HomeMy WebLinkAboutOLD TOWN NORTH - 90% PDP - 28-99A - SUBMITTAL DOCUMENTS - ROUND 4 - CITY STAFF (3)Page 2
March 21, 2001
Project No: 1646-01-98
Re: Old Town North — Project Development Plan
We trust that this response has addressed all of your specific comments and concerns. If you
have any questions or further comments during your next detailed project review, please call at
Shear Engineering Corporation
cc: Monica Sweere; Paladian Construction Co.
Troy Jones; City of Ft Collins, Planning
Russel Lee; BHA
March 21, 2001
Project No: 1646-01-98
City of Fort Collins
700 Wood Street
Ft. Collins, CO 80522-0580
Attn: Jeff Hill
Re: Old Town North — Project Development Plan
Response to Water and Wastewater Comments, dated December 12, 2000
Dear Mr. Hill:
This is a response to your project comments regarding Old Town North — Project Development
Plan. Original comments and responses to each are provided:
1. Include standard general note pertaining to utility separation distances and locates on the
landscape plans. Show all water and sewer lines on the final landscape plans.
R See response provided by BHA.
2. Include general note pertaining to water line depths of bury on the overall utilityplan and
D.I.P. encased in poylwrap.
R All notes have been updated and now reflect the Larimer County Urban Street Standards,
dated January 2, 2001.
3. Locate all water mains in streets and not in alley's [sic].
R Water mains have been relocated to the streets.
4. Manholes may not be located in detention ponds. Provide grading contours in order to
prevent manholes from being in detention ponds.
R All manholes are located outside of the detention ponds.
5. Show, label and provide specification for steel casing on existing 12-inch water main. Will
lowerings be needed at channel crossings? Call out and provide details for all lowerings.
R The alignment for the water line crossings are provided. Greater details and specifications
for all channel crossings will be included in the final submittal.
6. See 50% development plans for other comments.
R All review comments on the 50% development plans have been addressed. See 90%
submittal plan set for specific changes.
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com