HomeMy WebLinkAboutLINDEN PARK (KEATING PROP.) - PDP - 62-98B - CORRESPONDENCE - REVISIONS (6)Y
TST, INC.
1. In addition to the natural spillway at the south end of detention Pond A, an area inlet
was placed inside the pond at elevation 4935.00. This consists of a 6' diameter
manhole on Line ST-1 with a grated lid. All elevations on outlet structures have been
placed on detail Sheet 41.
2. Acknowledged
3. Acknowledged
4. Acknowledged - R.O.W. has been shown on the grading and drainage sheets — swale
is within the R.O.W.
5. Acknowledged. Refer to drainage report and drainage & grading sheets.
6. Acknowledged
7. Acknowledged
8. Acknowledged
9. Operation & annual maintenance will be performed by the adjacent landowner.
Repairs will be performed by the Home Owners Association.
10. We are only providing 40 cfs to enter into Line ST-1. This excess capacity was for
the landowners south of the property. We are not evaluating their runoff. This is
excess capacity that they can enter into the pipe if they desire to.
EROSION/SEDIMENT CONTROL COMMENTS:
1. You must not have the newest plan set. Silt fence & straw bale dikes are shown on
sheets 5 & 6 and also on 42 & 43. There is also no duplication of note #8. Plans
have been standardized.
2. Acknowledged
3. Acknowledged
Sincerely,
Kevin Ash, P.E.
TST, INC. CONSULTING ENGINEERS
TST, INC.
♦ Signing and striping to be implemented with coordination of Timberline design.
Conceptual signing and striping are shown on street, grading and utility.
♦ One crosswalk was deleted at each intersection surrounding the oval.
♦ Detail calls for painted crosswalk.
POUDRE FIRE AUTHORITY
♦ Address numerals comment — acknowledged.
♦ Water supply — acknowledged.
♦ Required access — acknowledged.
♦ LETA approved street names.
LIGHT & POWER
♦ Developer has been in contact with Doug Martine and a supply arrangement is being
worked out.
♦ Street trees coordination will need to be done.
AT&T DIGITAL
• Contact with AT&T will need to occur prior to the placing of a rear lot easement
along lots 173-184.
POST OFFICE
♦ Street names have been approved by LETA.
TRANSPORTATION PLANNING
♦ Crosswalk at Golden Willow and Fossil Creek Parkway was adjusted to be
perpendicular with the street.
NATURAL RESOURCES
1. Acknowledged, changes were made to the construction drawings
2. Acknowledged, the client will be responsible for submitting the letter of intent.
3. Acknowledged, the construction for the off site sanitary sewer will take place
between July 15"' and October 15".
STORMWATER UTILITY
TST, INC.
♦ A detail is provided on the utility plan showing the cross-section of the
bike/pedestrian path in Tract F.
♦ The internal bike paths were revised in accordance with City Detail D-4.
♦ The enhanced walk on Golden Willow Drive is now perpendicular with the street.
♦ An access ramp is now provided at the elbow intersection of Prairie Hill Drive and
Golden Willow Drive.
OFF -SITE SANITARY SEWER PLAN & PROFILE
♦ Easements submitted by developer.
OFF -SITE STORM SEWER PLAN & PROFILE
♦ Easements submitted by developer.
LOCAL STREETS
♦ Stub streets have a profile design. More spot elevations are now provided.
♦ Profile designs extend for 500 feet.
PRAIRIE HILL DRIVE EAST (29)
♦ Spot elevations added and checked.
FOSSIL CREEK PARKWAY EAST (30)
♦ Variance submitted for 100-foot tangent.
♦ 12' Crosspan added to intersection with Timberline.
♦ Vertical curve added to intersection with White Willow Drive to maintain necessary
drainage high point.
FALCON RIDGE DRIVE EAST (31)
♦ Curves adjusted.
♦ Flowline shown through Corona Drive intersection.
GOLDEN WILLOW DRIVE (33)
♦ Vertical curve put into intersection with Falcon Ridge Drive.
PRAIRIE HILL DRIVE
♦ Through street — crowns removed/curb returns shown.
♦ Minimum k-values used.
TRAFFIC IMPACT STUDY COMMENTS
♦ Conceptual striping and signing information was added to street, utility and grading
sheet.
SOILS REPORT COMMENTS
♦ Hydrogeologic report submitted and design added to sanitary sewer sheets.
TRAFFIC OPERATIONS
u
March 20, 2000
Mr. Ron Fuchs
City of Fort Collins Current Planning
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Linden Park P.D.P.
Project No. 0930-001
Dear Mr. Fuchs:
Enclosed are responses to the City of Fort Collins comment sheets from the review of the
Linden Park P.D.P. submittal on January 11, 2000.
ENGINEERING
GENERAL COMMENTS
♦ A hydrogeological study is included with this submittal.
♦ Easements and letters of intent are included with this submittal.
♦ Conceptual signing and striping is included with this submittal.
COVER SHEET
♦ Plat was numbered separately from Utility Plans in previous submittal (sheets 1-3).
If there is something else required please specify.
PLAT
♦ Open Space A is now an access and drainage easement.
♦ Drainage easements were revised to include the angle of the storm sewer in lots 69
and 164.
♦ A signature block for the downstream users of the irrigation ditch is provided and the
ditch owners specified.
GRADING SHEET
♦ Easements are submitted from the Developer with this submittal.
♦ Temporary construction easements are now provided. Drainage is less than 100-year
historic, therefore drainage easements at the end of the stub -outs are not needed.
Grading to be done on -site except where otherwise noted.
♦ Signature blocks are added.
OVERALL UTILITY PLAN
TSTINC. 748 Whalers Way - Building D
102 Inverness Terrace East
7 Fort Collins, CO 80525
Suite 105
Consulting Engineers (970) 226-0557
Englewood, CO 80112
Metm (303) 595-9103
(303) 792.0557
Fax (970) 226-0204
Fax (303) 792.9419
Email info@tstinc.com
www.tstinc.com