TO: Jerry Lee, W.W. Reynolds companies
•
`o
Jenny Torrey, BHA Design
o
Fort Collins Staff
o
�
6
PRAM: Matt Delich
U
•
DATS: January 8, 1999
z
c
LL
suaJSCT: Timber Lakes Business Park Transportation Impact study -
Response to staff comments (File: 9897ME02)
J
u,
The following responds to staff comments related to the
Q,
transportation impact study as enumerated.in Steve Olt's letter dated
0
to
December 29, 1998- The relevant comments are under item 5, as
Z
p
offered by Eric Bracke.
s`
rn
a. The need for the signal was evaluated using the peak hour
Jz
signal warrant as contained in the:"Manual on Uniform Traffic
C7
$
Control Devices," 1988. The forecasted volumes indicated that
a
a signal would be warranted at this intersection. I would
a
agree that the actual need for the signal should be evaluated
a
periodically as development occurs;
b. The TIS indicates northbound right -turn lanes at both accesses
along Timberline Road in Figures 14 and 15. These turn lanes
will provide smoother operation on'Timberline Road.
C. Access to the Bath Nursery property from Parcel A on the west
side of Timberline Road was mentioned in early comments from
Eric. Joint access, where possible, is generally considered to
be positive, in that it may remove some traffic from the
arterial street. This should be explored and, if practical,
the opportunity should be provided. This action will
Uj
necessitate agreement with the property to the south,(Bath).'
d
z
d. The red -lined copy of the Master Utility Plan, with additional
w
comments, was not included in the transmittal to me'.
z
Therefore, Z am unable to respond to this item.
t%
2
JW
This concludes my response to staff comments.
W
0
a
R
W
as
LI
LL
LL
r
Q
F
g
cold 17£0S699£0£ 3d HOI13G M3H1iHW £V:rT 666T-G0-NUf
Timberlakes Business Park ODP
Page 2"
8. Acknowledged,
91 Acknowledged.
10. Water/ Wastewater Department.
(Please find the attached response memo by Don Park)
I I.. The existing floodplain has been added to the ODP.
12. Acknowledged.
13.. Parcel B has been divided into sub -parcels.
14. The scale of the ODP has been enlarged. In order to do this and
show the required amount of adjacent property, the ODP is now on 2 .
2411 x 36" sheets.:: .
15. The floodplain has been added to, the ODP.
16. Acknowledged. '
17. Conceptual locations of bicycle and pedestrian circulation have been
added to the ODP.
18. Acknowledged.
19, Engineering.
A majority of this site currently falls within the existing Poudre
floodplain: However, this site will be removed from the floodplain
once FEMA approves the LOMR submittal.
Sincerely,
ennifer Berson Torrey,�A'
N
January 13,1999
Steve Olt - Project Planner
City of Fort Collins
Current Planning Department
281 North College Avenue
Fort Collins, CO 80522-0580
Dear Steve,
We have review staff comments (dated December 29, 1998) and have
revised our plans accordingly. The following responses correspond to the
numbered staff comments:
1. Acknowledged.
2. Zoning Department.
A. The general notes on permitted uses on the ODP has been
changed to, reflect the Code revision.
B. If any buildings are proposed to be over 40' in height a shadow
analysis will be -provided at the appropriate time within the City
review process.
3: Poudre Fire Authority.
A. Acknowledged.
B. Acknowledged.
C. Acknowledged.
D. Acknowledged.
E. Acknowledged. -
4. Engineering Department.
A. Acknowledged.
B. Acknowledged.
C. Acknowledged.
5.. Traffic. Operations Department.
(Please find the attached response memo by Matt Delich).
C. A potential access point has been added to Parcel A. This issue
shall be addressed at PDP.
6. A note has been added to the ODP acknowledging this requirement.
7. Notes have been added to the ODP indicating the buffer distances
from the purchase agreement.
� s
design
LANDSCAPE ARCHITECTURE
URBAN DESIGN
PLANNING
BHA DESIGN, INC.
4803 INNOVATION DRIVE
FT. COLLINS. CO 80525,
TEL 970 ]]3-7577
FAX 970 I23-4827
0