.U.D. 3RD REPLAT, 4609 MORNING DOVE LN. (6-PLEX) - PDP/FDP - FDP150043 - SUBMITTAL DOCUMENTS - ROUND 1 -QUALITY `x ENGINEERING W W W. QUALITY-ENGINEERING.COM TRANSMITTAL Date: December 11, 2015 To: Clay Frickey City of Fort Collins Planning 281 North College Avenue Fort Collins, Colorado 80524 From: Gary Floyd, EI Quality Engineering, LLC Project: Harmony Ridge Townhomes Quality Project Number: 1090-001 We are sending you: ❑ Plans ❑ Specifications ❑ Shop Drawings ❑ Samples ❑ Letters/Reports El Submittals Rl Electronic Files on Drive El Other Transmitted herewith are the followinE: • Project Development Application • Transportation Development Review Application • PDP Application Fee + TDR Fee = $3,160.00 • APO mailing fee = $111.00 ($0.75/address) • Three (3) lists of names and addresses of all owners w/in 800' of proposed property: (2 printed on mailing labels) (1 on included thumb drive) • (31) copies of the Statement of Planning Objectives • (23) 24"06"-folded copies of the Subdivision Plat • (1) Email from planning describing the necessary items for submittal/approval. Comments: Clay, All items highlighted in your email discussion with Cody Geisendorfer have been included to assure a smooth process. Thanks! Gary Floyd, EI CC: Joe Kish, Post Modem Development QUALITY ENGINEERING, LLC (970) 416-7891 2637 MIDPOINT DR. SUITE E FORT COLLINS, COLORADO