HomeMy WebLinkAboutTURNING POINT PLAT - PDP - 12-99 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETft
Project:
Planner:
Engineer:
Traffic Operations:
Date:
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Items Requested
Site land Plat utility Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Engineering
�
✓
✓
Stormwater
Water/Wastewate
Traffic Operations
Trans. Planning
Transfort
Natural Resources
Park Planning
Totals
e ,
•
FILE: PROJECT PLANNER
ENGINEERTNG:PAVEMENT
....-....-.--
•
mallivigo)RO"Al
-.-----.-----
•
mmmmmmmmommmm
PLANNING
WATER C*NSERVATION
PUBLIC SERVICE
SCHOOLS:R.O.W.
' 'E/ THOMPSON
.------.--.--
STATE HIGHWAY DEPARTMENT
• • , ' • 1 i
---.------.--
-
-
-
-
-
-
-
-
-
-
-
-
-
Rev. 5-07-97