HomeMy WebLinkAboutMODIFICATION OF STANDARD (943 E. PROSPECT RD. - RITE AID) - 6-99 - CORRESPONDENCE -M E M O R A N D U M
DT: November 3, 1998
TO: Current Planning
FM: Bruce Vogel, Electric Project Manager
RE: Development Plans Presented at Conceptual Review
The following development plans were presented at the Conceptual Review meeting on
November 3, 1998:
1) Title: Rite Aid
Location: S.W. corner of Prospect Road & Lemay Avenue
Proposal: A Rite Aid Drug Store on a 5 lot site.
Comments: Power is available from existing facilities to the west of the site
along Prospect Road. Light & Power may require owner to provide
utility easements to get power to the site. Due to probable ground
contamination under the old Texeco Station, L. & P. will require
verification of soil conditions and notification of when any ground
clean-up is finished. A transformer location will need to be
coordinated. Normal electric development policies and charges will
apply.
2) Title: Change Of Use
Location: 302 N. Meldrum St.
Proposal: Temporary tenant will move into existing building until new owner can
move in.
Comments: No increase in electrical load is anticipated at this time.
3) Title:
Location:
Proposal:
Comments:
e. Proto-typical corporate architecture will not be allowed. Windows (not
diamond shaped) and building articulation are especially needed along the
Prospect Road and Lemay Avenue building facades. A main entrance (45
degree angle) should be provided at the Prospect Road / Lemay Avenue
intersection. One drive-thru lane is suggested rather than two due to
circulation conflicts. A main entrance at the northeast corner of the building
and a single drive-thru lane might help provide support for modifications to
the N-C Block Standards if needed.
f. Please contact Ginger Dodge at 221-6750 to schedule a development
application submittal appointment.
Please contact Mike Ludwig at 221-6206 with any questions regarding these
comments.
6. The Natural Resources Team provided a dust control handout from the Larimer
County Health Department. Staff requests that a single trash hauler be utilized for
the site. Please provide a trash enclosure that is large enough to accommodate
trash dumpsters and recycling bins. Please utilize native plants and grasses on the
site. The proposed site is contaminated and the ground must be cleaned up prior
to development. A Hazardous Materials Impact Analysis will be required. Please
keep the Natural Resources Team informed on the status of the site clean-up.
Please contact Tom Vosburg at 221-6224 with any questions regarding these
comments.
7. The Stormwater Utility stated that the property is located in the Spring Creek
Drainage Basin (inventory grid #9K). The stormwater development fees for new
development in this basin are $2,175 per acre, subject to the runoff coefficient
reduction. The existing impervious surface area on the site is grand fathered and
must be documented in the drainage study. The standard drainage and erosion
control reports and plans are required and they must be prepared by a professional
engineer registered in Colorado. The primary issues are the existing drainage
patterns and any increase in imperviousness of the site. Any increase in
imperviousness of greater than 350 square feet triggers a full analysis and may
cause the requirement of on -site detention. Detention for '/Z of the adjacent street
is normally required and must be addressed in the drainage report. Since the street
is existing, some judgement or variance may be considered if adequate justification
is provided. There are storm sewers in both Prospect Road and Lemay Avenue
with inlets in both streets. Five parcels are being combined into one site. Off -site
drainage easements may be needed to Spring Creek since a change in the
quantity, quality, and character of the drainage will occur with the re -development
of the 5 lots. Water quality needs to be addressed. Extended detention is the
preferred method. The site does have ground contamination. The applicant will be
cleaning up the site and providing documentation to the City. Please contact Glen
Schlueter at 221-6589 with any questions regarding these comments.
8. The Current Planning Department offers the following comments:
a. The N-C, Neighborhood Commercial District is described in Division 4.19 of
the Land Use Code (Article 4, pp. 127 - 133). The block type standards of
Section 4.19[E][2][b] will be applicable.
b. General Development Standards (such as parking and landscaping
requirements) are described in Article 3 of the Land Use Code.
C. In the event of a conflict between a standard or requirement contained in
Article 3 and Article 4, the standard in Article 4 shall prevail.
d. Pursuant to Section 2.2.2 and Section 2.3.2 of the Land Use Code, a
neighborhood meeting is aQt required prior to the submittal of a development
application.
transformer location with the Light and Power. Utility Engineering Department. The
Current Planning Department will require that the transformer be screened from
public view. Normal development charges will apply. The site (ground) may be
contaminated. Verification of a clean site must be provided before any Light and
Power Utility installations can occur. Please contact Bruce Vogel at 221-6700 with
any questions regarding these comments.
3. The Water and Wastewater Utility stated that there is an 8-inch water main in
Prospect Road and 12-inch water main in Lemay Avenue. There is a 6 or 8-inch
sanitary sewer main in Prospect Road and a 24-inch sanitary sewer main in Lemay
Avenue. There are a number of existing services to the existing properties.. These
services may be used if properly sized. Any un-used services must be abandoned
at the main. The City's Water Conservation Standards for Landscaping and
Irrigation will apply. Plant Investment Fees (PIFs) and water rights will be due at the
issuance of building permit. Plant Investment Fees are scheduled to be revised the
first of January 1999. Please contact Roger Buffington at 221-6681 with any
questions regarding these comments.
4. The Engineering Department stated that a multi -modal Transportation Impact
Study will be required. Please contact Eric Bracke (224-6062) and Kathleen Reavis
(224-6140) to discuss the parameters for the TIS. The Street Oversizing Fee will
range from $3.95 to $4.75 per square foot of building. Please contact Matt Baker
at 224-6108 to determine the exact amount of the street oversizing fee for the
proposed use. Additional right-of-way needs to be dedicated along Prospect Road
and Lemay Avenue. The half right-of-way width for arterial streets is 57.5 feet.
Right-of-way for a right turn lane on east bound Prospect Road must be provided
in addition to the 57.5 feet half -right-of-way width. The right -turn lane is defined as
an all city need and will be constructed at the City's expense. 15-foot wide utility
easements are required along Prospect Road and Lemay Avenue. Bike lanes
must be provided along Prospect Road and Lemay Avenue. Bike lanes are
included in the 57.5-foot half right-of-way width. Sidewalks along Prospect Road
and Lemay Avenue must be detached and 6-feet wide. The parkway strip between
the curb and sidewalk must be 10-feet wide. Standard utility plans and a
development agreement will be required. The access on Prospect Road should
align with access points on the north side of Prospect Road and not conflict with the
right turn lane. A shared driveway may be needed with the adjacent property(s).
The access on Lemay would be limited to right -in / right -out only. Please contact
Sheri Wamhoff at 221-6750 with any questions regarding these comments.
5. The Transportation Planning Department stated that a multi -modal
Transportation Impact Study will be required. Bike parking must be provided near
the building entrances. The existing transit stop on Lemay Avenue must remain.
Please relate the proposed building to this transit stop. Please contact Kathleen
Reavis at 224-6140 with any questions regarding these comments.
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE: November 2, 1998
ITEM: Prospect / Lemay Rite Aid.
APPLICANT: Robin Salvagio
CLC Associates, Inc.
8480 E. Orchard Road, #2000
Englewood, CO 80111
LAND USE DATA: Request for a 13,800 square foot retail building (Rite -Aid) on
approximately 2 acres. The subject property is located at the
southwest corner of Prospect Road and Lemay Avenue.
COMMENTS:
1. The Zoning Department stated that the property is located in a N-C, Neighborhood
Commercial District. Retail establishments are allowed in the N-C District subject
to a Type 1 (Administrative) Review. According to Section 4.19[E][2][a] of the Land
Use Code, the applicant must demonstrate how the development plan contributes
to the overall mix of block types within the surrounding area, but shall not be
required to provide a mix of block types within the development. The development
must comply with the applicable block type standards contained in Section
4.19[E][2][b] of the Land Use Code. Bike parking must be provided near the
building entrance(s). The building must be set back a minimum of 10 feet and a
maximum of 25 feet from the Lemay Avenue and Prospect Road right-of-ways. A
maximum of 4 parking spaces per 1000 square feet are allowed. A minimum of 6%
interior parking lot landscaping is required. The property is located within the
Residential Neighborhood Sign District. Please show the locations of any wall -
mounted signs on the building elevations. Please contact Jenny Nuckolls at 221-
6760 with any questions regarding these comments.
2. The Light and Power Utility stated that the existing overhead power lines will be
removed. Existing street -lights along Prospect Road and Lemay Avenue may need
to be relocated. Electric power will be accessed from the west lot line of the multi-
family / office building (currently stubbed to the west side of the American Family
Insurance building). Easements may be required if the power line extension is not
in the public right-of-way. The developer is responsible for obtaining any necessary
off -site easements. 3-phase power will likely be required. Please coordinate a
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box580 Fort Collins, CO80522-0580 (970)221-6750
CURRENT PLANNING DEPARTMENT
City of Fort Collins
Community Planning and Environmental Services
Current Planning
1�52/0cae�G
- C'� 0 e_6 ti,m � !moo vc�. ..P� �-.� ?�
November 9, 1998 t�1-77. Z - .- - -t_o'�z G2� r �i1 _
Robin Salvagio
CLC Associates, Inc.
fL�sv �O•-04 Ss—'"GyO/F�G��--`� '- /��� (3ot¢D)
8480 E. Orchard Road, #2000
Englewood, CO 80111
- �An �c-�-cr - .¢S ris r v � �S �-s _ GfTiv �o.✓��
Dear Robin, ✓/--i sue.• y - �'l-�u<o<--�
For your information, attached is a copy of the Staffs comments concerning the Prospect
/ Lemay Rite Aid, which was presented before the Conceptual Review Team on
November 2, 1998.
This is a request for a 13,800 square foot retail building (Rite -Aid) on approximately 2
acres. The subject property is located at the southwest corner of Prospect Road and
Lemay Avenue.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may
be made at the time of formal review of this project.
If you should have any questions regarding these comments or'the next steps in the review
process, please feel free to call me at 221-6206.
Sincerely,
Michael Ludwig, AICP
City Planner
xc: Stormwater Utility
City Planner
File
� L2�?�..1 Q ✓F V.r-/Z Go.y � .�VFi✓ �Qec�✓a-ES - �-a,.2 llsRv2c-
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020