HomeMy WebLinkAboutTIMBERLAKES BUSINESS PARK - ODP - 60-98 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: i NL��LAKO; R,sIKI - 66P Date: 12/2-1/Ys
Planner: SrEv6 CLT- Traffic Operations: i3 ac"
Engineer: �N ��ora�
C)w Items Requited
-Site- land- flat Utility Draina
lag z
ter 2
11OW/ auc►raui I I I
Traffic Operations
Irani. Planning I t
natural Reiourcei
Park Planning
iuLan 3 3 1 Za3 z
Other: Yuct W/c;pr
Other Items Required
Note: All redlined items should be returned with the mubmittal/ reunions,
Redlined Items Being Returned
Site I land I Plat I Utilitv I Drainage
0 I p I C� I I I
Other Items Being Returned -
a6P
Revisions Routing Sheet
Item: [# F -4q�;
—1 . nI'b 11
pDate: l /
k
PROJECT PLANNER
NEERING: PAVEMENT
NG
DING INSPECTION
HT & POWER
&LAPPING / DRAFTING
FORESTRY
FCLWD/ELCO/B O.�LDER
FIRE
POLICE
ADVANCE PLANNING
STREETS
R.OAV. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE /THOMPSON
CABLE TV
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
REA/DOE IPRPA
Z".A,
Rev. 5-07-97
TOTAL