Loading...
HomeMy WebLinkAboutOLD TOWN NORTH - 20% PDP - 28-99A - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYW U Vine 41 10/42 AM/PM PHASE 1 SITE GENERATED PEAK HOUR TRAFFIC Figure 1 U 7 0_ U) a� m v CN CD V N v%�— 7/27 f 18/10 ` 5/19 — 1 Vine 12/46 5/19 —o-- 11/6 — co co 15/9 v AM/PM J PHASES 1 & 2 SITE GENERATED PEAK HOUR TRAFFIC Figure 2 PM Peak Flour Rate �. 9 0.65 46 0.36 25 0 0.36 30 0.18 15 9 76 40 9 0.65 33 0.36 18 1 0.36 20 0.18 10 0 53 28 19 129 68 MEMORANDUM CD M LO o CO ch TO: Monica Sweere, Palladian Construction ' Ln Russ Lee, BHA Design o City of Fort Collins co o FROM: Matt Delich o U x DATE: July 24, 2000 o a u a SUBJECT: Old Town North - Preliminary (20%) Transportation Impact Uj Analysis (File: 0048ME01) 0 J Wo This memorandum is the Preliminary Transportation Impact N Analysis for the Old Town North development, located north of Vine cc p rn co Drive and west of future Redwood Drive in Fort Collins. This is a z '-9 mixed use development consisting of two phases of residential o development and one phase of commercial development. Phase 1 a S consists of 70 single family dwelling units and 82 townhome dwelling Lj units. Phase 2 consists of 51 single family dwelling units and 56 w C7 o townhome dwelling units. The land uses in Phase 3 have not yet been determined. This preliminary analysis consists of trip generation N and an assignment of peak hour trip ends to the key intersections. N N Table 1 shows the daily and peak hour trip generation for Phases 1 and 2 of Old Town North. These estimates were determined using Trip Generation, 6u' Edition, ITE as the reference document. The trip generation for Phase 3 will be determined later in the review process. According to available site plans, Phase 1 will access what appears to be an extension of Blue Spruce Drive. Initially, Blue Spruce Drive will intersect Vine Drive south of the site. It is expected that there will be no other public access with Phase 1. Figure 1 shows the expected site generated traffic at the Vine/Blue uJ Spruce intersection with Phase 1 of Old Town North. a. i With Phase 2 of Old Town North, it is expected that there will ¢ be a connection to Redwood Drive at the east end of the site. It is Zexpected that Redwood Drive would be completed between Vine Drive and V �9 Conifer Street by or before the development of Phase 2 of Old Town z North. Figure 2 shows the expected site generated traffic at the J U Vine/Blue Spruce intersection and the Vine/Redwood intersection with W o Phases 1 and 2 of Old Town North. The assignment shown in Figure 2 0 a assumes that Blue Spruce Drive will not be extended to the north. Cc a A new alignment of Vine Drive is depicted schematically on W available site plans. The timing and design of the new Vine Drive > a is not known at this time. Issues concerning the new Vine Drive will cc F- be discussed and resolved during the course of the land use review W as and approval process. V LL LL a ¢ SQ L