HomeMy WebLinkAboutRESOURCE RECOVERY FARM, SAND & GRAVEL MINE - PDP/FDP - 17-99 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: +f R - 9q 146'Soa> ,t
Planner: s'r�E oc7 Tr4c Operations: 'G cum
Engineer: e-
Date: � if iv 7
Items Requested
Site land Plat I Utility I Drainage Rpt Other Items Required
Engineering
Redlined Items Being Returned
Site land Plat I Utiliq Drainage R t I Other Items Being Returned
Stormwater
-7
,
Gkte—f—,-,
j7— cclwmiev,� f
Water/Wastewate
X57
Traffic Operations
Trans. Planning
rramPrt
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
i
• •
Re visions Routing Sht i
it mm
ENGINEERING: PAVEMENT
BULLDING INSPECTION
��
�����•
MAPPING / DRAFTING
FORESTRY
ADVANCE PLANNING
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
JIM
iii����l�l��■I��I�I
PUBLIC SERVICE
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
����c•�����mm
WNW
mm
"
mmm�mmmmm�
mm
1F , r �wimmmmomommmmm
"Cws 25 # I-c- ��cfz. r2to.,--�ed v,-. 3c)�ti,d2s off- ki ��s s� � •