Loading...
HomeMy WebLinkAboutTIMBERLAKES BUSINESS PARK - ODP - 60-98 - CORRESPONDENCE - (6)ft 6. Kim Kreimeyer of the Current Planning Department, representing natural resources concerns, offered the following comments: a. Please refer to the purchase agreement for setbacks from the wetlands, ponds, and natural areas. b. No storm drainage can go directly into the ponds. Water quality measures must be provided. c. What is the status of the Western Mobile access rights to and from this site? Please contact Kim, at 221-6750, if you have questions about these comments. 7. A neighborhood meeting must be held for this development proposal prior to formal submittal of the request (Section 2.2.2 of the LUC). Please contact Steve Olt of the Current Planning Department to assist you in scheduling this meeting. He can be reached at 221-6341. 8. This development request will be subject to the Development Review Fee Schedule that is available in the Current Planning Department office. The fees are due at the time of submittal of the required documents for the Overall Development Plan (if necessary), Project Development Plan, and Final Compliance phases of development review by City staff and affected outside reviewing agencies. 9. This development proposal is subject to the requirements as set forth in the City's LUC, specifically Articles 2. Administration (Development Review Procedures), Article 3. General Development Standards, and Article 4. [Zoning] Districts. 4b a c. The City's water conservation standards for landscaping and irrigation systems will apply to this site. Information on these standards can be obtained at the Water Department and the Current Planning Department. d. Plant investment fees and water rights will apply to this development and they will be due at time of issuance of building permits. Please contact Roger, at 221-6854, if you have questions about these comments. 5. Glen Schlueter of the Stormwater Utility offered the following comments: a. The site is located within the Spring Creek and Poudre River Basins; therefore, only the portion in Spring Creek has a new development fee of $2,175 per acre and that is subject to the runoff coefficient reduction. b. The standard drainage and erosion control reports and plans are required and they must be prepared by a professional engineer registered in the State of Colorado. c. Water quality measures need to be addressed and extended detention is the recommended method. Other best management practices are encouraged. d. The site is in the Poudre River floodplain, which is being modified. Any construction would have to meet the floodplain regulations until the FEMA map is revised. The schedule presently is to submit to FEMA by the end of 1998. FEMA then has up to 90 days to review and reply to the map revision. No construction work is allowed in the "floodway" and no building permits are allowed until FEMA approves the map revision. e. There is also the 500 cfs (+/-) that enters the west side of the site. The City has an easement to pass this flow through the lakes and discharge into Spring Creek at 40 cfs (+/-). This conveyance and detention system needs to remain but can be modified. f. The modeling needs to be set up on a SWMM model. The balancing of pond volumes will require Extran modeling. Please contact Glen, at 221-6065, if you have questions about these comments. 4b a f. Timberline Road will eventually be a 6-lane arterial street, requiring a 141' wide right-of-way. There may be repays for the Timberline construction associated with development on this property. Please contact Mark Sears of the Engineering Department to verify the status. He can be reached at 221-6583. Please contact Sheri, at 221-6750, if you have questions about these comments. 3. Monica Moore of the Light & Power Department offered the following comments: a. There are existing electric services along Timberline Road. b. The normal electric development charges will apply to this project. .c. The developer will be responsible for expenses associated with any relocations of electric facilities. mod. A C-1 Commercial Form should be filled out to help determine the power needs for this development. e. The transformer locations should be coordinated with Light & Power. f. There was an expressed desire to provide street light fixtures other than the City's normal fixtures in this development. Please contact Doug Martine, at 221-6700, to discuss any possible options. Please contact Monica, at 221-6700, if you have questions about these comments. 4. Roger Buffington of the WaterAVastewater Department offered the following comments: a. There is an existing 24" water main and an existing 42" sanitary sewer main in Timberline Road. Roger is not sure of the exact locations for these utilities. b. There is a repay for the 24" water main in Timberline Road that this developer will be responsible for. It is based on the lineal feet of street frontage of the property. Please contact Roger, at 221-6854, for the amount of this repay. • 0 e. There are maximum parking requirements for office uses (3 spaces/1,000 square feet of leasable floor area), commercial/retail uses (4 spaces/1,000 square feet of leasable floor area), and industrial (0.75 spaces/employee) as set forth in Section 3.2.2(K)(2)(a) of the LUC. f. Presently the LUC has a cap of 25% on the amount of commercial/retail uses (this includes office uses) that can occur within a site specific development plan. A pending Fall change to the LUC that is scheduled to go before City Council soon will eliminate office uses (but not commercial) from this restriction. Please contact Peter, at 221-6760, if you have questions about these comments. 2. Sheri Wamhoff of the Engineering Department offered the following comments: .a. A Transportation Impact Study (TIS) is required with your Project Development Plan (PDP). Please contact Eric Bracke, the City's Traffic Engineer, at 224-6062 to schedule a scoping meeting for the purpose of determining what is needed in the TIS. Also, the TIS must address the requirements for providing multi - modal forms of transportation to and from the site. Please contact Kathleen Reavis of the Transportation Planning Department to discuss the requirements here. She can be reached at 224-6140. b. The allowable access to the site will be determined by the results of the TIS and the requirements as set forth in the City Code. c. Street oversizing fees will apply to this development. The fees of $3.70 per square foot for the proposed office uses, $1.06 per square foot for the proposed light industrial uses, and $3.95 per square foot for the proposed commercial/retail uses will be collected at the time of issuance of building permits. These fees are based on vehicle trip generations by the development. Please contact Matt Baker, at 224- 6108, for more detailed or specific information on the fees. d. The standard utility plans, based on the Engineering Department's requirements, must be submitted to the City for review and approval. A development agreement between the City and the developers will also be required. e. Hoffman Mill Road must remain in place. It cannot be eliminated with this development. MEETING DATE: October 19, 1998 ITEM: Timberline Lakes Business Park APPLICANT: Bruce Hendee BHA Design 4803 Innovation Drive Fort Collins, CO. 80525 LAND USE DATA: Request for a commercial/industrial/office park containing approximately 416,000 square feet of leasable floor area in multiple buildings that may be up to 4 stories in height. The property is located on the east and west sides of Timberline Road, north of East Prospect Road, and being adjacent to the existing BMC West and Bath Landscape facilities. The property is in the E - Employment Zoning District. COMMENTS: 1. Peter Barnes of the Zoning Department offered the following comments: a. This property is in the E - Employment Zoning District. The proposed commercial, industrial, and office uses are permitted uses in the E District, subject to Planning and Zoning Board (Type II) review. b.. All new structures greater than 50,000 square feet in floor area shall be subject to Planning and Zoning Board review [Section 4.22(D)(2)(b) of the Land Use Code (LUC)1. c. There are Land Use and Development Standards in Division 4.22 of the LUC that this development proposal must comply with. d. This development proposal must comply with the applicable General Development Standards as set forth in Article 3 of the LUC, including but not limited to requirements for vehicle and bicycle parking, handicapped parking, building setbacks, landscaping, etc. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT G� CGYtit�icvl S Commu Planning and Environmental Wces Current Planning City of Fort Collins October 23, 1998 Bruce Hendee BHA Design 4803 Innovation Drive Fort Collins, CO. 80525 Dear Bruce, For your information, attached is a copy of the Staffs comments concerning the request for the Timberline Lakes Business Park, which was presented before the Conceptual Review Team on October 19, 1998. This is a request for a commercial/industrial/office park containing approximately 416,000 square feet of leasable floor area in multiple buildings that may be up to 4 stories in height. The property is located on the east and west sides of Timberline Road, north of East Prospect Road, and being adjacent to the existing BMC West and Bath Landscape facilities. The property is in the E - Employment Zoning District. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Si cerely,oa- Project teve Olt, Planner cc: Stormwater Utility Streets File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020