HomeMy WebLinkAboutTURNING POINT PLAT - PDP - 12-99 - CORRESPONDENCE - (10)PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: July 6, 1999 TO: Mapping/Drafting
PROJECT: #12-99 Turning Point Plat- PDP - LUC Type I
All comments must be received by Troy Jones no later than the staff
review meeting:
Wednesday, July 21, 1999
6 c) r' T ft Lo r e J C�r6
IU.ut M�tT ST-A rz* f i gv /he
-T'N6 )(('CUT 1N 1G C0n2isrCF ioc3s
�f- N(=- 6A-SFMc►v 1S Aga N(7 Tr--(Z� Sou-rH (��ti� .4I.a--
C4D)1J1-VS fk)F, , Re-ASM- CLA ► 2F �( (13.0g5' ►13,gF5 LTc)
1
(7' f-1hY 13CF Cass Co">=Us)^.,� !F -7-4e Dis-r-A"ccr
'ri-4es SC) uTt4L,inter 0 r 7-I-r>5 Pt--- wA-S ((oC�.0 Ki(-r 2oo•co
AS S 4-4uw o .
C, W S CT
j A1io 0 1999
ji
Ti,
Date: Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site Drainage Report _Other
Utility _Redline Utility _Landscape
I&
City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Plannine
DATE: July 6, 1999 TO: Building Inspections
PROJECT: #12-99 Turning Point Plat— PDP — LUC Type I
All comments must be received by Troy Jones no later than the staff
review meeting:
Wednesday, July 21, 1999
No data regarding Occupancy or Type of Construction which
begins to regulate Building Code requirements. Satisfy building
requirements found in the 1997 Uniform Building Code, the 1992
ANSI Standards for accessibility, the 1996 National Electrical Code,
the 1994 Uniform Plumbing and Mechanical Codes, and the current
Non-residential Energy Code. These requirements should also
include all City of Fort Collins amendments.
Date:- -7// Z / l R Signature: )� 1 GK LEF— 6:y1Maz0 CL f thl.15 1411 p ,,�(
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
Citv of Fort Collins
NOTICE OF OTHER DOCUMENTS
ALL PERSONS TAKE NOTICE THAT THE DEVELOPER AND/OR OWNER HAS
EXECUTED CERTAIN DOCUMENTS PERTAINING TO THIS DEVELOPMENT
WHICH CREATE CERTAIN RIGHTS AND OBLIGATIONS OF THE
DEVELOPMENT, THE DEVELOPER AND/OR SUBSEQUENT OWNERS OF ALL
OR PORTIONS OF THE DEVELOPMENT SITE, MANY OF WHICH OBLIGATIONS
CONSTITUTE PROMISES AND COVENANTS WHICH RUN WITH THE LAND.
THE SAID DOCUMENTS MAY INCLUDE, WITHOUT LIMITATION, THE
DEVELOPMENT AGREEMENT, SITE AND LANDSCAPE COVENANTS, FINAL
SITE PLAN, FINAL LANDSCAPE PLAN, AND ARCHITECTURAL ELEVATIONS,
WHICH DOCUMENTS ARE ON FILE IN THE OFFICE OF THE CLERK OF THE
CITY OF FORT COLLINS AND SHOULD BE CLOSELY EXAMINED BY ALL
PERSONS INTERESTED IN PURCHASING ANY PORTION OF THE
DEVELOPMENT SITE.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: 8 July, 1997 DEPT: Engineering
PROJECT: # 12-99 Turning Point Plat - PDP-LUC Type I
PLANNER: Troy Jones
ENGINEER: Dave stringer
All comments must be received by: 7/21/99
El o Problems
Problems or Concerns (see below or attached)
1. Need to add general notes to utility plan cover sheet
2. Need to label existing and proposed utilities
3. Show size and limits of street, curb,gutter and sidewalk excavation and repair area for water
line installation. All street, CG&S repair shall be done in accordance with City repair
standards.
4. Add note to plan, Final limits of repair area to be determined in the field by City
Engineering Inspector.
5. Add note on plans that all areas of street that are damaged as a result of potholing for
subsurface investigation to locate existing utilities will require a permit from the City Engineer
and shall be repaired as per City standards
6. Show closing of drive approach just west of Shields on Plum, show curb, gutter and
sidewalk type and asphalt repair limits.
-7 -XC -4 / Z
Date: Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: PLAT
(SITE/ LANDSCAPE
G—UTILITY
PROJECT COPY
COMMENT SHEET
Current Planning
DATE: July 6, 1999 DEPT: Water/Wastewater
PROJECT: #12-99 Turning Point Plat — PDP — LUC Type I
All comments must be received by Troy Jones no later than the staff
review meeting:
Wednesday, July 21, 1999
➢ Show and label all proposed fittings, thrust blocks, valves, tapping saddle and
lengths of pipe.
➢ Will a lowering be required at the crossing of the fire line with sanitary sewer
and 8-inch CSU water mains? Pothole all mains which could create conflicts
during construction. Include elevations of potholed mains on plan set.
➢ Label ownership of all existing mains and show existing valves.
➢ Provide city standard detail for thrust blocks. If a lowering of the fire line will
be required, then provide a complete detailed profile of the lowering showing
gravity blocks (size of gravity block and rebar wrapped over fitting), thrust
blocks, elevations of fire line, existing ground and mains being crossed.
➢ Include City standard general notes on plan set.
➢ See plans for other comments.
Date:_ 7Z / 4/29 Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat _ Site _ Drainage Report _Other
X Utility X Redline Utility _ Landscape
City of Fort Collins
8. Park Planning, Forestry, Right of Way Planning, Transfort, Pavement Engineering,
Mapping and Drafting, Poudre R1 Schools, US West, Poudre Fire Authority and Street
Oversizing:
a. I have not received a response from these departments. It is anticipated that they have no
comments. If I receive any comments from these departments, as soon as I receive them, I
will forward them on to you.
9. Current Planning:
a. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on
this letter within 90 days or the project application becomes null and void. Your response
to the City's concerns is due by October 26, 1999. A 30 day extension to this deadline is
available. All requests for an extension should be directed to the Current Planning
Director. If remaining issues are those that do not require plan revisions, a status report
verifying continuing efforts toward resolving the issues is required within the same
timeline.
b. Please increase the utility easement at the NE comer to at least 9 feet as it goes around
the corner.
c. Please make your page title conform to the standard plat title block used in Fort Collins.
See attached example.
d. Please return all redlined plans when you submit revisions.
If you have any questions about these or any other issues related to this project please feel free to
call be at 221-6750.
Yo rs truly,
Tr Jones
City Planner
EA
Commu. j Planning and Environmental vices
Current Planning
City of Fort Collins
STAFF REVIEW COMMENTS
Rebecca Spears
RB&B Architects
315 E. Mountain Ave.
Fort Collins, CO 80524
July 28, 1999
Staff reviewed the Submittal of the Turning Point Plat, and would like to offer the following
comments:
COMMENTS:
1. Water and Sewer Utility Department:
a. See the attached comment sheet and redlined Utility Plans from Water/Wastewater.
2. Engineering Department:
a. The plat needs to include the standard "notice of other documents" text. See attached
document with this text.
b. Please see the attached comment sheet and redlined Utility Plans from the Engineering
Department.
3. Building Inspection:
a. See the attached Building Inspection comment sheet which applies at the time of building
permit.
4. TCI:
a. The utility easement on the NE comer of this project should be larger.
5. Transportation Planning:
a. Please make the sidewalk along West Plum 6 feet wide.
6. Light & Power:
a. The Utility Plan should be revised. Electric lines are underground west of existing
building. Cable TV and Phone are overhead.
7. Stormwater Utility Department, Traffic Operations, Post Office, Public Service,
Advance Planning, Police, Zoning, Natural Resources:
a. These departments have no comment.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020