Loading...
HomeMy WebLinkAboutOLD TOWN NORTH - 20% PDP - 28-99A - CORRESPONDENCE - MEETING COMMUNICATION (3)Action Items Item Action Owner Status Due 1.00 -Description Can blocks lengths be over 660' if BHA to meet with Ron Gonzales BHA Open 11/27/00 they are broken with alleyways or pedestrian walkways. 1.01 Can the detention release into Set up meeting with the Lake Canal Monica Open 11/27/00 Lake Canal.. Company Sweere, Shear 1.02 Revise plan to change through BHA to revise plans. BHA Open 11/27/00 road to the south. 1.03 Town homes need to have two off BHA to revise plans BHA Open 11/27/00 street parking spaces per unit 1.04 Confirm the location of driplines Trees need to be surveyed Monica Open ASAP of trees along the southern border Sweere of the site Traffic study will need to be BHA and LSC to set up scoping BHA, LSC Open ASAP revised meeting with Ward and Kathleen An alternative compliance will B1 A to Draft. BHA Open 11/27/00 need to be submitted if the 660' connectivity requirement is not met. A preliminary utility coordination Brian Shear and Dave Stringer to Brian Open 11/27/00 meeting needs to be held prior to coordinate meeting at 40% completion Shear, 50% submittal of engineering drawings Dave Stringer EINID OF ACTIOA% I "IENI S LNT Important Dates: November 27`h: Submittal of the 50% design development plans December 181h 1.30 pm.: 50% design development review meeting at 281 North College Meeting Minutes / Action Items Old Town North ATTENDEES OF 10/03/00 MEETING: Bruce Hendee, Monica Swear, Brian Shear, Russell Lee, Dave Stringer, Cam McNair Doug Moore, Kim Kreimeyer Ward Stanford, Glen Schlueter Peter Barns, Troy Jones Roger Buffington, Kathleen Reavis Mark Jackson, Jeff Hill Mike Phelan Meeting Overview: Date: 10/03/00 • The 20% Schematic Design submittal was reviewed and discussed. • Alleys can be public • The North College Access road will be allowed on street parallel parking. • The Traffic Study will need to be revised. • Wetlands will need to be mitigated at 1-1.5 ratio • The through street will change to the street aligning to future Alpine Drive. This street will be a residential local. • Alleys can be used with residential local streets. • There will need to be a 50' buffer from existing wetlands and native trees along the south property line. The following action items were derived from this meeting.