HomeMy WebLinkAboutTRAILHEAD - PDP - 43-02A - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESMountain Vista Subarea Plan Principles and Policies include the
following:
PRINCIPLE MV-LU-1: The Mountain Vista Subarea will have a balance of
residential, commercial, civic and social facilities.
Policy MV-LU-1.1 Regarding a balance of land uses.
By providing the opportunity for a variety of housing choices within the subarea
plan, the Trailhead project presents an integral part of the interrelated
neighborhood districts located to the south of the commercial core.
PRINCIPLE MV-T-1: Consistent with the Land Use Code, the transportation
system within the subarea will have:
1) arterial corridors providing efficient access to and through the subarea,
including major features such as railroad under/overpasses, a new 1-25
interchange, and significant landscape mitigation features.
A Minor Arterial street is planned to go through the Trailhead site, thus providing
an important arterial corridor for the subarea.
Policy MV-T-1.1 Regarding landscape buffers.
Generous landscape buffers will be used along East Vine Drive and the
proposed Minor Arterial street.
PRINCIPLE MV-CAD-3: Neighborhoods in Mountain Vista will be designed
to promote distinct neighborhood structure and identity.
The Trailhead neighborhood will have it's own separate identity, while at the
same time providing pedestrian linkages between Trailhead and other
development.
PRINCIPLE MV-NOL-1 The Mountain Vista Subarea will provide a balanced
system of recreation facilities, parks, trails, natural areas, and open lands.
The Trailhead property provides several important links for the subarea in terms
of open space, parks and trails. Trails and greenways will occur along the
realigned Larimer and Weld Canal at the northern boundary of the property, as
well as a tie in to the along the eastern edge of the property, between Waterglen
and this site.
Page 7 12/23/03
PRINCIPLE AN-2: A wide range of open lands, such as small parks,
squares, greens, play fields, natural areas, orchards and gardens,
greenways, and other outdoor spaces should be integrated into
neighborhoods.
Policy AN-2.1 Neighborhood Parks and Outdoor Spaces
Policy AN-2.3 Untreated Irrigation Water
A small centrally located park will be within walking distance to all of the
residents of the Trailhead neighborhood. Extensive amounts of open space are
included as well as a greenbelt/trail system linking the neighborhoods together.
The trail system will tie into the proposed citywide parks trail system planned for
the northeast part of the City. In addition, the developers plan to use untreated
on -site well water for irrigation of open space areas, lessening the burden on the
public water system.
PRINCIPLE LMN-1: Low Density Mixed -Use Neighborhoods will have an
overall minimum average density of five (5) dwelling units per acre,
achieved with a mix of housing types.
Policy LMN 1.2 Mix of Housing Types and Lot Sizes
The Trailhead neighborhood would include a variety of housing choices for the
community. These include single- family detached, single family attached and
multi -family. In addition, the developers plan to create an opportunity for
affordable housing by integrating low- income residences into the surrounding
neighborhood. The overall minimum density will be five dwelling units per acre.
PRINCIPLE LMN-2: The size, layout and design of a Low Density Mixed -
Use Neighborhood should make it conducive to walking, with all the
dwellings sharing the street and sidewalk system and a Neighborhood
Center.
Policy LMN-2.2 Neighborhood Center
Policy LMN-2.3 Neighborhood Center Location
Policy LMN-2.5 Neighborhood Center Access
Policy LMN-2.8 Access to Transit
Policy LMN-2.9 Outdoor Spaces
A centrally located neighborhood center is situated within walking distance of all
residences. It includes a small park with grassy areas and walking paths, a
community building, and a daycare facility. The center is located adjacent to the
proposed Minor Arterial street, a logical transit stop location.
Page 6 12/23/03
The Trailhead property is located within the Community Growth Management
Area. The required infrastructure standards will be met by improving East Vine
Drive and building internal public streets to current City standards. All utilities
and storm drainage systems will be to City or district standards.
PRINCIPLE GM-5: The provision of adequate public facilities and the
phasing of infrastructure improvements will be important considerations in
the timing and location of development.
Policy GM-5.1 Phasing of Development
Water, sewer, emergency services and schools can adequately serve the
Trailhead development. At least one -sixth of Trailhead's boundary is adjacent to
existing City limits. Water will be provided by ELCO and the water source will be
from Soldier Canyon Water Plant via an existing 6-inch line along Vine Drive and
an existing 24-inch line along Mountain Vista. Water for landscape irrigation will
be provided by on -site wells. Sanitary sewer will connect into an existing 18-inch
Boxelder sanitary sewer line along Vine Drive at the southeast corner of the site.
There is also an existing Boxelder 21-inch sanitary sewer line at the northeast
corner of the site.
PRINCIPLE GM-6: Development will pay it "fair share" of the cost of
providing needed public facilities and services.
Policy GM-6.1 Fees and Development Regulations
Policy GM-6.2 Limited -Income Housing
The Trailhead development will be paying their fair share of the cost of providing
desired public transportation connections. In addition, the project will provide an
opportunity for much -needed affordable housing as identified in the 1999 Priority
Affordable Needs and Strategies Report.
PRINCIPLE ANA: New neighborhoods will be integral parts of the broader
community structure.
Policy AN-1.1 Relationships to Residential Districts
Policy AN-1.2 Street networks
The Trailhead development will be convenient to the proposed Community
Commercial District by utilizing multiple streets connecting into and out of the
neighborhood and by encouraging alternative modes of transportation.
Page 5 12/23/03
PRINCIPLE HSG —1: A variety of housing types and densities will be
available throughout the urban area for all income levels.
Policy HSG-1.2 Housing Supply
Policy HSG-1.4 Land for Residential Development
Policy HSG-1.5 Special Needs Housing
The Trailhead development offers housing opportunities with more affordability
and proximity to the proposed major commercial and employment centers, while
providing a mix of housing types within the development.
PRINCIPLE HSG —2: The City will encourage the creation and expansion of
affordable housing opportunities and preservation of existing housing
stock.
Policy HSG-2.2 Incentives
Policy HSG-2.3 Development Practices
Policy HSG-2.5 Distribution of Affordable Housing
The Trailhead development will provide affordable housing that will help maintain
proportional balance to the wages of the City's labor force in addition to
dispersing this type of development throughout the Fort Collins region.
PRINCIPLE ENV-5: Natural habitat/ecosystems (wildlife, wetlands, and
riparian areas) will be protected and enhanced within the developed
landscape of Fort Collins.
Policy ENV-5.1 Protection and Enhancement
The site contains existing Ponderosa Pine farmstead windbreaks. The
developers intend comply with the buffer standards to preserve these trees and
their wildlife habitat. In addition, the developers will enhance these areas with
existing on -site well water.
PRINCIPLE GM-2: The City will consider the annexation of new territory
into the City limits when the annexation of such property conforms to the
vision, goals, and policies of City Plan
Policy GM-2.1 Annexation Policies
Page 4 12/23/03
Development of this project will create the Minor Arterial Street and Trailhead's
proximity to East Vine Drive will utilize alternative transportation modes.
PRINCIPLE T-5: The City will acknowledge pedestrian travel as a viable
transportation mode and elevate it in importance to be in balance with all
other modes. Direct pedestrian connections will be provided and
encouraged from place of residence to transit, schools, activity centers,
work and public facilities.
Policy T-5.2 Connections
The Trailhead development will provide a network of sidewalks and trails
connecting pedestrian and bicyclists to different parts of the neighborhood, as
well as linking them to the Citywide trail system. Direct sidewalk access from
ends of cul-de-sacs will be provided where logical connections can be made.
PRINCIPLE CAD-1: Each addition to the street system will be designed
with consideration to the visual character and the experience of the
citizens who use the street system and the adjacent property. Together,
the layout of the street network and the streets themselves will contribute
to the character, form and scale of the city.
Policy CAD-1.1 Street Design Standards
Policy CAD-1.2 Street Layout
The proposed street system for the Trailhead development will conform to City
street standards. The pattern and layout of the public streets will be simple,
direct and interconnected. The local streets will tie into the minor arterial at
appropriate distances. The site is designed to incorporate generous green space
and landscaping along the Minor Arterial. Street trees are used throughout the
project to enhance the street layout.
PRINCIPLE ECON-1: The City will pursue a balanced and sustainable
economic development program.
Policy ECON-1.3 Infrastructure and Capital facilities
The site is located within close proximity to the proposed major Community
Commercial District at Summitview Drive and Mountain Vista Drive. Multi modes
of transportation will be available by utilizing the street network and the trail
system. A daycare center is proposed within the Trailhead development, which
provides a convenient location for people working in the nearby employment and
commercial centers.
Page 3 12/23/03
incorporated along irrigation ditches and throughout the site so residents can
easily walk or bike to the neighborhood center as well as the proposed citywide
trail system.
City Plan Principles and Policies achieved by the proposed
Trailhead Project Development Plan
PRINCIPLE LU-1: Growth within the city will promote a compact
development pattern within a well-defined boundary.
Policy LU-1.1 Compact Urban Form
The project is located in a vicinity of the northeast part of town that has been
identified on the City Structure Plan as an area designated for future growth.
PRINCIPLE LU-2: The city will maintain and enhance its character and
sense of place as defined by its neighborhoods, districts, corridors, and
edges.
Policy LU-2.1 City -Wide Structure
Policy LU-2.2 Urban Design
With the northeast part of the City growing in activity, this project will enhance the
urban character of this area, adding residential to the surrounding proposed
commercial and industrial identities, and therefore fitting into the City Structure
Plan. Residential neighborhoods located south of the core commercial district
will be more cohesive without the employment district in the middle.
PRINCIPLE T-1: The physical organization of the city will be supported by
a framework of transportation alternative that maximizes access and
mobility throughout the city, while reducing dependence upon the private
automobile.
Policy T-1.1 Land Use Patterns
Policy T-1.2 Multi -Modal Streets
Policy T-1.4 Adequate Facilities
Policy T-1.3 Street Design Criteria
Page 2 12/23/03
\/F:F1 i P I EiyASSOCIATES INC
Landscape Architecture Urban Design Planning
December 23, 2003
Planning and Zoning Board Members
Bob Barkeen
City of Fort Collins
Planning Department
281 North College Avenue
Fort Collins, CO 80522
RE: Planning Objectives for Trailhead Project Development Plan
Dear Bob,
The Trailhead property consists of 90.93 acres and is located on East Vine Drive,
1/4-mile west of Interstate 25. East Vine Drive borders the site to the south, the
Waterglen development to the east and farmland to the north and west. The
northern boundary of the project runs in a northeasterly direction, paralleling the
Burlington Northern Railroad spur and the Larimer and Weld Canal. Surrounding
zoning is LMN to the east and south, and Larimer County FA1 to the west and
north. The property is currently zoned FA1 Farming in Larimer County. The
property is presently being used for agriculture. The proposed zoning is Low -
Density Mixed -Use Neighborhood District (LMN).
The project is anticipated to be annexed and zoned in February 2004.
The property is contained within the Mountain Vista Subarea Plan and is
currently designated as an Employment District (E) on the Mountain Vista
Subarea Framework Plan and the City of Fort Collins Structure Plan. The
applicants are requesting an LMN District in order to create a diverse
neighborhood and provide an opportunity for quality affordable housing in the
northeast part of town. The Trailhead development will include a variety of
housing choices for the community, with approximately 380 dwelling units
proposed. These include small lot single- family detached, attached two-family
houses and multi -family units containing four to six dwellings in a building. In
addition, the developers plan to create an opportunity for moderately priced
housing by integrating lower- income residences into the project. A centrally
located neighborhood center is situated within walking distance of all dwellings. li
includes a small park with grassy areas and walking paths, a community building,
and a daycare facility. Generous amounts of open space and trails are
Phone 970.224.5828 Fax 970.224.1662
401 West Mountain Ave. Suite 201
Fort Collins, CO 80521-2604 Page 1 12/23/03
vtripley.com