HomeMy WebLinkAboutOLD TOWN NORTH - 20% PDP - 28-99A - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYW
U
Vine
41
10/42
AM/PM
PHASE 1 SITE GENERATED
PEAK HOUR TRAFFIC Figure 1
U
7
0_
U)
a�
m
v
CN
CD V N
v%�— 7/27
f 18/10
`
5/19 — 1 Vine
12/46
5/19 —o-- 11/6 — co co
15/9 v
AM/PM
J
PHASES 1 & 2 SITE GENERATED
PEAK HOUR TRAFFIC Figure 2
PM Peak Flour
Rate
�.
9
0.65
46
0.36
25
0
0.36
30
0.18
15
9
76
40
9
0.65
33
0.36
18
1
0.36
20
0.18
10
0
53
28
19
129
68
MEMORANDUM
CD
M
LO
o
CO
ch
TO: Monica Sweere, Palladian Construction
'
Ln
Russ Lee, BHA Design
o
City of Fort Collins
co
o
FROM: Matt Delich
o
U
x
DATE: July 24, 2000
o
a
u
a
SUBJECT: Old Town North - Preliminary (20%) Transportation Impact
Uj
Analysis (File: 0048ME01)
0
J
Wo
This memorandum is the Preliminary Transportation Impact
N
Analysis for the Old Town North development, located north of Vine
cc
p
rn
co
Drive and west of future Redwood Drive in Fort Collins. This is a
z
'-9
mixed use development consisting of two phases of residential
o
development and one phase of commercial development. Phase 1
a
S
consists of 70 single family dwelling units and 82 townhome dwelling
Lj
units. Phase 2 consists of 51 single family dwelling units and 56
w
C7
o
townhome dwelling units. The land uses in Phase 3 have not yet been
determined. This preliminary analysis consists of trip generation
N
and an assignment of peak hour trip ends to the key intersections.
N
N
Table 1 shows the daily and peak hour trip generation for
Phases 1 and 2 of Old Town North. These estimates were determined
using Trip Generation, 6u' Edition, ITE as the reference document. The
trip generation for Phase 3 will be determined later in the review
process.
According to available site plans, Phase 1 will access what
appears to be an extension of Blue Spruce Drive. Initially, Blue
Spruce Drive will intersect Vine Drive south of the site. It is
expected that there will be no other public access with Phase 1.
Figure 1 shows the expected site generated traffic at the Vine/Blue
uJ
Spruce intersection with Phase 1 of Old Town North.
a.
i
With Phase 2 of Old Town North, it is expected that there will
¢
be a connection to Redwood Drive at the east end of the site. It is
Zexpected
that Redwood Drive would be completed between Vine Drive and
V
�9
Conifer Street by or before the development of Phase 2 of Old Town
z
North. Figure 2 shows the expected site generated traffic at the
J
U
Vine/Blue Spruce intersection and the Vine/Redwood intersection with
W
o
Phases 1 and 2 of Old Town North. The assignment shown in Figure 2
0
a
assumes that Blue Spruce Drive will not be extended to the north.
Cc
a
A new alignment of Vine Drive is depicted schematically on
W
available site plans. The timing and design of the new Vine Drive
>
a
is not known at this time. Issues concerning the new Vine Drive will
cc
F-
be discussed and resolved during the course of the land use review
W
as
and approval process.