Loading...
HomeMy WebLinkAboutTRAILHEAD - PDP - 43-02A - CORRESPONDENCE - REVISIONS (5)157 Complete. 158 Complete. 160 Complete. 161 Complete. 211 Complete. 212 Complete. 217 An E4 Appendix has been submitted, however due to the nature of this Preliminary Ultimate Arterial Design all items do not necessarily apply. The plan set has been revised per all other comments and the meeting held June 24`h12004. Topic: Greenfields Arterial 162 Complete. 223 An E4 Appendix has been submitted, however due to the nature of this Preliminary Ultimate Arterial Design all items do not necessarily apply. The plan set has been revised per all other comments and the meeting held June 24`h, 2004. 224 Complete. P Page 6 of 6 15 Noted. 16 Noted. 17 Noted. 18 Noted. 175 Complete. 166 Complete. 227 Complete. 228 Easement recorded. 230 Complete. 78 Complete. 81 Complete. 128 Complete. Topic: East Vine Drive Interim 208 Complete. 209 Complete @ 100' 210 Complete. 213 Complete. 216 An E4 Appendix has been submitted, however due to the nature of this Interim Design all items do not necessarily apply. The plan set has been revised per all other comments and the meeting held June 241h, 2004. Topic: East Vine Drive Ultimate 152 Complete. 156 Complete. Page 5 of 6 193 Included in Phase 1. 194 Followed redlines for ramps. Changing recommendations made it difficult to know what to do. 195 Ramp moved. 196 Complete. 197 Complete. 198 Complete. 199 Complete. 200 Complete. 201 Complete. 202 Complete. 203 Complete. 204 Complete. 205 Complete. 206 Complete. 218 Complete. 220 Complete. 221 Removed. 222 All pipe on -site. 9 Complete. 10 Noted. 11 Checked and found to be in compliance. 12 Checked and found to be in compliance. 13 Complete. Page 4 of 6 95 Lower Loop Dr. (Noted) 111 Complete. 116 Complete. 133 Complete. 189 Complete. 37 Complete. 62 Complete. 85 Complete. 88 Details standard. 136 Addressed. 137 Addressed. 143 Addressed. 145 Addressed. 148 Addressed. 149 Complete. 154 See Profiles. 164 Complete. 176 Complete. 177 Complete. 178 Removed. 190 Complete. 191 Complete. 192 The ditch culvert and headwall will not exist following demolition. Page 3 of 6 Trailhead Responses: Department: Engineering Topic: Overall Utility Plans 161 Grading complete (per meeting, see sheet 45). 29 Signature provided (Cover, Grading Plan). 31 All text legible & correct size. 35 Not required (per meeting). 36 Clear Interim & Ultimate grading. 91 Noted. 92 See Soils Report supplement. 132 Complete. 163 Complete. 186 Underpass Deleted. 187 Underpass Deleted. 215 Made clear. 219 Retaining walls removed. 225 No sidewalk on Tract k only. Entry features need sidewalk and Tracts F and G will be constructed in the near future. 226 Hearing date August 11, 2004.. 63 Complete. 65 Complete. 90 Complete. Page 2 of 6 City of Fort Collins Mr. Bob Barkeen 281 North College Avenue Fort Collins, CO 80522-0580 July 27, 2004 Mr. Barkeen: J•R ENGINEERING A Westrian Company JR Engineering has addressed all comments and has prepared final compliance plan sets of Overall Utility Plans for Trail Head, Vine Drive and Greenfields Drive Improvements. We thank you for working so cooperatively with our clients Trail Head Partners LLC and JR Engineering. We trust that you'll find these plans suitable for construction and appreciate your willingness to check them accordingly. If there are any outstanding issues with the engineering or coordination for this project, please contact me at your earliest convenience. Replies to comments follow. Warm regards, Timothy J. Halopof, , PE Cc: file 2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525 Page 1 of 6 970-491-9888 • Fax: 970A91-9984 • w jrengineering.com