HomeMy WebLinkAbout320 MAPLE STREET - PDP - PDP150025 - SUBMITTAL DOCUMENTS - ROUND 1 -14
Department: Water -Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sboyle((Dfcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/11/2015
08/11/2015: There is an existing'/4-inch commercial water service tapped from
the 16-inch main in Maple and'/4-inch commercial and 3/4-inch domestic
services tapped from the 8-inch main in Meldrum. In addition, there are three
separate sewer services serving the site, two tapped from the main in Meldrum
and one from the main in Maple. All services will need to be reused or
abandoned at the main as part of this development.
Response: All water services will either be reused as -is, or upgraded from their current location. All sanitary
sewer services are currently proposed to be reused.
Comment Number: 2
Comment Originated: 08/11/2015
08/11/2015: Separate water and sewer services will be required for the
commercial and residential portions of the development.
Resoonse: Comment Acknowled-
Comment Number: 3
Comment Originated: 08/11/2015
08/1112015: The water conservation standards for landscape and irrigation will
apply. Information on these requirements can be found at:
hap://www.fcgov.com/standards
Resoonse: Comment Acknowledged
Comment Number: 4 Comment Originated: 08/11/2015
08/11/2015. Development fees and water rights will be due at building permit.
Response: Comment Acknowledges.
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom()fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/11/2015
08/11/2015: Please provide a parking and bicycle parking break down.
Parking requirements are based on bedrooms per unit for the residential
portion and buidling square footage for the commercial portion. We need to see
the breakdown.
Bike Parking has been broken out by type (fixed/enclosed) as well as locations.
Comment Number: 2 Comment Originated: 08/11/2015
08/11/2015: Light sources shall be concealed and fully shielded and shall
feature sharp cut-off capability so as to minimize up -light, spill -light, glare and
unnecessary diffusion on adjacent property.
No lighting plan will be submitted as the building covers most of the site. All lighting will be from city ROW
lights. Covered parking garage will be lighted.
Comment Number: 3
Comment Originated. 08/11/2015
LUC 3.5.1 (1) (6) All rooftop mechanical equipment shall be screened from
public view from both above and below by integrating it into building and roof
design.
Response: Comment Acknowledged.
13
($0.1795 sq.-ft.) for new impervious area over 350 sq.-ft., and there is a
$1,045.00/acre ($0.024/sq.-ft.) review fee. No fee is charged for existing
impervious area. These fees are to be paid at the time each building permit is
issued. Information on fees can be found at:
http://www. fcgov. com/uti I ities/busi ness/bu i lders-and-developers/pl ant-investmen
t-development-fees or contact Jean Pakech at 221-6375 for questions on fees.
There is also an erosion control escrow required before the Development
Construction permit is issued. The amount of the escrow is determined by the
design engineer, and is based on the site disturbance area, cost of the
measures, or a minimum amount in accordance with the Fort Collins
Stormwater Manual.
Response: Comment Acknowledged.
Comment Number: 19 Comment Originated: 08/11/2015
08/11/2015: The design of this site must conform to the drainage basin design
of the Old Town Master Drainage Plan as well the Fort Collins Stormwater
Manual.
Response: Comment Acknowledged.
Department: Technical Services
Contact: Jeff County, 970-221-6588,
Topic: General
Comment Number: 1
08/05/2015: No comments.
Department: Traffic Operation
icounty(afcgov.com
Comment Originated: 08/05/2015
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 08/11/2015
08/11/2015: The anticipated traffic volume from this development meets the
threshold for needing a Traffic Impact Study - likely just a memo. Please have
your traffic engineer contact me to scope the study.
Response: Comment Acknowledged. TIS has been provided with the PDP Submittal.
Comment Number: 2 Comment Originated: 08/11/2015
08/11/2015: Its great that all access will be off the alley. This alley will end up
seeing quite a bit of traffic, and we'll need to be careful that the alley access
points at Maple (and Cherry?) have good sight distance, etc.
Response: Comment Acknowledged. Sight triangle is provided.
Comment Number: 3
Comment Originated: 08/11/2015
08/11/2015: Engineering will be able to tell you whether the alley needs any
improvements.
Response: We look forward to this determination from Engineering.
Comment Number: 4 Comment Originated: 08/11/2015
08/11/2015: Does the on -street parking need to change to 1-hr parking for the
retail components? We may need to work with parking services on this.
Response: Comment Acknowledged. This will need to be further evaluated.
12
less than 5,000 square feet of new impervious area on an existing development,
a drainage letter along with a grading plan should be sufficient to document the
existing and proposed drainage patterns. If there is less than 5,000 but more
than 350 square feet of new impervious area; a site grading and erosion control
plan is required instead of a complete construction plan set.
Response: Comment Acknowledged.
Comment Number: 14 Comment Originated: 08/11/2015
08/11/2015: When there is an increase in impervious area greater than 5000
square feet on an existing development, onsite detention is required with a 2
year historic release rate for water quantity. Parking lot detention for water
quantity is allowed as long as it is not deeper than one foot. If there is less than
5000 but more than 350 square feet of new impervious area; a grading and
erosion control plan is required instead of a complete construction plan set.
Response: Comment Acknowledged.
Comment Number: 15 Comment Originated: 08/11/2015
08/11/2015: Alley drainage, particularly in the Old Town Basin, is problematic
and must be accounted for with this development. In particular, any new
stormwater drainage being added to the alley must be safely conveyed to
Maple Street without impacting adjacent properties. This analysis will be
required as part of the drainage design for the site and will need to be included
in the drainage report.
Response: Comment Acknowledged.
Comment Number: 16 Comment Originated: 08/11/2015
08/11/2015: Water quality treatment is also required as described in the Fort
Collins Stormwater Criteria Manual. Extended detention is the usual method
selected for water quality treatment; however the use of any of the BMPs is
encouraged.
(hftp://www.fcgov.com/utilities/business/builders-and-developers/development-f
orms-guidelines-regulations/stormwater-criteria)
Response: Comment Acknowledged.
Comment Number: 17 Comment Originated: 08/11/2015
08/11/2015: Low Impact Development (LID) requirements are required on all
new or redeveloping property which includes sites required to be brought into
compliance with the Land Use Code. These require a higher degree of water
quality treatment for 50% of the new impervious area and 25% of new paved
areas must be pervious. More information and links can be found at:
http://www.fcgov.com/uti I ities/what-we-do/stormwater/stormwater-quality/low-i m
pact -development
Response: Since there is no exposed surface parking, the 25% permeable pavement criterion does not
apply. However, 50% of the total site area will be treated by bioretention planter boxes located in the second
story courtyard.
Comment Number: 18 Comment Originated: 08/11/2015
08/11/2015: The city wide Stormwater development fee (PIF) is $7,817/acre
11
Comment Number: 8
Comment Originated: 08/11/2015
08111/2015: Any construction activities in the flood fringe (e.g. buildings,
fences, driveways, parking lots, sidewalks, utility work, landscaping, etc.) must
be preceded by an approved floodplain use permit, the appropriate permit
application fees, and approved plans.
Response: Comment Acknowledged.
Comment Number: 9
Comment Originated: 08/11/2015
08/11/2015: In addition to obtaining an approved Floodplain Use Permit, any
development in the floodway (utility work, landscaping, paving, curb & gutter,
sidewalks, steps, railings, retaining walls, etc.) must be preceded by a No -Rise
Certification. The No -Rise Certification must be prepared by a professional
engineer licensed in the State of Colorado. The Floodplain Use Permit and the
No -Rise Certification forms can be obtained at
http://www.fegov.com/utilities/what-we-do/stormwater/flooding/forms-documents
Response: Comment Acknowledged.
Comment Number: 10
Comment Originated: 08/11/2015
08/1112015: Development review checklists for floodplain requirements can
also be obtained at
http://www.fcgov.com/utilities/what-we-do/stormwater/flooding/forms-documents
. Please contact Beck Anderson of Stormwater Master Planning at
banderson@fcgov.com for floodplain CAD line work as required per the
floodplain development review check list.
Response: Comment Acknowledged (pending corrective mapping pursuit).
Comment Number: 11
Comment Originated: 08/11/2015
08/11/2015: Please contact Mark Taylor, 970.416.2494, mtaylor@fcgov.com if
you have any questions or wish to schedule a meeting.
Response: Comment Acknowledged.
Contact: Shane Boyle, 970-221-6339, sbovleffcaov.com
Topic: General
Comment Number: 12
Comment Originated: 08/11/2015
08/11/2015: It is important to document the existing impervious area since
drainage requirements and fees are based on new impervious area. An exhibit
showing the existing and proposed impervious areas with a table summarizing
the areas is required prior to the time fees are calculated for each building
permit.
Response: Comment Acknowledged.
Comment Number: 13
Comment Originated: 08/11/2015
08/11/2015: If there is an increase in imperviousness greater than 5,000
square feet a drainage and erosion control report and construction plans are
required and they must be prepared by a Professional Engineer registered in
Colorado. The drainage report must address the four -step process for
selecting structural BMPs. Standard operating procedures (SOPs) for all onsite
drainage facilities need to be prepared by the drainage engineer. If there is
10
Contact: Mark Taylor, 970.416-2494, mtaylor(a)fcgov.com
Topic: Floodplain
Comment Number: 2 Comment Originated: 08/11/2015
08/11/2015: Portions of this site, along the Maple Street frontage, are within the
City -regulatory Old Town 100-year floodplain, and all development in that
floodplain must comply with the safety regulations of Chapter 10 of City
Municipal Code. A City Flood Risk Map is included with these comments.
Response: Comment Acknowledged. Stormwater Staff indicated that a relatively "easy" mapping correction
would likely remove most of the building site from the high risk floodplain. This is the path the Applicant
intends to pursue, with the hopes that mitigation measures will be greatly reduced. In all cases, the
development proposal will comply with Chapter 10.
Comment Number: 3
Comment Originated: 08/11/2015
08/11/2015: Construction of a new mixed -use structure is allowed within the
100-year flood fringe, provided that the lowest floor of the structure as well as all
duct work, heating, ventilation and air-conditioning systems, electrical, hot water
heaters, etc. are elevated a minimum of eighteen -inches above the Base Flood
Elevation (BFE) for the property. That finished floor elevation is known as the
Regulatory Flood Protection Elevation (RFPE = BFE + 18" for mixed -use
structures).
Response: Comment Acknowledged.
Comment Number: 4 Comment Originated: 08/11/2015
08/11/2015: After construction, a FEMA Elevation Certificate must be
submitted to, and approved by, the City before a Certificate of Occupancy will
be issued.
Response: Comment Acknowledged (pending effective mapping).
Comment Number: 5 Comment Originated: 08/11/2015
08/11/2015: As an alternative to elevating the building 18-inches, the building
may be floodproofed up to the RFPE. If floodproofing is chosen as an option all
the requirements of Section 10-38 of City Code must be met. Floodproofing
Guidelines as well as a FEMA Floodproofing Certificate (which will be required
before construction begins, and again after construction is complete and prior
to issuing a Certificate of Occupancy) can be obtained at
http://www.fcgov.com/utilities/what-we-do/stormwater/flood i ng/forms-documents
. FEMA Technical Bulletin 3, "Non -Residential Floodproofing — Requirements
and Certification" can be found at
http://www.fema.gov/media-library-data/20130726-1511-20490-5294/job6.pdf.
Response: Comment Acknowledged.
Comment Number: 6 Comment Originated: 08/11/2015
08/11/2015: Critical Facilities are not allowed in the 100-year floodplain.
Response: Comment Acknowledged.
Comment Number: 7
Comment Originated: 08/11/2015
08/11/2015: Anew mixed -use structure is not allowed within the 100-year
floodway, so it would not be acceptable to have any portion of the building
located in the floodway. Any change in site grading as well as construction of
steps, railings, retaining walls, etc. within the floodway would have to be justified
by a no -rise certification.
Response: Comment Acknowledged.
E
Response: Comment Acknowledged.
GROUP S-2 AUTOMATIC SPRINKLER SYSTEM REQUIREMENTS
> IFC 903.2.9 & 903.2.9.1: An automatic sprinkler system shall be provided
throughout buildings classified as enclosed parking garages (Group S-2
occupancy) in accordance with IBC 406.4 OR where located beneath other
groups. Exception: Enclosed parking garages located beneath Group R3
occupancies.
Response: Comment Acknowledged.
BALCONIES AND DECKS
> IFC 903.3.1.2.1: Sprinkler protection shall be provided for exterior balconies,
decks, and ground floor patios of dwelling units where the building is of Type V
construction.
Response: Comment Acknowledged.
Comment Number: 4
Comment Originated: 08/14/2015
08/14/2015: FDC
> IFC 912.2: Fire Department Connections shall be installed in accordance with
NFPA standards. Fire department connections shall be located on the street
side of buildings, fully visible and recognizable from the street or nearest point
of fire department vehicle access. The location of the FDC shall be approved by
the fire department.
Response: Comment Acknowledged.
Comment Number: 5
Comment Originated: 08/14/2015
08/14/2015: PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM
New buildings require a fire department, emergency communication system
evaluation after the core/shell but prior to final build out. For the purposes of this
section, fire walls shall not be used to define separate buildings. Where
adequate radio coverage cannot be established within a building, public -safety
radio amplification systems shall be designed and installed in accordance with
criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau
Admin Policy #07-01
Response: Comment Acknowledged.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam(@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; Erosion Control Plan,
Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact
Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Response: Comment Acknowledged.
R
In addition to general perimeter access, buildings exceeding 30' in height need
to meet additional fire height access requirements, which the current site plan
does not currently comply with. Please see Appendix D of the 2012 International
Fire Code and contact me with questions. Code language provided below.
AERIAL FIRE APPARATUS ACCESS ROADS - WHERE REQUIRED
> IFC D105.1: Where the vertical distance between the grade plane and the
highest roof surface exceeds 30 feet, approved aerial fire apparatus access
roads shall be provided. For purposes of this section, the highest roof surface
shall be determined by measurement to the eave of a pitched roof, the
intersection of the roof to the exterior wall, or the top of parapet walls, whichever
is greater.
AERIAL FIRE APPARATUS ACCESS ROADS - WIDTH
> IFC D105.2; FCLUC 3.6.2(B)2006; and Local Amendments: Aerial fire
apparatus access roads shall have a minimum unobstructed width of 30 feet,
exclusive of shoulders, in the immediate vicinity of the building or portion
thereof.
AERIAL FIRE APPARATUS ACCESS ROADS - PROXIMITY TO BUILDING
> IFC D105.3: At least one of the required access routes meeting this condition
shall be located within a minimum of 15 feet and a maximum of 30 feet from the
building, and shall be positioned parallel to one entire side of the building. The
side of the building on which the aerial fire apparatus access road is positioned
shall be approved by the fire code official.
Response: Comments Acknowledged. Architect met with Jim Lynxwiler on 11/6/15 to discsuss potential
alternates to the building not meeting the 30 distance requirement. Our proposal will be formalized in a r
equest letter and sent to PFA in the coming weeks.
Comment Number: 2
Comment Originated: 08/14/2015
08/14/2015: WATER SUPPLY
A fire hydrant able to provide 1500 gpm at 20 psi is required within 300' of the
building. The existing utility infrastructure available in the area appears to meet
this requirement however applicant is to verify volume and pressure. Code
language provided below.
Response: Comment Acknowledged.
> IFC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS: Hydrants to
provide 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet
to the building.
Response: Comment Acknowledged.
Comment Number: 3
Comment Originated: 08/14/2015
08/14/2015: AUTOMATIC FIRE SPRINKLER SYSTEM
This building will require an automatic fire sprinkler system under a separate
permit. Please contact Assistant Fire Marshal, Joe Jaramillo with any fire
sprinkler related questions at 970416-2868. Additional requirements shall
apply.
7
Comment Number: 4 Comment Originated: 08/11/2015
08/11/2015: LUC 3.4.7(F)(6), states, "In its consideration of the approval of
plans for properties containing or adjacent to sites... that (a) have been
determined to be ... individually eligible..., the decision maker shall receive and
consider a written recommendation from the Landmark Preservation
Commission 4" This process often takes more than one meeting. Please
contact Historic Preservation staff for scheduling. LPC Work Sessions are held
on the 4th Wednesdays of each month.
Response: Comment Acknowledged. We have a LPC work session schedule for December 9th.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish , cgov.com
Topic: General
Comment Number: 1
Comment Originated: 08/06/2015
08/06/2015: Light & Power has an existing 3-phase service and 2-single phase
services on this site. Any relocation or modification to existing electric services
will be at the developers expense.
Response: Comment Acknowledged.
Comment Number: 2
Comment Originated: 08/06/2015
08/0612015: Developer will need to submit a C-1 Form and a One -line diagram
to electric engineering with load requirements. This will inform Light & Power of
the service size, 3-phase or 1-phase and the voltage you are requesting.
Response: Comment Acknowledged.
Comment Number: 3
Comment Originated: 08/06/2015
08/06/2015: A transformer location will need to be coordinated with Light &
Power and then shown on the site plan. Location needs to be within 10' of a
paved surface accessible by a line truck.
Response: Comment Acknowledged.
Comment Number: 4
Comment Originated: 08/06/2015
08/0612015: Electric Capacity Fee, Building Site charges and system
modification charges will apply. See the following link for estimated Light &
Power charges and Electric Construction Practices, Policies & Procedures.
http://www.fcgov.com/utilities/business/builders-and-developers
Response: Comment Acknowledged.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilynxwiler(a)poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 08/14/2015
08/14/2015: FIRE ACCESS
Fire access is required to within 150' of all exterior portions of the first floor. The
current site plan puts the building at approximately 120' out of access, however
as the building will be equipped with an automatic fire sprinkler system, this out
of access condition is approved.
Response: Comment Acknowledged.
14-72, to determine if it would qualify for recognition as a landmark. The
previous determination of potential eligibility was valid for only one year. The
determination of eligibility requires current color photographs of all sides of
each building or structure, provided by the applicant. Sufficient photos should
be taken to show the current condition of the building, especially any previous
alterations or additions. Additionally, photos of the front elevation of adjacent
buildings or structures are also required, to show the context of the building.
Digital photos are encouraged, and may be sent to kmcwilliams@fcgov.com.
Hard copies may be sent to P.O. Box 580, 80522; or dropped off at CDNS, 1st
Floor, 281 N. College Ave.
Response: Comment Acknowledged.
Comment Number: 2 Comment Originated: 08/04/2015
Updated 08/11/2015:
Because the project is adjacent to eligible or designated historic properties,
then the plans will be reviewed for compliance with LUC Section 3.4.7, Historic
and Cultural Resources.
Response: Comment Acknowledged. We have a LPC work session schedule for December 9th.
Comment Number: 3 Comment Originated: 08/11/2015
08/1112015:
This property is located adjacent to the Emma Mallaby Store and associated
historic buildings. The massing and character of the proposed project is not
compatible with the historic structures. This can be remedied by careful
attention to design. LUC 3.4.7(F)(1)(a) states that, to the maximum extent
feasible, the height, setback and width of new structures shall be similar to
those of existing historic structures on any block face on which the new structure
is located and on any portion of a block face across a local or collector street
from the block face on which the new structure is located ... ;
LUC 3.4.7(F)(2) states that new structures shall be designed to be in character
with such existing historic structures. Horizontal elements, such as cornices,
windows, moldings and sign bands, shall be aligned with those of such existing
historic structures to strengthen the visual ties among buildings. Window
patterns of such existing structures (size, height, number) shall be repeated in
new construction, and the pattern of the primary building entrance facing the
street shall be maintained to the maximum extent feasible.
LUC 3.4.7(F)(3) states that the dominant building material of such existing
historic structures adjacent to or in the immediate vicinity of the proposed
structure shall be used as the primary material for new construction. Variety in
materials can be appropriate, but shall maintain the existing distribution of
materials in the same block.
LUC Division 5.1, Definitions, provides the definition of Maximum Extent
Feasible: Maximum extent feasible shall mean that NO feasible and prudent
alternative exists, and all possible efforts to comply with the regulation or
minimize potential harm or adverse impacts have been undertaken.
Response: Comment Acknowledged. The building design, massing and use of materials have been
carefully selected to mitigate potential negative affects to the adjacent historic and single family structures.
Topic: General
Comment Number: 1
Comment Originated: 08/11/2015
08/11/2015: The applicant should make note of Article 3.2.1(C) that requires
developments to submit plans that "...(4) protects significant trees, natural
systems, and habitat". Note that a significant tree is defined as a tree having
DBH (Diameter at Breast Height) of six inches or more. If any of the trees within
this site have a DBH of greater than six inches, a review of the trees shall be
conducted with Tim Buchanan, City Forester (221-6361) to determine the status
of the existing trees and any mitigation requirements that could result from the
proposed development.
Tree to be removed shown on plans with space for Tim B to note mitigation trees required. All street trees
have been shown as 3" caliper for mitigation.
Comment Number: 2
Comment Originated: 08/11/2015
08/11/2015: If tree mitigation is necessary, please include a note on the tree
mitigation plan or landscape plan, as appropriate, that requires a tree removal
to occur outside of the migratory songbird nesting season (February 1-July 31),
or that a survey be conducted prior to removal to ensure no active nests in the
area.
Noted.
Comment Number: 3
Comment Originated: 08/11/2015
08/11/2015: Our city has an established identity as a forward -thinking
community that cares about the quality of life it offers its citizens and has many
sustainability programs and goals that may benefit your project. Of particular
interest may be the:
1. ClimateWise program: http://www.fcgov.com/climatewise/
2. Zero Waste Plan and the Waste Reduction and Recycling Assistance
Program (WRAP):
http://www.fcgov.com/recycling/pdf/_20120404_WRAP_ProgramOverview.pdf,
contact Caroline Mitchell at 970-221-6288 or cmtichell@fcgov.com
3. Green Building and the Climate Action Plan:
http://www.fcgov.com/enviro/green-building.php, contact Tony Raeker at 970-
416-4238 or traeker@fcgov.com
4. Nature in the City Strategic Plan:
hftp://www.fcgov.com/planning/natureinthecity/?
key=advanceplanning/natureinthecity/, contact Justin Scharton at 970-221-6213
orjscharton@fcgov.com
Please consider the City's sustainability goals and ways for your development
to engage with these efforts.
Noted.
Department: Historical Preservation
Contact: Karen McWilliams, 970-224-6078,
Topic: General
Comment Number: 1
kmcwilliams a()fcgov.com
Comment Originated: 08/04/2015
08/04/2015: This project contains a building that is 50+ years old; the
demolition or exterior changes to this building would need to be reviewed under
the City's Demolition/ Alteration Review Process, Municipal Code Section
4
08/12/2015: Any rain gardens within the right-of-way cannot be used to treat the
development/ site storm runoff. We can look at the use of rain gardens to treat
street flows — the design standards for these are still in development. The
planter areas that are shown on the section provided that will collect the roof
flows and contain a weep hole that would drain out onto and across the
sidewalk are going to be a problem. Roof drains are not allowed to drain
across the sidewalk and the weep holes would drain across the sidewalk.
Rain gardens have been removed from plans.
Comment Number: 12 Comment Originated:
08/12/2015: Doors are not allowed to open out into the right-of-way.
All doors open behind ROW.
Comment Number: 13 Comment Originated:
08/12/2015: Bike parking required for the project cannot be placed within the
right-of-way and if placed just behind the right-of-way need to be placed so that
when bikes are parked they do not extend into the right-of-way. The 4 feet in
which you show bike parking on site is not deep/wide enough to accommodate
bikes without them sticking out onto the sidewalk.
All bike parking outside of ROW.
Comment Number: 14 Comment Originated:
08/12/2015: In regards to construction of this site. The public right-of-way shall
not be used for staging or storage of materials or equipment associated with
the Development, nor shall it be used for parking by any contractors,
subcontractors, or other personnel working for or hired by the Developer to
construct the Development. The Developer will need to find a locations) on
private property to accommodate any necessary Staging and/or parking needs
associated with the completion of the Development. Information on the
location(s) of these areas will be required to be provided to the City as a part of
the Development Construction Permit application.
Noted.
Comment Number: 15
08/12/2015
08/12/2015
08/12/2015
Comment Originated: 08/12/2015
08/12/2015: Any prior variance requests granted with prior projects will not
automatically apply to a new project. Staff, policies, and the project have
changed and as such any variance request would need to be submitted,
justified and reviewed to determine if it would be approved.
Noted.
Comment Number: 16
Comment Originated: 08/12/2015
08/12/2015: The public sidewalk will need to be constructed per standards and
it is unlikely it will be allowed to be of colored concrete.
Colored concrete has been shown outside of ROW.
Comment Number: 17
Comment Originated: 08/12/2015
08/12/2015: Adequate sight distance needs to be provided at the intersection
of the parking and the alley. Columns, walls and objects need to be set back in
order for pedestrians and vehicles exiting and entering the facility to be able to
see traffic within the alley.
Noted.
Department: Environmental Planning
Contact: Kelly Kimple, , kkimpleQfcgov.com
3
08/12/2015: Any public improvements must be designed and built in
accordance with the Larimer County Urban Area Street Standards (LCUASS).
They are available online at:
http://www.larimer.org/engineerinq/GMARdStds/UrbanSt.htm
Noted.
Comment Number: 5
Comment Originated: 08/12/2015
08/12/2015: This project is responsible for dedicating any right-of-way and
easements that are necessary for this project. This shall including the standard
utility easements that are to be provided behind the right-of-way (8 foot along an
alley, and 9 foot along all other street classifications). Right-of-way or easement
shall be provided at the comer of the street intersection and the alley (per
standards).
Noted. Please see informal variances requested under General Note 48 on Sheet CS2.
Comment Number: 6 Comment Originated: 08/12/2015
08/12/2015: Both Maple Street and Meldrum Street are considered local
streets. Improvements to the frontages of the property will be required. Any
existing driveways shall be closed and sidewalk shall be constructed meeting
standards. The alley adjacent to the site is not in the best shape and will need
to be improved (you will want to take a look at the Brownes on Howes plans to
see the profile and design that was approved for that project and will need to tie
into that design).
Entrance into alley has been redesigned on west edge with vertical curb, curb along Maple to be redone as
well as all sidewalks being redone.
Comment Number: 7
Comment Originated: 08/12/2015
08/12/2015: A Development Construction Permit (DCP) will need to be
obtained prior to starting any work on the site.
Comment Number: 8 Comment Originated: 08/12/2015
08/12/2015: Utility plans will be required and a Development Agreement will be
recorded once the project is finalized.
Noted.
Comment Number: 9
Comment Originated: 08/12/2015
08/12/2015: LCUASS parking setbacks (Figure 19-6) apply and will need to
be followed depending on parking design.
Noted.
Comment Number: 10 Comment Originated: 08/12/2015
08/12/2015: All fences, barriers, posts or other encroachments within the public
right-of-way are only permitted upon approval of an encroachment permit.
Applications for encroachment permits shall be made to Engineering
Department for review and approval prior to installation. Encroachment items
shall not be shown on the site plan as they may not be approved, need to be
modified or moved, or if the permit is revoked then the site/ landscape plan is in
non-compliance. All encroachment permits are revocable and as such any
objects that are approved within the right-of-way have to be items that can be
removed from the project.
Comment Number: 11 Comment Originated: 08/12/2015
2
Topic: Site Plan
Comment Number: 1
Comment Originated: 08/12/2015
2nd Floor Courtyard
It appears that that the width and orientation of the 2nd floor coutyard space will
result in this area being cast in shadow during cooler months. Consideration
should be given to shadow impacts to users' comfort.
Response: The courtyard has been orientated to the south to address these comments.
Comment Number: 4 Comment Originated: 08/12/2015
Building Setbacks
Staff does not support the proposed 4' setback along Meld rum Street. The
streetscape transition in this block is to a deeper setback more in keeping with
building to street relationships to the west. A good example is found on the north
end of this block at the Cherry Street lofts, which are setback 12 feet from the
back of the Cherry Street sidewalk to the building face.
Response: The revised design provides a 9'-4" setback along Meldrum and 4'-10" along Maple.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger(a)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 08/12/2015
08/12/2015: Larimer County Road Impact Fees and Street Oversizing Fees
are due at the time of building permit. Please contact Matt Baker at 224-6108 if
you have any questions.
Noted.
Comment Number: 2
Comment Originated: 08/12/2015
08/12/2015: The City's Transportation Development Review Fee (TDRF) is
due at the time of submittal. For additional information on these fees, please
see: http://www.fcgov.com/engineering/dev-review.php
Noted.
Comment Number: 3
Comment Originated: 08/12/2015
08/12/2015: Any damaged curb, gutter and sidewalk existing prior to
construction, as well as streets, sidewalks, curbs and gutters, destroyed,
damaged or removed due to construction of this project, shall be replaced or
restored to City of Fort Collins standards at the Developer's expense prior to
the acceptance of completed improvements and/or prior to the issuance of the
first Certificate of Occupancy. All public sidewalk, driveways and ramps
existing or proposed adjacent or within the site need to meet ADA standards, if
they currently do not, they will need to be reconstructed so that they do meet
current ADA standards as a part of this project.
Noted.
Comment Number: 4 Comment Originated: 08/12/2015
City of
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. coWdevelopmentreview
October 13, 2015
Alex Schuman
Development Company LLC
605 S. College Ave., Suite 100
Fort Collins, CO 80524
RE: 320 Maple Mixed -Use - Preliminary Design Review, PDR150015, Round
Number
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clark Mapes, at 970-221-6225 or cmapes@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Cameron Gloss, cglossMcgov.com
Topic: Building Elevations
Comment Number: 2
Comment Originated: 08/12/2015
Variation in Building Massing
The proposed horizontal building mass along both frontages exceeds the
required height: width ratio of 1:3 without substantial variation in massing that
includes a change in height and projecting or recessed elements.
Response: The revised design meets this requirement.
Comment Number: 3
Comment Originated: 08/12/2015
Building Size, Mass, Bulk and Scale
The proposed design is not compatible with the mass, bulk and scale with the
established character of the surrounding residential area to the north and west.
Section 3.5.1 (C) requires that the building be articulated and subdivided into
massing that is proportional to the mass and scale of other structures within the
abutting and opposing Meldrum face block and cater -corner across the
intersection. Please see Figures 7a and 7b illustrating how infill and
redevelopment buildings must transition to the scale of the surrounding area.
Response: The revised design meets this requirement. Building scale has been reduced on both the north