HomeMy WebLinkAboutJFK SENIOR APTS. - PDP - 61-98 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTli 0 A )L . 17 WIN - N, -4A K- 3 vwmmi� IL REAq COLORADO LARRAER COUNTY A SHEET No. 25 OF 31 FORT COLLINS QUADRANGLE 'To y 7. REFERENCES City of Fort Collins, "Storm Drainage Design Criteria and Construction Standards", (SDDCCS), dated May, 1984. Soil Survey of Larimer County Area, Colorado". United States Department of Agriculture Soil Conservation Service and Forest Service. December, 1980. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March, 1969, and Volume 3 dated September, 1992. "McClellands Basin Master Drainage Plan," by Greenhorn & O'Mara, Inc., 1986 "Hydrologic Update to the McClellands Master Drainage Plan (Lemay Avenue to Larimer County Canal No. 2) and Harmony Centre Master Drainage Plan", by Lidstone & Associates, Inc., 1997. 12 0 contractor will be responsible for clearing mud tracked onto city streets on a daily basis. 6.JP Maintenance All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Straw bale dikes or silt fences will require periodic replacement. Sediment traps (behind hay bale barriers) shall be cleaned when accumulated sediments equal about one-half of trap storage capacity. Maintenance is the responsibility of the developer. 6.5 Permanent Stabilization All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation or other permanent erosion control is installed. No soils in areas outside project street rights of way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/ mulch, landscaping, etc.) is installed, unless otherwise approved by the Stormwater Utility. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature and stable enough to control soil erosion as specified in paragraph 11.3.10 of the City of Fort Collins Storm Drainage Construction Standards. 1 6. EROSION CONTROL 6.1 Erosion and Sediment Control Measures Erosion and sedimentation will be controlled on -site by use of inlet filters, silt fences, straw bale barriers, a sediment trap and gravel construction entrances. (See the Final Drainage and Erosion Control Plan for details.) The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. A construction schedule showing the overall period for construction activities is contained in Appendix F and shown on the Final Drainage and Erosion Control Plan. A sediment trap shall be constructed by over -excavating the permanent detention pond located on the west side of the site. Silt fences or straw bale dikes will be utilized in limited areas adjacent to any stripping stockpiles that are created during grading. They will also be used to slow runoff around the perimeter of the site, along the south and east property line. 6.2 Dust Abatement During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance, which has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing nuisance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right-of-way or elsewhere. 6.3 Tracking Mud on City Streets It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights -of -way unless so ordered by the Director of Engineering in writing. Wherever construction vehicles access routes or intersect paved public roads, provisions must be made to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required per the detail shown on the Erosion Control Plan, with base material consisting of 6" coarse aggregate. The 1 10 1 �r TABLE 5.2 — DETENTION POND 305 AREA -CAPACITY RATING CURVE Elevation Area Area (ac) Cumulative Storage (ac-ft) 18.00 0 0 0 19.00 1946 0.0447 0.015 20.00 6094 0.1399 0.103 21.00 8248 0.1893 0.267 22.00 1 11293 1 0.2592 1 0.490 TABLE 5.3 — DETENTION POND 305 CAPACITY -DISCHARGE_ RATING CURVE Remarks Elevation (ft) Storage (ac-ft) Outlet Q (cfs) 18.00 0.000 0.00 19.00 0.015 0.40 10-yr WSEL- 19.80 0.080 0.56 20.00 0.103 0.60 21.00 0.267 0.74 100-yr WSEL- 21.80 0.440 0.84 spill elev - 22.00 0.490 0.86 top of berm - 22.00 0.490 0.86 Stora e: See Table 5.2 Area -Capacity Rating Curve 10 yr Outlet: 15" pipe w/ 4" dia. Orifice plate 100 yr Outlet: 15" pi2e w/ 4" dia. Orifice plate 0 pond outlet structure is included in the Final Utility Plans for the site. Orifice plate sizing and the stage -discharge curve was calculated using the orifice equation which states, Qo = CoAo [2g(h-Eo)]1/2 (4) where Qo =orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration Ao = effective area of the orifice (ft) E. = geometeric center elevation of the orifice (ft) h = water surface elevation (ft) n The pond outlet structure will be connected to the proposed storm sewer adjacent to JFK tParkway. The volume available for detention storage was calculated using the following formula, V = 1/3 d [A+B+sgrt(AB)] (5) Where V = Volume between contours under questions, cu. Ft. d = depth between contours, ft �. A = surface area of contour, ft2 B = surface area of contour line at a depth relevant to d, ft2 The 100-year and 10-year maximum water surface elevations (WSEL) were found by iterating on the outlet orifice size, the resulting pond storage -discharge rating curves and the SWMM analysis detention storage requirements. The required storage volume for the 10-year event is 0.08 acre-feet, and the required storage volume for the 100-year event is 0.44 acre-feet. The final WSEL for the 10-year and 100-year event respectively is 4919.8 feet msl and 4921.8 feet msl. Tables 5.2 and 5.3 summarize the operating parameters for r the proposed detention pond. �. 8 5. AA and BB are subcritical. Sizing for the swales are included in Appendix B and cross sections are shown on the Drainage and Erosion Control Plan. REGIONAL HYDROLOGIC ANALYSIS 5.1 SWMM Analysis The regional hydrologic analysis was performed using MODSWMM. The JFK Apartments site is subcatchment 391 of the LA Report SWM Model. The resistance factors, surface retention storage, and infiltration rates are equal to the recommended values in the Fort Collins SDDCCS Manual and as detailed in said report. TABLE 5.1 SWMM SUBCATCHMENT PARAMETERS Subbasin Basin Width (ft) Area (ac.) % Impervious Slope (ft/ft) 391 600 2.8 70 0.02 Pond 491 from the LA Report SWM Model is included in this model. A SWMM schematic is included in Appendix D. 5.2 Detention Pond Design The proposed pond (491) for JFK Apartments is located on the west side of the site. In accordance with the LA Report criteria, the maximum release rate from the site is 1.0 cfs. This is based upon a development agreement that is part of the LA report. The actual developed 2-year release rate from the site is 0.6 cfs and the 100-year release is 0.8 cfs To meet the allowable release rates, an orifice plate is required for the 100-year outlet pipe and the 10-year outlet pipe for the proposed Type III pond outlet_ A detail of the 7 4. STORM WATER FACILITY DESIGN 4.1 Curb Inlets & Chases Curb inlets, curb cuts or sidewalk culverts are proposed where sump conditions exist or where street runoff carrying capacity is exceeded or where JFK Parkway is collected and discharged into our detention pond. Inlet capacity reduction factors were used to account for inlet clogging. Inlets were sized using the computer program UDMUT that was developed by James C. Y. Guo of the University of Colorado at Denver. Results of UDMUT sizing is equivalent to using Figures 5-2 to 5-6 of the Fort Collins SDDCCS Manual. Computer output files for the inlet sizing are provided in Appendix B of this report. All inlet locations and sizes are shown on the Final Drainage and Erosion Control Plan for the construction of this project. 4.2 Storm Sewer Pipe Storm sewer outlet pipes from inlets are sized based on the theoretical capacity of the inlets. All other culverts are sized to convey the peak flows from Rational Method calculations. The computer program StormCAD, developed by Haestad Methods, Inc., was used for the storm pipe design. StormCAD considers whether a culvert is under inlet or outlet control and if the flow is uniform, varied, or pressurized and applies the appropriate equations (Manning's, Kutter's, Hazen -Williams etc). A flared end section and riprap is required at all storm sewer outfalls. Riprap is sized according to the pipe size and the flow conditions at the outlet. Guidelines from the "Urban Storm Drainage Criteria Manual" (UDFCD) were used to design the riprap outfalls. Calculations for riprap sizing can be found in Appendix E. 4.3 Open Channels �I There are two swales (AA and BB) proposed for the JFK Senior Apartments site. Swale �J AA is designed to, hydraulically connect the parking lot drainage to the culvert entering the north detention area. This swale is inundated by and part of the 100 year storage volume. All of the swales were designed to carry 133% of the major storm runoff (100- year recurrence interval). The maximum channel side slope is 4:1 and flows in swales 6 The appropriate rainfall intensity information was developed based on rainfall intensity duration curves in the SDDCCS Manual. The time of concentration used in the rainfall intensity curves was calculated using the following equation, tc = ti + tt (2) where t, is the time of concentration in minutes, ti is the initial or overland flow time in minutes, and tt is the travel time in the channel, pipe, or gutter in minutes. The initial or overland flow time is calculated with the equation: ti = [1.87(1.1 - CCf)Lo"]/(S)0.33 (3) where L is the length of overland flow in feet (limited to a maximum of 500 feet), S is the average slope of the basin in percent, and C and Cf are as defined previously. All hydrologic calculations associated with the subbasins are attached in the Appendix of this report. Table 3.1 provides a summary of design flows for all subbasins and design points for this site. TABLE 3.1 DRAINAGE SUMMARY TABLE DESIGN POINT SUBBASIN (S) AREA (ac) C 10-YR tc 10-YR (min) Q 10-YR (cfs) C 100-YR tc 100-YR (min) Q 100-YR (cfs) 1 100 0.18 0.46 9.40 0.38 0.58 10.00 0.92 2 100 & 101 0.99 0.79 12.56 3.19 0.99 11.44 8.24 3 100 - 102 1.15 0.76 12.88 3.54 0.96 12.09 9.08 4 103 0.28 0.39 11.11 0.47 0.49 11.11 1.16 5 100-104 & 106 2.78 0.63 12.88 7.06 0.79 12.88 17.60 6 106 0.33 0.84 6.52 1.46 1.00 10.00 2.97 1W l� I The outflow from design point 1 and the runoff from subbasin 101 flow east along a gutter to design point 2. This is located at a sidewalk culvert discharging IF to swale AA. The outflow from design point 2 and the runoff from subbasin 102 are conveyed through swale AA to design point 3. This is located at a culvert under a sidewalk. The culvert directly discharges into the detention area. Runoff. from subbasin 103 is conveyed via overland flow to a sidewalk culvert This is design point 4. The outflow from design point 4 and the runoff from subbasin 104 are conveyed through Swale BB into the detention pond. Runoff from subbasin 105 is free -discharge to JFK Parkway. Runoff from subbasin 106 is collected runoff from JFK Parkway that is conveyed 17 into the detention pond by two — four foot sidewalk culverts into the detention -i pond. This is design point 6. This is the non -tributary area that is collected and detained to compensate for the free -discharge above. �r The detention pond discharges into a release pipe, design point 5, along JFK j Parkway. This connects to an existing storm sewer 350 feet south of our property. t 3.3 Hydrologic Analysis of the Proposed Drainage Conditions The Rational Method was used to determine both 10-year and 100-year peak runoff values for each subbasin. The Rational Method is based on the Rational Formula, Q = CfCIA (1) where Q is the maximum rate of runoff in cubic feet per second (cfs), A is the total area of the basin in acres, Cf is the storm frequency adjustment factor, C is the runoff coefficient, and I is the rainfall intensity in inches per hour. The frequency adjustment factor (Cf) is 1.0 for the initial 10-year storm and 1.25 for the major 100-year storm. 4 r I I flow. An area at the south west corner of our site freely discharges to JFK Parkway. Our access point to JFK Parkway controls our grading to the extent that this area cannot be collected and discharged into the detention area. 1 This free discharge area is counter -balanced by collection and detention of a portion of JFK Parkway's runoff. This is hydraulically connected to the detention pond by sidewalk culvert's. This connection limits the effective use of freeboard in the detention area. Detention is required and will be provided using a detention pond located on the west portion of the site. Total release rate is in accordance with the aforementioned LA Report. The detention pond will released storm water into a proposed storm sewer along the east side of JFK Parkway. This storm sewer will connect into the existing inlet at the low point on the east side of JFK Parkway south of our site. This existing storm sewer system is designed to carry the detained release from our site. The developed impervious percentage of our site is 56% which is below the assumed 70% shown in the LA Report. Street capacity will not be exceeded in JFK Parkway during the minor or major storm events. Street capacity calculations are included in Appendix A. 3.2 Proposed Subbasin Descriptions A summary of the drainage patterns within each subbasin and at each design point is provided in the following discussion. Details of the drainage facility design are included �1 in Section 4. Runoff from subbasin 100 is conveyed via overland flow to a sidewalk culvert. This is design point L_ 3 Storm Drainage Criteria Manual" (UDFCD), 1984, developed by the Denver Regional Council of Governments, was used. The Rational Method was used to calculate peak 10-year minor and 100-yr major runoff values. Local drainage facilities such as curb chases and storm pipes were designed to convey peak flows. Regional hydrologic calculations were made using the runoff block of UDSWM2-PC Rainfall/Runoff Prediction and Watershed Simulation Program (SWMM) endorsed by the Urban Drainage and Flood Control District. 1.5 Master Drainage Basin & Other Drainage Reports This site is included in the McClellands Drainage Basin. The master study for this property is the "McClellands Basin Master Drainage Plan" by Greenhorn and O'Mara, Inc., 1986. This study has been revised by "Hydrologic Update to the McClellands Master Drainage Plan (Lemay Avenue to Larimer County Canal No. 2) and Harmony Centre Master Drainage Plan" by Lidstone and Anderson, Inc., 1997 (LA Report). The LA Report showed and impervious area of 70 percent and a release rate of 1.0 cfs 2. HISTORIC DRAINAGE Historically the JFK Senior Apartments site drains from the north to the south at a slope �) of 1 to 6 percent. Runoff then overflows the south and west property lines. This �J continues south and east across Martin West Properties. This historic system was augmented by the construction of JFK Parkway, inlets, and a piped system to discharge into the Harmony Centre Detention Pond. �J �l 3. DEVELOPED DRAINAGE �J �) 3.1 General Flow Routing The final drainage pattern for JFK Senior Apartments uses the existing drainage patterns as much as possible and routes flows to limit the number of drainage structures required. The site is graded to carry flows away from structures and into the streets and proposed detention ponds. Flows within the site take the form of overlot, swale, street, or conduit `� 2 1. INTRODUCTION 1.1 Project Description The JFK Senior Apartments is a proposed development that consists of apartment buildings, a clubhouse, a parking lot and drive area, and landscape area, including a detention pond. JFK Senior Apartments is located in the Southwest One -Quarter of Section 36, Township 7 North, Range 69 West of the Sixth Principal Meridian, in the City of Ft. Collins, Larimer County, Colorado. The site is bounded by JFK Parkway on the west, Troutman Parkway on the north, by an existing apartment complex within Somerset P.U.D. on the east, and undeveloped land owned by Martin West Property lies to the south. A vicinity map is included after the Table of Contents of this report. 1.2 Existing Site Characteristics The JFK Senior Apartments project site includes approximately 2.88 acres of land that is covered with rangeland grasses and weeds. Soil on the site includes Fort Collins loam (35) and Nunn clay loam (74) according to the "Soil Survey for Larimer County Area, Colorado" (USDA). The Fort Collins and Nunn series consists of deep, well -drained soils that formed in alluvium. The characteristics of the Fort Collins series include slow runoff and slight erosion. The characteristics of the Nunn series include medium runoff, moderate water erosion, and slight wind erosion. The site is within the moderate wind erodibility zone according to the Wind Erodibility Map for the City of Fort Collins. 1.3 Purpose and Scope of Report This report defines the proposed final drainage plan for JFK Senior Apartments, including consideration of all on -site and tributary off -site runoff. The plan includes design of all drainage facilities required for this development. 1.4 Design Criteria & Methods �1 This report was prepared to meet or exceed the submittal requirements established in the "City of Fort Collins Storm Drainage Design Criteria and Construction Standards" (SDDCCS), dated May 1984. Where applicable, the criteria established in the "Urban 1 / VICINITY MAP N.T.S. JFK SENIOR APARTMENTS VICINITY MAP w TABLE OF CONTENTS PAGE ABLEOF CONTENTS...............................................................................................................iii VICINITYMAP............................................................................................................................. iv 1. INTRODUCTION...............................................................................................................1 1.1 Project Description..................................................................................................1 1.2 Existing Site Characteristics....................................................................................1 1.3 Purpose and Scope of Report ..................................................................................1 1.4 Design Criteria & Methods.....................................................................................1 1.5 Master Drainage Basin & Other Drainage Reports ................................................. 2 2. HISTORIC DRAINAGE..................................................................................................... 2 3. DEVELOPED DRAINAGE................................................................................................ 2 3:1 General Flow Routing............................................................................................. 2 3.2 Proposed Subbasin Descriptions............................................................................. 3 3.3 Hydrologic Analysis of Proposed Conditions......................................................... 5 4. STORM WATER FACILITY DESIGN............................................................................ 6 4.1 Curb Inlets & Chases............................................................................................... 6 4.2 Storm Sewer Pipes.................................................................................................. 6 4.3 Open Channels........................................................................................................ 7 5. REGIONAL HYDROLOGIC ANALYSIS.........................................................................7 5.1 SWMM Analysis.....................................................................................................7 5.2 Detention Pond Design............................................................................................ 8 6. EROSION CONTROL...................................................................................................... 11 6.1 Erosion and Sediment Control Measures..............................................................11 6.2 Dust Abatement.....................................................................................................11 6.3 Tracking Mud on City Streets............................................................................... 11 6.4 Maintenance.......................................................................................................... 12 6.5 Permanent Stabilization.........................................................................................12 7. REFERENCES..................................................................................................................13 APPENDIX A - HYDROLOGIC & STREET CAPACITY CALCULATIONS APPENDIX B - INLET, PIPE AND SWALE DESIGN APPENDIX C - DETENTION POND DESIGN APPENDIX D - SWMM ANALYSIS APPENDIX E - RIPRAP DESIGN APPENDIX F - EROSION CONTROL CALCULATIONS APPENDIX G - EXCERPTS FROM OTHER REPORTS iii No Text FINAL DRAINAGE AND EROSION CONTROL STUDY JFK SENIOR APARTMENTS Prepared for: KAUFMAN & BROAD MULTI -HOUSING GROUP, INC. 320 Golden Shore, Suite 200 Longbeach, California 90802 (562)256-2055 Prepared by: JR ENGINEERING, LTD. 2620 E. Prospect Rd., Suite. 190 Fort Collins, Colorado 80525 (970)491-9888 November 23, 1998 Job Number 9212.00