HomeMy WebLinkAboutTRAILHEAD - PDP - 43-02A - CORRESPONDENCE - REVISIONS (6)• Pipe diameters have been corrected to match profile diameters. 33 of 85 • Laterals are now shown. • NM-34 has been moved closer to the centerline. • The crossings have been eliminated. 34 of 85 MH-44 has been moved closer to the centerline. 35 of 85 • A pipeline stub and manhole are now shown heading in the northwest direction. • A note was added to the profile sheet requiring a flow restrictor to be installed on the pool outlet. 36 of 85 • Sanitary sewer is not shown in Tract K • The sanitary sewer lateral for Block 7, Lot 28 is now shown connecting straight into the manhole. 52 of 85 The crossings have been eliminated. 55 of 85 This section is shown to be encased. 84/85 of 85 Boxelder pipe encasement and a detail for the CMLP C900 bedding were added as per discussion. Page 2 of 6 ,.1 Trailhead Responses: iUL 3 0 ?004 MXPMMWQNMKT 1. Hydraulic Analysis - We have estimated 20 single-family units may contribute flows at ME-28 (THD 2600) from the future development to the north west of the site. It was correct to assume the larger pipe for the analysis where the error between plan and profile pipe size conflicts occurred. These errors have been corrected. The pipe analysis was not reevaluated due to given direction from Boxelder. 2. Easements The sewer extension off MH-28 (THD 2600) is located in Tract R. Tract R is a blanket easement for utilities and drainage. The utility easement for the sanitary sewer on the southeast corner of the site has been extended to encompass the sanitary sewer. 3. General Comments a. District's address has been updated. b. Laterals have been drawn all the way to the sanitary sewer main. A table was provided for the station numbering of the service on each sanitary sewer profile sheet. c. Multi -family sanitary sewer laterals will be presented to the district at a later date. 4. Specific Comments Sheet # Comment 14 of 85 Laterals are now shown. 18 of 85 Laterals are now shown. 15 of 85 • MH-I I has been moved closer to the centerline. • Sanitary sewer laterals have been adjusted per discussion. 16 of 85 • The sanitary sewer is shown as CMLP C900 and noted to see provided bedding detail as per discussion. • Sanitary sewer laterals are shown for the commercial properties. 26 of 85 Pipe diameters have been corrected to match profile diameters. 27 of 85 Pipe diameters have been corrected to match profile diameters. 28 of 85 MH-12 has been moved closer to the centerline. 31 of 85 NM-26 has been moved closer to the centerline. 32 of 85 • The crossing at Sta. 19+77.03 is labeled to be encased. Page 1 of 6 Boxelder Sanitation District Dr. Ravi Srivastava, PE 3201 E. Mulberry Street, Unit Q Ft. Collins, CO 80524 July 28, 2004 Dr. Srivastava: J U L 3 0 2004 SMaM8AN(1I ONO1dWT J•R ENGINEERING A Westrian Company JR Engineering has addressed all comments and has prepared final compliance plan sets of Overall Utility Plans for Trail Head, Vine Drive and Greenfields Drive Improvements. We thank you for working so cooperatively with our clients Trail Head Partners LLC and JR Engineering. We trust that you'll find these plans suitable for construction and appreciate your willingness to check them accordingly. If there are any outstanding issues with the engineering or coordination for this project, please contact me at your earliest convenience. Replies to comments have been prepared by Jason Claeys and are attached. Warm regards, Timothy J. Halo ff, PE Cc: file Page 1 of 1 2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Faz 970A91-9984 • w Jrengincering.com