A Swim model will need to be run
Shear to perform, BHA and Shear to
Shear,
Open
ASAP
to determine detention
1
revise plans
BHA
requirements
END OF.4CTtON ITh Xf1 LIST
Action Items
Item
Description
Action
Owner
Status
Due
1.00
Lake Canal requires a 30' access
Site plan and plat need to reflect
BHA,
Open
ASAP
easement
easement
Shear
1.01
Lake Canal will allow a trail to
Set up meeting with the Lake Canal
Monica
Open
ASAP
coincide with the ditch road and
Company. Meeting should include a
Sweere,
bridge crossings if an maintenance
representative from Natural Resources,
Dave
agreement can be reached with the
Engineering, Traffic, Storm Water and
Stringer
city. Lake Canal Company will
Parks & Rec.
not maintain the trees along lake
canal. A maintenance agreement
will also need to be made between
the city and Lake Canal if the
trees are to remain
1.02
Show Natural areas buffer and
BHA to revise plans.
BHA
Open
ASAP
Wetlands Buffer on site and
landscape plans
1.03
Confirm Ecological
Cedar Creek to review and determine
Cedar
Open
ASAP
Characterization Study determines
appropriate mitigation measures
Creek
quality of wetlands
according to local and national
requirements
1.04
There will not be a trail along
BHA to revise plans
BHA
Open
ASAP
Redwood.
1.05
There will need to be a pedestrian
BHA to review and revise plans
BHA
Open
ASAP
connection to College. A
temporary asphalt sidewalk will
work along Vine Street if it does
not create a rise within the product
6 area.
1.06
Traffic study will need to be
LSC to contact Ward and Kathleen to
BHA, LSC,
Open
ASAP
revised
receive direction. BHA and Monica
Monica
need to determine pedestrian access to
Sweere
College.
1.07
An modification will need to be
B14A to Draft Troy Jones to review.
BHA
Open
ASAP
submitted for side yard setback
requirements
1.08
Utility coordination meeting
Brian Shear and Dave Stringer to
Shear,
Open
ASAP
needs to be held to determine
coordinate meeting.
Dave
feasibility of lot sizes.
Stringer
1.09
Confirm Realigned Vine Drive
Shear engineering to confirm and
Shear,
Open
ASAP
alignment meets City
modify if necessary, BHA to revise
BHA
requirements
site plan if necessary
1.10
Buffering will need to occur
BHA to review and revise plans if
BHA
Open
ASAP
between incompatible uses to the
necessary (Dependent on the status of
south
the trees along Lake Canal)
1.11
Clarify that Dry Creek will not be
BHA and Sheer to revise drawings and
BHA,
Open
ASAP
affected within Phase 1
relevant submittal items
Shear
1.12
Water quality treatment may
Shear to review
Shear
Open
ASAP
occur at edge of detention ponds
Meeting Minutes / Action Items Date: 01/02/00
Old Town North
ATTENDEES OF 12/14/00 MEETING:
Bruce Hendee, Monica Swear,
Brian Shear, Russell Lee,
Dave Stringer, Cam McNair,
Ward Stanford, Tom Dugan,
Glen Schlueter
Peter Barns, Troy Jones,
Kathleen Reavis
Mark Jackson, Jeff Hill
Mike Phelan, Don Magnisum,
Rodney(with Lake Canal)
Meeting Overview:
• The 50% Design Development submittal was reviewed and discussed.
• Lake Canal issues were discussed
• Pedestrian access will be required to tie in with existing pedestrian system.
• The Traffic Study will need to be revised.
• Wetlands will need to be mitigated. Wetland mitigation may occur within the detention area
• Confirm realigned Vine Drive alignment is correct
• Utility coordination meeting will need to occur soon to determine feasibility of lot sizes
• Side yards along residential streets and alleys will need a modification to be less than 15 feet