HomeMy WebLinkAboutOLD TOWN NORTH - PDP - 28-99A - CORRESPONDENCE - MEETING COMMUNICATION (3)bha design, inc.
MEETING MINUTES
date:
May 8, 2000
meeting No: 2
date of
meeting:03/20/00
location of meeting:
281 N. College
project:
Old Town North
present at meeting:
Bruce Hendee
Dave Stringer
Cam McNair
Brian Shear
Monica Sweere
Kim Kreimeyer
Doug Martine
Glen Schlueter
Mark Jackson
Kathleen Reavis
Peter Barnes
Eric Bracke
Bob Blanchard
Russ Lee
Ward Stanford
Roger Buffington
subject: Due Diligence
Discussion
Owner
The 115' Proposed Vine Street R.O.W. and the 150' Drainage channel be split
BHA, Palladian
between the property owners if the adjacent property owner agrees.
-150' Channel on the Old Town North Side
- The 115' R.O.W. on the property to the north
Verify the 5000cfs number with the coordinating reports from the Army Corp. of
Storm Water (Glen
Engineers and the City of Fort Collins.
Schlueter) to get reports to
Shear engineering
Box Culverts will be allowed to handle the 5000cfs flow
Redwood street is a collector and will need to be realigned and resized
Dave will get a digital or
hardcopy of the Redwood
realignment to Sheer and
BHA
Emergency access (2nd point of access) just needs to be all weather
BHA
Kim and Bruce will meet Cedar Creek, Tim Buchanan and Craig Foreman on site to
BHA to coordinate
evaluate environmental impacts to the site.
Trunk Main can move if the flows are kept the same
City Engineering and Storm Water will meet to resolve issues related to Vine Drive
Cam McNair
BHA will develop a preliminary site plan to promote further discussion
BHA, Palladian
Potential to phase the development
BHA, Palladian
City requires separate water and sewer to detached units
Palladian