Loading...
HomeMy WebLinkAboutOLD TOWN NORTH - 20% PDP - 28-99A - CORRESPONDENCE - CITY STAFFHAZARDOUS MATERIALS: Corrosive, flammable liquids, reactive, or toxic materials (As defined in the Uniform Fire Code) if used , stored or handled on site must have a Hazardous Materials Impact Analysis (HMIA) completed and supplied to the Planning Department and the Fire Department. FCLUC 3.4.5 (C) NOTE: This note pertains to any future commercial building that may deal with Hazardous Materials. STREET NAMES: Street names shall be verified and reviewed by LETA prior to being put in service. 97 UFC 901.4.5 NOTE: Any street that changes direction shall not have the same name. SPRINKLER REQUIREMENTS: These proposed buildings shall be fire sprinklered. 97 UFC 1003.2.9 NOTE: Sprinklers shall be required for any of the following conditions; 1) Building Area 2) Building Height 3) Number of Units 9/29/00 Comments on Old Town North Schematic Design: The north -south collector street on the west side of Phase 1 will need to be constructed to connect with the existing Vine Drive, south of the project site, as part of Phase 1 of the project. Likewise, the portion of Redwood Street shown as "future Redwood Drive" at the SE corner of the project will need to be constructed with Phase 1, providing the two required access points. Some street oversizing reimbursement is available on collector streets. 2. The local street cost -share of the portion of the realigned Vine Drive that is adjacent to the project will need to be escrowed to the City, to be applied to the future construction of the new Vine Drive. The local street costs of the new Vine Drive can be paid in segments, as each phase of the project is permitted. 3. All of the streets and alleys must meet the City's standards for alignment, grade, tangent, section and sight -distance. At the schematic design stage, it is not possible to determine whether these standards are being met. However, several of the streets appear to be out of conformance with these standards. This will need to be addressed in more detail as design proceeds. 4. The traffic study incorrectly shows the future realigned Vine Drive intersecting with College Avenue at Hemlock Street. It should actually line up with Pinon Street. In fact, the entire context of the project site could be better portrayed by showing existing and future streets more completely. 5. The phasing sequence is different on the site plans and the utility plan. Is the commercial area Phase 2 or 3? 6. The correct name of East Vine Street is East Vine Drive. 7. The correct name of Redwood Drive is Redwood Street. 8. The scale on the site and landscape plans is labeled incorrectly. 9. The typical alley cross-section should show that the inverted crown alley as a concrete pavement. Also, the right-of-way (ROW) should be shown as 12-feet or the entire width of the alley pavement. Utility easements of 8-feet wide on each side of the alley ROW will also need to be dedicated to the City. END OF COMMENTS CAM