HomeMy WebLinkAboutOLD TOWN NORTH - PDP - 28-99A - CORRESPONDENCE - MEETING COMMUNICATIONNAME
Bruce Hendee
PHONE
223-7577
Fax: 223-1827
E-MAIL ADDRESS
bhendee@bhadesign.com
DEPT./COMPANY
BHA Design
Dave Stringer
221-6605
Fax: 221-6378
dstringer@ci.fort-collins.coms
Ron Gonzales
221-6570
rzg@frii.com
P.F.A.
Cam McNair
224-6015
cmcnair@ci.fort-collins.co.us
Engineer
Monica Sweere
229-9033
monica@palladian-construction.com
Palladian
Kim Kreimeyer
221-6641
kkreimeyer@ci.fort-collins.co.us
City Natural
Resources Dept.
Doug Martine
224-6152
dmartine@ci.fort-collins.co.us
Light & Power
Glen Schlueter
224-6065
Fax: 221-6619
Pg: 490-5577
gschlueter@ci.fort-collins.co.us
Stormwater
Mark Jackson
416-2029
Fax: 221-6239
mjackson@ci.fort-collins.co.us
Transp. Planning
Kathleen Reavis
224-6140
Fax: 221-6239
kreavis@ci.fort-collins.co.us
Transp. Planning
Peter Barnes
221-6760
pbarnes@ci.fort-collins.co.us
Zoning
Eric Bracke
224-6062
ebracke@ci.fort-collins.co.us
Traffic
Bob Blanchard
221-6750
bblanchard@ci.fort-collins.co.us
Current Planning
Russ Lee
223-7577
rlee@bhadesign.com
Bha Design
Ward Stanford
221-6820
wstanford@ci.fort-collins.co.us
Traffic
Brian Shear
226-5334
'bshear@shearengineering.com
Shear Engineering
Roger Buffington
221-6584
rbuffington@ci.fort-collins.coms
Water Utilities
a
MEETING MINUTES
date:
April 10, 2000
meeting No: 2
date of n
meeting:03/20100
location of meeting:
281 N. College
project:
Old Town North
present at meeting:
Bruce Hendee
Cam McNair
Monica Sweere
Doug Martine
Mark Jackson
Peter Barnes
Bob Blanchard
Ward Stanford
subject: Due Diligence
Dave Stringer
Brian Shear
Kim Kreimeyer
Glen Schlueter
Kathleen Reavis
Eric Bracke
Russ Lee
Roger Buffington
bha design, inc
Discussion
Owner
The 115' Proposed Vine Street R.O.W. and the 150' Drainage channel be split
BHA, Palladian
between the property owners if the adjacent property owner agrees.
-150' Channel on the Old Town North Side
- The 115' R.O.W. on the property to the north
Verify the 5000cfs number with the coordinating reports from the Army Corp. of
Storm Water (Glen
Engineers and the City of Fort Collins.
Schlueter) to get reports to
Shear engineering
Box Culverts will be allowed to handle the 5000cfs flow
Redwood street is a collector and will need to be realigned and resized
Dave will get a digital or
hardcopy of the Redwood
realignment to Sheer and
BHA
Emergency access (2nd point of access) just needs to be all weather
BHA
Kim and Bruce will meet Cedar Creek, Tim Buchanan and Craig Foreman on site to
BHA to coordinate
evaluate environmental impacts to the site.
Trunk Main can move if the flows are kept the same
City Engineering and Storm Water will meet to resolve issues related to Vine Drive
Cam McNair
BHA will develop a preliminary site plan to promote further discussion
BHA, Palladian
Potential to phase the development
BHA, Palladian
City requires separate water and sewer to detached units
Palladian