City of Fort Collins
STAFF PROJECT REVIEW
VF RIPLEY ASSOC.
LINDA RIPLEY
401 W. MOUNTAIN AVE. #201
FT. COLLINS, CO 80521
Date: 10/04/2004
Staff has reviewed your submittal for TRAILHEAD PDP - TYPE I (LUC) AND FINAL PLAN,
and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Bob Barkeen
Topic: Landscape
Number: 335 Created: 10/4/2004
[10/4/04] The site plan for the day care center will need to be updated to show the removal
of the recreation center.
Department: Engineering Issue Contact: Susan Joy
Topic: East Vine Drive Interim
Number: 269 Created: 8/27/2004
[9/23/04] Since the utility connections are all now shown in the Trailhead PDP plans, please
provide another note that states: Please refer to Trailhead Utility Plans for all utility
connections in Vine Drive. Or something like that.
[8/27/04] Add the street cut note: Limits of street cut are approximate. Final limits are to be
determined in the field by the City Engineering Inspector. All repairs to be in accordance
with City Street repair standards.
Topic: East Vine Drive Ultimate
Number: 309 Created: 9/23/2004
[9/23/04] Cross Section Sheets - show the slope ratio on each section, both sides (cannot
exceed 4:1)
Number: 318 Created: 9/28/2004
[9/28/04] Sheet 15-22, note 2 - Correct the spelling of Whitman to Whitham.
Topic: General
Number: 36 Created: 1 /13/2004
[9/23/04] [8/24/04] [5/18/04) A change has been made to the requirements below. The
trees will not be installed at this time along Vine and their costs will be included in the
contribution in aid for the developer's local street portion. Please continue to show the trees
on the plans but label the landscaping and utility plans that the trees will be installed with the
Vine Drive Road Improvements.
[3/19/04] [1/13/04] Engineering will require an interim and ultimate road design for Vine
Drive. The TIS shows the need for a right turn lane from Vine to Greenfields in the long
range. This project is responsible for dedicating the additional ROW and designing it in the
ultimate design. This project is also responsible for construction of Vine Drive along their
frontage, however, the City's Street Oversizing Dept prefers to construct the entire length of
Vine when it's realigned at some point in the future. This project will only construct the
sidewalk along their frontage and install the landscaping. A Contribution in Aid will be
Page 1
A reminder that the irrigation easement needs to be abandoned and all off -site easements
signed before mylar signing.
Number: 246 Created: 8/27/2004
[10/1 /04]
Please provide a plan view for all the lot grading templates (Type A, B, G, W) to better clarify
typical lot grading.
Topic: Stormwater
Number: 321 Created: 10/1/2004
Please see minor comments on the redlined plans.
Department: Transportation Planning Issue Contact: David Averill
Topic: Site
Number: 317 Created: 9/27/2004
(9/27/04] Comment pertaining to E. Vine proposed arterial design improvements - Please
show locations for bicycle lane symbols/signs to be applied/installed.
Topic: Transportation
Number: 239 Created: 8/24/2004
[9/27/04]
[8/24/04] Sheet 81 of Utility Plans: Ultimate Vine/Greenfields - please add a ramp on NE
corner that directs pedestrians south across Vine to the refuge provided in the median.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Bob Barkeen
City Planner
Page 4
Number: 330 Created: 10/1 /2004
[10/1/04] Sheet B11 - Bridge Rail Anchorage detail - we drew in the rebar from the other
detail and just wanted to make sure that there won't be any conflict. Could you take a look
at this?
Number: 331 Created: 10/1 /2004
[10/1/04] Please provide the shop drawings for the reinforcing steel.
Number: 332 Created: 10/1 /2004
[10/1/04] See attached sheets to comment letter.
Topic: Landscape
Number: 319 Created: 9/28/2004
[9/28/04] Sheet 4 - Tree located over shared driveway, lots 1 and 24, block 4.
Number: 334 Created: 10/1 /2004
[10/1/04] There are 4 trees shown in an area that will be regraded in the future to
accommodate the ultimate Vine Drive improvements. As a policy, the city does not allow
trees to be planted in areas that will require their removal in the future. The developer does
have a choice in this case ... if he chooses to have the trees there, then they must be
ornamentals and the developer would have to escrow for the future trees as well. That
would mean that he has to pay for 8 trees rather than 4. The other choice, of course, is to
not install the trees at this time and include their cost in the Vine Drive estimate.
Topic: Plat
Number: 259 Created: 8/27/2004
[10/1/04] [8/27/04] From Technical Services: Boundary and legal close.
Number: 322 Created: 10/1 /2004
[10/1/04] From Technical Services: Curve designation missing on lot 1, blk 4, sheet 4 and
5.
Number: 323 Created: 10/1 /2004
[10/1/04] From Technical Services: You might want to change the legal as suggested on
Sheet 1.
Topic: Site
Number: 316 Created: 9/23/2004
[9/23/04] Please add a note: Please refer to the Trailhead Utility Plans for the interim
improvements along Vine Drive.
Department: Police
Topic: Landscape
Number: 320
[9/29/04] No comments
Department: Stormwater Utility
Topic: Drainage
Number: 244
[10/1/04]
Issue Contact: Joseph Gerdom
Created: 9/29/2004
Issue Contact: Wes Lamarque
Created: 8/27/2004
Page 3
accepted for the rest of their local street portion. An estimate prepared by JR Engineering
will be required prior to drafting the Development Agreement so that this amount can be
added to the DA.
Number: 91 Created: 1 /16/2004
[9/23/04] [8/24/04] [5/18/04] [3/18/04] Just keeping this comment alive until we do the DA.
(1/16/04] Glacier Creek will not need to be constructed to the property line per the
discussion at Staff Review, January 14th. Cash in lieu of will be accepted so that the street
can be built at some point in the future. An estimate will be required from JR Engineering
for the City's review and approval so that the dollar amount can be included in the DA.
Number: 333 Created: 10/1/2004
[10/1/04] Engineering is ready for mylars provided that the remaining issues are addressed.
Topic: Greenfields Arterial
Number: 324 Created: 10/1/2004
[10/1/04] Sheet B2 - See redlines. Question/suggestion on the placement of the wingwalls.
There is a concern that there will be scouring - is there another way to place these or will we
need to do something with the embankment to account for that? Also, the typical section for
the bridge girds show that you will be laying the girds at an angle. This is OK, just that it is
harder to lay this out in the field and could cost more. Another option would be to pour a
stepped deck instead (but this is not required).
Number: 325 Created: 10/1/2004
[10/1/04] Sheet B4 - Please provide an elevation for the other side of the Abutment. Also,
the bearing seats talc out at 1.33% slope one way and 2.66% the other. Our minimum is
2%.
Detail A - See redlines for questions and some dimensioning requirements. Please call if
you have questions or if you need to meet with me. I also went over these redlines with Tim
Halopoff and you could call him as well.
Number: 326 Created: 10/1/2004
[10/1/04] Sheet B5 - Please show the L bar in detail A so that it doesn't get missed when
they're forming this up.
Please provide an elevation for the other side of Abutment 2.
Number: 327 Created: 10/1/2004
[10/1/04] Sheet B6 - Typical Wingwall Section - Where is this in plan view? And does the
galv sheet metal piece go all the way over the top or just around it?
Number: 328 Created: 10/1/2004
[10/1/04] SheetB8 - Plan View - Detail A on B4 and B5 add up to 9" while this detail adds up
to 10 and 3/8". See redlines.
Number: 329 Created: 10/1/2004
[10/1/04] Sheet 1310 - Detail 2 - Is there another way to run the deck drain? The way it is
now leaves 3" of concrete for the sidewalk and by the time you subtract out the rebar, you
don't have a lot of concrete left. It won't stand up to traffic very long.
Page 2