HomeMy WebLinkAboutJFK SENIOR APTS. - PDP - 61-98 - CORRESPONDENCE - REVISIONS (3)Mr. Steve Olt March 10, 1999 Page 4 of 4 32. See Above If you have any questions or comments, or need additional information, please do not hesitate to contact me at (970) 491-9888. Thank you. Sincerely, JR Engineering q D W. 4&WA�- David W. Klockeman, P.E. Project Manager cc: Ms. Janine Walkup, Kaufman & Broad Multi Housing Group Mr. Mike Marini, Kaufman & Broad Multi Housing Group Mr. Steve Olt March 10, 1999 Page 3 of 4 d. Noted. 14. Water/Wastewater — These comments have been addressed with the revised Utility Plans. 15. Stormwater - These comments have been addressed with the revised Utility Plans and Drainage Report. 16. Engineering Department — Mark McCallum - These comments have been addressed with the revised Utility Plans. 17. Transfort — Information only Stormwater 18. Information has been added to the Utility Plans. 19. The drainage scheme has been revised. The majority of the drainage is surface. 20. The storm sewer has been deleted. 21. This has been addressed in the revised Utility Plans and Drainage Report. Engineering 22. Additional Right -of -Way and easements have been included on the revised Utility Plans. 23. The plans have been revised for consistency. 24. Noted. 25. Noted. 26. The traffic circle has been deleted. Planning 27. Noted. 28. The Ownership has been clarified on the revised plans. 29. Noted. Transportation Planning 30. See Above 31. See Above Mr. Steve Olt March 10, 1999 Page 2 of 4 being addressed by separate letter. b. The carports do not have dividers between each stall. Therefore, the standard 24 foot drive aisle is being utilized. C. The request has been changed from an "Alternative Compliance" to a "Modification". d. This information has been added. e. Noted. f. Noted. g. The trash enclosures have been enlarged based on information from Natural Resources. h. The roundabout has been deleted. i. There was no Item i. j. The landscape plan has been revised. k. Two (2) trash enclosures have been provided. 1. The building placement is such that there are numerous units close to accessible parking. M. Carport elevations have been included. n. Noted. See revised plans. o. They are 9' by 17'. 8. Light and Power a. The utility layout has been revised. b. Noted. 9. Engineering Department — Matt Baker — Street Oversizing Fees — Noted. 10. Utility Education Specialist — Noted 11. City Forester — Noted 12. Transportation Planning a. A pedestrian connection to Somerset Apartments is not feasible due to no sidewalks on Somerset west of their buildings as it is the rear of the units with a 6 foot wood privacy fence along the property line. In addition, the southwest corner of their site has a detention pond with inadequate room for a pedestrian connection. b. Noted. C. Gaylen has been coordinated with and she did not have any definite plans at this time. d. The south entrance will be a full access, not just an emergency access. 13. Natural Resources a. The trash enclosures have been revised. b. Noted. (This is the likely scenario.) C. Noted. JREngineering, Ltd. 2620 East Prospect Rd. Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 • FAX (970) 491-9984 www.jreng.com March 10, 1999 Mr. Steve Olt City of Fort Collins — Current Planning 281 North College Avenue P.O. Box 580 Fort Collins, Colorado 80522 Re: JFK Senior Apartments — Review Comment Information Dear Steve: In order to help clarify some of the items identified in your letter of December 30, 1998, we offer the following: (The items are identified by number. In the interest of space, we have not repeated the information presented in your letter.) 1. This item was presented for information only and is noted. 2. Kaufman & Broad will be coordinating with TCI as part of the building permit process. 3. Kaufman & Broad will be coordinating with US West as part of the building permit process. 4. Public Service Company a. The proposed storm sewer has been deleted. b. The proposed tree locations have been modified. 5. Building Inspections comments will be included in the plans submitted by Kaufman & Broad for the building permit process. 6. Poudre Fire Authority a. The driveway will be utilized as the fire lane. A fire service line has been added to all buildings. b. This item will be addressed with the building permit. C. Fire hydrant spacing has been set so that no building is greater than 300 feet from a hydrant. d. The turn -about has been deleted. 7. Zoning Department a. The easement has been moved away from the carports. The parking issue is 4935 North 30th Street 6020 Greenwood Plaza Blvd. 704 Fortino Blvd. West Colorado Springs, Colorado 80919 Englewood, Colorado 80111 Pueblo, Colorado 81008 (719) 593-2593 • FAX (719) 528-6613 (303) 740-9393 • FAX (303) 721-9019 (719) 583-2575 • FAX (719) 583-8119