Loading...
HomeMy WebLinkAboutELIZABETH STREET APARTMENTS - PDP - 19-99A - CORRESPONDENCE - REVISIONSMr. Brian Grubb April 11, 2001 Page 4 14. Free release of Basin 105 — Ponds overdetain for this area. See revised calculations in Drainage Report Appendix. 15. Erosion Control Calculations — See revised Drainage Report Appendix. Poudre Fire Authority: 1. As shown on the plans, a looped emergency access will be platted. At the southeast corner of the site flexible bollards will be placed at the approach to prevent uses other than emergency access. The signing and striping of the fire lane will be completed with the building permit approval process. 2. Address numbers will be addressed with the building permit approval process. 3. A fire hydrant is located within 300 feet of this site. The hydrant is part of the City of Fort Collins water utility's system and it is assumed that the hydrant will have adequate flow rates and pressures. 4. The "Knox Box" will be addressed by the architectural plan submittal. 5. The building sprinkler system will be included within the architectural plan submittal. The civil engineering drawings have provided the site with a 6-inch fire sprinkler service. Advance Planning: 1. The sidewalks are 6 feet wide to allow for 2-feet of car overhang and a passage width of 4feet. 2. I believe the architect has made the appropriate minor architectural changes. We look forward to working with the City to finalize this project. If you have any questions or comments, or need additional information, please do not hesitate to contact me at (970) 491-9888. Thank you. Sincerely, XJohnE. �Tufte, PE Project Engineer cc: Mike Marini, Simpson Housing Kevin Horner, Simpson Housing J. D. Lee Thompson, Simpson Housing Dave Klockeman, JR Engineering Bill Strand, JR Engineering X:\3920000.all\3921202\Correspondancc\March 8, 2001 Comment Responses.doc Mr. Brian Grubb April 11, 2001 Page 3 i 4. Remove topo lines from final landscape plan — noted. 5. Landscape General Note No. 10 — Revised as requested. 6. Compact Parking Spaces must be signed — Compact parking spaces have been removed from the plan. 7. Note building height on elevations — See revised plans. 8. Note proposed building colors on elevations — See revised plans. Larimer County No. 2: 1. 20 feet required adjacent to ditch — Plan has been revised to allow for 20 feet of clear room adjacent to ditch. Streets: No comments. Water Conservation: No comments. Light & Power: No comments. Pnct Office - No comments. Park Planning: No comments. Transportation Planning: 1. Consolidate access — See revised plans. 2. Canal Company access — Provided along easterly and southerly side of ditch per coordination with Ditch Company. 3. Additional V of ROW — Added as requested. 4. Appropriate cross section of Roadway, including bike lanes — Elizabeth Street is not being revised. Therefore, existing striping will not be adjusted. 5. One Way driveway — One way eliminated. Stormwater: 1. Swale cross section and slope — See revised Drainage Report and Plan for information. 2. Clarify tie-ins of proposed to existing grading — See revised grading plan. 3. Copy of proposed off -site drainage easement - Offsite easement is currently being negotiated with CSU and will be provided as soon as it is available. 4. More grading detail in detention areas — See revised plans. 5. Sidewalk culvert detail — See revised plans. 6. Spillway detail — See revised plans. 7. Detention pond depth marker — See revised plans. 8. FES detail — See revised plans. 9. Roof collection pipe for 100-year capacity — Provided in Appendix. 10. Storm Sewer Plans — These plans have been revised to be legible. 11. Detail of proposed Water Quality Outlet Structure — See Table on Detail Sheet. 12. Emergency Spillway Calculations — Provided in Appendix. 13. Correct Tailwater HGL — See revised Drainage Report. X:\3920000.all\3921202\Cotrespondance\March 8, 2001 Comment Responses.doc Mr. Brian Grubb April 11, 2001 Page 2 9. Plat Comment - Larimer Canal #2 signature block has been added to Plat. 10. Plat Comment - The building footprint has been removed from the Plat. 11. Plat Comment - The building has been adjusted so it does not overlap with the utility easement. 12. Plat Comment - Easements have been tied to property boundaries. Technical Services: 1. Plat and Legal Close - Information only. No action required. 2. Lot Designation - This information has been added to the revised Plat. 3. Outer Boundary Monuments - This information has been added to the revised Plat. 4. Drainage and Landscape Easement - Information has been added to the Plat in order to locate this easement. 5. Lot or Tract No. - This information has been added to the revised Plat. 6. Building Envelope - This has been removed from the Plat as it is not required. 7. 15 foot Easement along Elizabeth Street - This has been clarified on the revised Plat. 8. Ditch Easement should have bearings and distances - This information has been added to the revised Plat. Traffic Operations: 1. Remove Eastern Curb Cut or Build Median - This has been revised per meeting with City and PFA. 2. Shields and Elizabeth 2020 LOS F - Information only. Natural Resources: 1. Trash Collections- Trash will be centralized with only one hauler contracted. 2. Trash Enclosure - Internal trash enclosure will accommodate recyclables. Transfort: No comments. Water & Wastewater: 1. Offsite easements - Offsite easement is currently being negotiated with CSU and will be provided as soon as it is available. 2. Sanitary Sewer Service Line - Line has been revised to be 6" at 1%. 3. Coordinate Landscape with Civil Plans - Landscape and Civil Plans have been coordinated. 4. Lowering of proposed fire line - Coordination for potholing is currently underway. Information will be provided to Jeff Hill at W/WW upon completion per telephone discussion. 5. Show all existing and proposed water and sewer mains in area - See revised plans. 6. Show proposed sanitary sewer service in trickle pan profile - See revised plans. 7. Provide traffic rated clean out detail - See revised plans. 8. Include a note to Core Drill existing manhole - See revised plans. 9. Will an irrigation tap be required - Yes. See revised landscape plans. 10. See site, landscape and utility plans for other comments - Noted. AT&T Digital Cable: Service Agreement Required - Noted. Zoning: 1. Trash Enclosure - The trash enclosure is inside the building. 2. Parking stall backup distance on Site Plan - See revised plans. 3. Alternative Compliance for Parking - Additional information provided. XA3920000.all\3921202\Correspondance\March 8, 2001 Comment Responses.doc April 11, 2001 Mr. Brian Grubb, AICP City of Fort Collins — CPES Current Planning 281 North College Avenue P.O. Box 580 Fort Collins, Colorado 80522 ft) J•R ENGINEERING A Subsidiary of Westrian Re: Elizabeth Street Apartments — Review Comment Responses for March 8, 2001 Comments from Current Planning and Other Departments / Utilities Dear Brian: The following are responses to the review comment letter of March 8, 2001 and the individual routing sheets from the various City Departments and Outside Utilities: Current Planning: 1. Refers to 90 days to respond. 2. Park Requirement — See revised plan and supporting documentation. �V. Readability of Site Plan — The Site Plan was revised to be at 1 "=20' as requested. 4. Bike Parking — See revised plans. 5. Landscaping Plan — The plan has been revised to show the groundcover types. 6. Parking Spaces — One parking space was added, bringing the total to 51. A Modification will be pursued for this item. 7. Building Height — The plan has been revised to show the correct building height. 8. Site Lighting — A detail has been provided. 9. Note 12 on Site Plan — Revised as requested (See revised plan). 10. Relocation of Existing Light along Elizabeth — The Site Plan has been revised to show the proposed location. 11. Increase Handicap Spaces from 2 to 4 — This has been revised as requested (see revised Site Plan). 12. Additional 1 foot of ROW will affect the existing Utility Easement— Both the ROW and Utility Easement have been adjusted as requested. 13. Dimensions on Site Plan — These have been shown on revised Site Plan. Engineering: l . Revise Driveway Location — This has been revised to a 2 way driveway on the west side of the site per meeting with City and PFA. 2. One Way Access — This has been eliminated. (See Engineering Response No. 1.) 3. Dedicate Additional ROW — This has been completed as requested. 4. Radius Style Driveways — A Variance Request is included with this re -submittal. 5. Note for Street Patching — Note added to revised plans as requested. 6. Additional Spot Elevations — Additional Spot Elevations provided on revised plans as requested. 7. Sheet 9 is unreadable — Sheet 9 has been revised to the proper scale for legibility. 8. Drainage from eastern driveway — This has been addressed on revised plans. X:\3920000.all\3921202\Correspondance\March 8, 2001 Comment Responses.doc 2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • w ..jrengineering.com