Loading...
HomeMy WebLinkAboutOLD TOWN NORTH - FDP - 28-99C - SUBMITTAL DOCUMENTS - ROUND 1 - CITY STAFF (3)Page 4 January 7, 2002 Project No: 1646-01-98 Re: Old Town North — Project Development Plan Response to Stormwater Comments, dated May 18, 2001 General Comment 1. "Floodplain comments to follow. " R Acknowledged. Floodplain comments have been responded under separate letter. We trust that this response has addressed all of your specific comments and concerns. If you have any questions or further comments during your next detailed project review, please call at (970) 226-5334. Sincere , ----------- Michael Rohlfs Shear Engineering Corporation cc: Monica Sweere; Palladian Construction Co. Troy Jones; City of Ft Collins, Planning Russell Lee; BHA Page 3 January 7, 2002 Project No: 1646-01-98 Re: Old Town North — Project Development Plan Response to Stormwater Comments, dated May 18, 2001 R Acknowledge. Poudre River, Dry Creek floodplains and the Product 6 Corridor boundary are now more clearly presented on a separate sheet title "Floodplain Plan." 2. "Please provide documentation for the 500 year water surface elevations used on sheet 55. How were the elevations developed? " R Two tables are included in Section III.A of the report summarizing the Dry Creek 100-year and 500-year flood elevations. References to the source of the data are discussed in the section. Additionally, the Floodplain administrator (Ms. Marsha Hilmes-Robinson) was contacted and provided assistance in providing accurate elevations. 3. "In the Northern Engineering modeling report dated 5-17-2001, random calculations performed by the Cityfor the discharge using the orifice equation and input values does not agree with the calculations for the orifice rating curve in the report appendix. .41so, the values in the SWMM rating curve do not exactly agree with the rating curve calculations. Please explain. " R Acknowledged. Changes have been made. Please refer to Appendix I — Detention Pond in your review. 4. "Please show the peak water surface elevation, storage, and release rate for the pond on the drainage plan. Currently, there is a rating curve for 61 and 62 but not 61.45 WESL. Please note this information should come from the combined pond model. " R Acknowledged. The rating curve for the pond is shown on the drainage plan. The top of berm elevation is at elevation 61.50 feet. 5. "Please include additional storage -discharge points on the pond -rating curve to reflect the spillway discharge in the report and on the plans. " R The top -of -berm elevation is at 61.50 feet and is included on the rating curve. 6. "The analysis of the culvert connecting the two ponds assumed a 0.5 foot head difference. Please explain this assumption. " R Ackknowledged. This assumption has been reconsidered. Page 2 January 7, 2002 Project No: 1646-01-98 Re: Old Town North — Project Development Plan Response to Stormwater Comments, dated May 18, 2001 columns are partially complete. This design information is still in process. The 100-year WSEL is included for the completing the elevation certificates for the CO. This table may also be found under Appendix VI of the report. R Again, once grading is completed, this table will be formalized and will be provided immediately for your review. 4. "Please provide cross sections of all swales oil the plans and label swales with slope on grading plans. " R Acknowledged. A swale table will be provided summarizing various configurations with call -outs locating the specific location each is applicable to. This table will be included on the grading or drainage sheets. Once completed, this information will be provided immediately for review. 5. "Please provide street capacity calculation per SDDC Manual. Maximum water elevation is not always the same as the curb elevation for the 2-year storm. Also, please add the additional street capacity calculations when completed. " R Street capacity calculations are included in Appendix I of the report for your review. The discussion may be found in Section V.G. of the report. 6. "Please revise the pond rating curve to reflect the new WSEL and spillway elevation and make sure the report is consistent with Northern Engineering's report. " R The revised detention pond -rating curve may be found under Appendix I — Detention Pond for review. Northern Engineering Services' report may be found under Appendix VII of the report. A discussion of the detention pond regarding detention and water quality may be found in the report under Sections V.D and V.E. respectively. SWAM Comments 1. "Please ensure the Poudre River and Dry Creek floodplains (inchiding the product 6 corridor for the Poudre River) are more legible; it is very difficult to discern the floodplains on sheet 54. Please note the SWMM analysis will need to be revised to reflect the final grading and layout of the site. " January 7, 2002 Project No: 1646-01-98 City of Fort Collins P.O. Box 580 700 Wood Street Ft. Collins, CO 80522-0580 Attn: Wes Lamarque Re: Old Town North — Project Development Plan Response to Stormwater Comments, dated May 18, 2001 Dear Mr. Lamarque: This is a response to your project comments regarding Old Town North — Project Development Plan — Type II (LUC) dated May 18, 2001. Original comments and responses to each are provided: I. "Water quality is not currently included in the design for this site. Please provide a water quality outlet structure in the detention pond and calculations in the report. " R Water quality calculations are now included in the Final Drainage and Erosion Control Report (report) for the project. Please refer to Section V.E. of the report for the discussion of the subject. Calculations are provided in Appendix I of the report. 2. "Please provide detailed calculations for storm sewers using either UDSewer or StormCad. Explain any assumptions or expected condition concerning the outfall into Lake Canal. " R A discussion, including assumptions and expected conditions, relating to the outfall into Lake Canal is included in Section V of the report. Calculations are provided in Appendix I of the report. 3. "Please show detailed grading including side -lot swales and high points for all lots. " R Acknowledged. Detailed grading of the lots and side -lot swales are in process. R The 100-year and 500-year WSEL have been calculated and are presented on the Drainage and Erosion Control Notes sheet. A copy of which is included in the Appendix VIII of the report. Information on this sheet also includes the Regulatory Flood Protection Elevation (500 yr WSEL + 1.5 feet). Columns presenting the Actual Finished Grade, Lowest Floor Elevation and the Lowest Floor — 500 yr Elevation are also included. These last three 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 wwwshearengineering.com