HomeMy WebLinkAboutASCENT STUDIO CLIMBING & FITNESS - MJA - MJA140003 - CORRESPONDENCE -08/19/2014: See red lined utility plans for other comments and revisions to labels and notes on
the plans.
Comment Number: 6 Comment Originated: 08/19/2014
08/19/2014: At final, additional standard details will be required on the plans.
Comment Number: 3
Comment Originated: 08/19/2014
08/19/2014: Transportation Planning staff has commented on a lack on internal pedestrian
connectivity. Such as between the climbing studio and Burger King, there is no sidewalk to get
from one to another - you have to cut through several parking lots.
Topic: Site Plan
Comment Number: 1 Comment Originated: 08/19/2014
08/19/2014: no external related traffic comments
Department: Water Conservation
Contact: Eric Olson, 970-221-6704,
Topic: General
Comment Number:
Topic: Landscape Plans
Comment Number: 1
eolson &fcgov.com
Comment Originated: 08/18/2014
Comment Originated: 08/18/2014
08/18/2014: Perovska Atriplicifolia (Russian Sage), has been removed from the City of Fort
Collins Plant List. Please replace with a plant variety from the current list. If you have questions
contact Eric Olson at eolson@fcgov.com or 970-221-6704.
Comment Number: 2
Comment Originated: 08/18/2014
08/18/2014: Irrigation plans are required no later than at the time of building permit. The
irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use
Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or
eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffinpton(a-fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 08/19/2014
08/19/2014: The existing water main material within this development is D.I.P.; therefore, the
re-route of the existing main must also be D.I.P. Add appropriate labels and notes.
Comment Number: 2 Comment Originated: 08/19/2014
08/19/2014: The area west of the building is extremely congested with utilities and contains
considerable landscaping. Another option is needed such as extending fire line and domestic
water service from the water main in Joseph Allen Drive.
Comment Number: 3 Comment Originated: 08/19/2014
08/19/2014: Add a sewer service for the proposed building.
Comment Number: 4 Comment Originated: 08/19/2014
08/19/2014: The original utility plan included a fire hydrant on the north/south main which is
being re -located; however, none is shown on the plan. There is presently no good way to
flush the re -located main following disinfection. Consider adding a fire hydrant.
Comment Number: 5 Comment Originated: 08/19/2014
needed. See redlines.
Comment Number: 10 Comment Originated: 08/15/2014
08/15/2014: There are text over text issues. See redlines.
Topic: Landscape Plans
Comment Number: 11 Comment Originated: 08/15/2014
08/15/2014: There are line over text issues. See redlines.
Comment Number: 12 Comment Originated: 08/15/2014
08/15/2014: Please mask all text in hatched areas. See redlines.
Comment Number: 13 Comment Originated: 08/15/2014
08/15/2014: Please change the title to "Lot 2, Timberline Center, Second Filing". See redlines.
Topic: Lighting Plan
Comment Number: 14 Comment Originated: 08/15/2014
08/15/2014: Please change the title to "Lot 2, Timberline Center, Second Filing".
Topic: Plat
Comment Number: 15 Comment Originated: 08/15/2014
08/15/2014: Please add "Filing" to the title. See redlines.
Comment Number: 16 Comment Originated: 08/15/2014
08/15/2014: Please remove the addresses from the title & title block. See redlines.
Comment Number: 18 Comment Originated: 08/15/2014
08/15/2014: Please provide a closure for the boundary. Please email it directly to Jeff at
jcounty@fcgov.com.
Comment Number: 19 Comment Originated: 08/15/2014
08/15/2014: Please remove the duplicate "Lot 1" & "Lot 2". See redlines.
Comment Number: 20 Comment Originated: 08/15/2014
08/15/2014: All easements must be labeled & locatable. See redlines.
Topic: Site Plan
Comment Number: 21 Comment Originated: 08/15/2014
08/15/2014: Please remove "by this plat' from the note that is marked. See redlines.
Comment Number: 22 Comment Originated: 08/15/2014
08/15/2014: Please change the title to "Lot 2, Timberline Center, Second Filing". See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson(a)fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 08/19/2014
08/19/2014: Internal circulation and parking seems a bit odd. There is head -in parking from the
access road on the north side of the parcel -this seems better suited as a connection road?
within a building, public -safety radio amplification systems shall be designed and installed in
accordance with criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau
Admin Policy #07-01
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(Mcgov.com
Topic: General
Comment Number: 1
Comment Originated: 08/19/2014
08/19/2014: The allowable amount of surface runoff relative to the porous pavement is between
2 and 3 to 1. The site plan proposes greater than this. Please revise and provide addition LID
techniques to meet the 50% treated impervious area requirement.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcountyMcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 08/15/2014
08/15/2014: There are line over text issues. See redlines.
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 08/15/2014
08/15/2014: Please change the title to "Lot 2, Timberline Center, Second Filing". See redlines.
Comment Number: 3 Comment Originated: 08/15/2014
08/15/2014: Please change the title to "Timberline Center, Second Filing' , and remove "Site
Plan Amendment". See redlines.
Comment Number: 4 Comment Originated: 08/15/2014
08/15/2014: Please remove "A portion of Lots 12 & 13, Timberline Center," from the sub -title.
See redlines.
Comment Number: 5 Comment Originated: 08/15/2014
08/15/2014: Please change the sheet 3 title in the index. See redlines.
Comment Number: 6 Comment Originated: 08/15/2014
08/15/2014: The City has moved to the NAVD88 vertical datum. Please provide elevations for
both the NAVD88 & NGVD29 (Unadjusted) datums, state the project datum, and provide an
equation to get from NAVD88 to NGVD29 Unadjusted, i.e. NAVD88 = NGVD29 Unadjusted +
Please use the November 2013 publishing of the City Of Fort Collins Vertical Control Network.
The elevation of 17-92 has changed, and we have not had E357 in our network since 2003.
Comment Number: 7 Comment Originated: 08/15/2014
08/15/2014: There are line over text issues. See redlines.
Comment Number: 8 Comment Originated: 08/15/2014
08/15/2014: Please mask all text in hatched areas. See redlines.
Comment Number: 9 Comment Originated: 08/15/2014
08/15/2014: Please correct the bearings on sheet 5. The boundary information is probably not
970.416.2483 Work
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish(ofcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/15/2014
08/15/2014: Light & Power currently has existing electric facilities running adjacent to this site
along Joseph Allen Dr. There is a 3-phase electric vault at the Southwest comer of the site
which will be the feed for the new transformer on the site.
Comment Number: 2 Comment Originated: 08/15/2014
08/15/2014: Conduit has been stubbed into the site from the existing electric vault at the
Southwest comer of the site. This stub is most likely the painted green t-post as noted on
sheet 1 of the Land Title Survey. This stub looks to be in conflict with the proposed new
building and may need to be relocated.
Comment Number: 3 Comment Originated: 08/15/2014
08/15/2014: Any relocation or modification to existing electric facilities will beat the owners
expense.
Comment Number: 4 Comment Originated: 08/15/2014
08/15/2014: Owner will be required to submit a C-1 Form and a One -line diagram to L & P
Engineering. Also, a transformer location will need to be coordinated within 10' of an all
weather drive over surface. Contact L & P Engineering @ 970-221-6700.
Comment Number: 5 Comment Originated: 08/15/2014
08/15/2014: Owner will be responsible for Electric Capacity Fee and Building Site charges.
Comment Number: Comment Originated: 08/15/2014
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwileropoudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 08/20/2014
08/20/2014: 2012 IFC CODE ADOPTION
The Poudre Fire Authority and the City of Fort Collins have adopted the 2012 International Fire
Code. Building plan reviews shall be subject to the adopted version of the fire code in place at
the time of plan review submittal and permit application.
Comment Number: 2
Comment Originated: 08/20/2014
08/20/2014: EMERGENCY ACCESS EASEMENT
The EAE needs to be shown as continuous and uninterrupted on the plat.
Comment Number: 3 Comment Originated: 08/20/2014
08/20/2014: PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM
New buildings require a fire department, emergency communication system evaluation after the
core/shell but prior to final build out. For the purposes of this section, fire walls.shall not be
used to define separate buildings. Where adequate radio coverage cannot be established
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2011 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS'9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or2012 IECC.
2. Multi -family and Condominiums 3 stories max: 2012 IECC residential chapter.
3. Commercial and Multi -family 4 stories and taller: 2012 IECC commercial chapter.
Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these
requirements can be obtained at the Building Office or contact the above phone number.
Ascent — project specific concerns:
1. Fire -sprinkler systems are required for buildings larger than 5000 sq.ft..
2. New Green Code requires:
a. Upgraded insulation is required for buildings using electric heat or cooling.
b. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min. if building
located within 1000ft to train tracks.
c. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are required.
d. Special combustion safety requirements for natural draft gas appliances.
e. Low VOC interior finishes.
City of Fort Collins
Building Services
Plan Review
416-2341
Contact: Todd Reidenbach, ,
Topic: General
Comment Number: 1
Comment Originated: 08/06/2014
08/06/2014: 1. Addresses will be assigned by the GIS Department after the plans have met
final approval through Development Review and are recorded with the City.
Todd Reidenbach, GISP
GIS Mapping Specialist
teidenbach@fcgov.com
Comment Number: 2
08/20/2014:
Comment Originated: 08/20/2014
Building Permit Pre -Submittal Meeting
Pre -Submittal meetings are offered to assist the designer/builder by assuring, early on in the
design, that the new commercial or multi -family projects are on track to complying with all of the
adopted City codes and Standards listed below. The proposed project should be in the early
to mid -design stage for this meeting to be effective and is typically scheduled after the Current
Planning conceptual review meeting. Applicants of new commercial or multi -family projects are
advised to call 416-2341 to schedule a pre -submittal meeting. Applicants should be prepared
to present site plans, floor plans, and elevations and be able to discuss code issues of
occupancy, square footage and type of construction being proposed.
Trees shall not be planted closer than 4 feet to any gas line, no closer than 6 feet to any water
or sewer service line, no closer than 10 feet to any water or sewer main and no closer than 8
feet to a driveway. A horizontal distance of 40 feet between street trees and street lights and
15 feet between ornamental trees and street lights shall be maintained. Plant material shall be
adjusted in the field to maintain the above clearances.
Comment Number: 2
Comment Originated: 08/19/2014
08/19/2014:
The south most existing street tree along Joesph Allen is a green ash that has been broken off
at about 2 feet and two major stems have grown from below the break. The tree has poor
structure and will not be able to be trained to a standard street tree.
Please show this street tree to be removed and replaced with a hackberry.
Comment Number: 3
08/19/2014:
Comment Originated: 08/19/2014
Label the other three existing street trees in the parkway to remain along Joseph Allen as
Green ash, good condition, and 4-5 inch diameter.
Comment Number: 4
Comment Originated: 08/19/2014
08/19/2014:
The new street tree at the south end of the frontage along Joseph Allen is shown around 5 feet
from the electrical vault. Move this new street tree to 10 feet from the vault.
Department: Internal Services
Contact: Russell Hovland, 970.416.2341, rhovland(a)fcgov.com
Topic: Building Insp Plan Review
Comment Number: 9 Comment Originated: 08/14/2014
08/14/2014: It appears that the private drive is draining more than the allowable surface area of
700 SF onto the public right of way. Please provide spot elevations along the private drive as
well as the existing curb and gutter at the access off Joseph Allen Drive. See redlines.
Comment Number: 10 Comment Originated: 08/14/2014
08/14/2014: Please show the sewer service connection on the Utility Plan.
Comment Number: 11 Comment Originated: 08/14/2014
08/14/2014: It appears that the spacing for the utilities to the west of the building is inadequate.
If spacing requirements and clearances can't be met, consider moving utility connections to the
north or east of the building.
Comment Number: 12 Comment Originated: 08/14/2014
08/14/2014: Please show the existing ADA ramps at the access along Joseph Allen Drive.
Comment Number: 13 Comment Originated: 08/14/2014
08/14/2014: Please add the standard sidewalk repair note to the utility plan and the site plan:
"Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance of
the first Certificate of Occupancy."
Comment Number: 14
Comment Originated: 08/21/2014
08/21/2014: The sidewalk connection to Joseph Allen Drive interfers with the existing ramp
flare. The existing ramp can either be reconstructed to include the proposed connection, or the
proposed sidewalk can be moved further south. If the existing ramp is modified, please
provide a new detail. Please see redlines.
Topic: Plat
Comment Number: 1 Comment Originated: 08/14/2014
08/14/2014: The utility plans show a 20 ft fire lane running through the property. A portion of the
replat shows the fire lane outside of an easement. Please show this area in an easement.
Comment Number: 2 Comment Originated: 08/14/2014
08/14/2014: Please add the following note to the Plat: "There shall be no private conditions,
covenants or restrictions that prohibit or limit the installation of resource conserving equipment
or landscaping that are allowed by Sections 12-120-12-122 of the City Code."
Department: Forestry
Contact: Tim Buchanan, 970-221.6361,
Topic: Landscape Plans
Comment Number: 1
08/19/2014:
Please add this landscape Note:
tuchanan cDfc4ov.com
Comment Originated: 08/19/2014
Are there any light fixtures mounted to the building?
Comment Number: 5 Comment Originated: 08/19/2014
08/19/2014: A note needs to be added to the plans that all signage and locations are not
approved with this major amendment and require a separate sign permit.
Comment Number: 6
Comment Originated: 08/19/2014
08/19/2014: Please a include a sheet index on the site plan or create a cover sheet with the
index and signature blocks.
Also on the site plan include a Table showing the land use, sq ft, parking, bicycle parking...
Comment Number: 7 Comment Originated: 08/19/2014
08/19/2014: LUC 3.5.1(G) Will need the shadow and visual analysis for a buidling over 40ft. in
height.
Comment Number: 8 Comment Originated: 08/19/2014
08/19/2014: Please show the drip line of the overhang to verify that the bicycle parking spaces
are covered.
Comment Number: 9
Comment Originated: 08/19/2014
08/19/2014: Pedestrian connectivity from the site to the lot to the east is not seen in the
proposed plan. Possible solution is a sidewalk along the south property connecting into the
east lot.
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa fcgov.com
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 08/14/2014
08/14/2014: Please change the title of the Utility Plans to read, 'Timberline Center, Second, Lot
2"
Comment Number: 4 Comment Originated: 08/14/2014
08/14/2014: Please add a City of Fort Collins Utility Plan Approval signature block to Sheet 2 of
8 (Topographic Survey). All sheets in the Utility plan must include these signature blocks.
Comment Number: 5 Comment Originated: 08/14/2014
08/14/2014: The curb, gutter and sidewalk detail on Sheet 8 needs to be updated with the
current detail in the Larimer County Urban Area Street Standards. Please refer to Drawings 701,
702, or 703 for the updated drawings.
Comment Number: 6 Comment Originated: 08/14/2014
08/14/2014: Please add the two survey benchmarks for the project to Note 40 of the General
Notes Sheet.
Comment Number: 7 Comment Originated: 08/14/2014
08/14/2014: Please refer to the new lots as Lot 1 and Lot 2, instead of Lot 12 and Lot 13.
Comment Number: 8 Comment Originated: 08/14/2014
08/14/2014: Add scales, legends, symbols and north arrows to all sheets.
Topic: General
City, of `
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6760
970.224.6134 - fax
fcgov. com/devetopmentreview
August 25, 2014
Joe Hosek
RB+B Architects
315 E. Mountain Ave., Ste 100
Fort Collins, CO 80524
RE: Ascent Studio Climbing and Fitness Major Amendment, MJA140003, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Noah Beals, at 970-416-2313 or
nbeals@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Noah Beals, 970-416-2313, nbeals .fcaov.com
Topic: General
Comment Number: 1
Comment Originated: 08/19/2014
08/19/2014: Land Use Code section LUC 3.2.1(D)(1)(c) tree stocking. There needs to be trees
in the landscape areas on east site of the building near entrance, plans are only showing
shrubs.
Need to include trees along the west side of building.
Comment Number: 2 Comment Originated: 08/19/2014
08/19/2014: Add a note that the addition will require a Minor Amendment and at that time trees
will be added around the addition.
Comment Number: 3 Comment Originated: 08/19/2014
08/19/2014: On the Elevations please included the locations of meters (gas & electric) with a
note that they will be painted to match the building.
Comment Number: 4 Comment Originated: 08/19/2014
08/19/2014: The lighting plan needs to include the average foot candle for the vehicle use area
(parking stalls and drive aisle).
Are there three different light fixtures?