Loading...
HomeMy WebLinkAboutCLIFF SUBDIVISION REPLAT - PDP - 22-99 - CORRESPONDENCE - (3)Director. If remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the same timeline. b. Please check with Dave Stringer from the Engineering Department about which sheets need to be stamped by an engineer. c. Once you have resolved the fire concerns with Ron Gonzales, we will be clear to schedule you for a Type 1 hearing. d. Please make the corrections indicated from staff comments and bring in four sets of drawings to Troy Jones in the Current Planning Department prior to the hearing. We need to double check that the comments have been satisfied. Be sure and return all your redlined plans when you resubmit the revised plans. If you have any questions about these or any other issues related to this project please feel free to call be at 221-6750. urs truly, Tr oyJones City Planner PA Comma ty Planning and Environmental rvices Current Planning City of Fort Collins Cliff Snyder. 511 E. Prospect Road Fort Collins, CO 80525 STAFF REVIEW COMMENTS September 16, 1999 COMMENTS: 1. Water and Sewer Utility Department: a. See the attached comment sheet and redlined plans from the Water and Sewer Department. 2. Stormwater Utility Department: a. See the attached comment sheet and redlined plans from the Stormwater Utility. 3. Engineering Department: a. See the attached comment sheet and redlined plans from the Engineering Department. 4. Poudre Fire Authority: a. See the attached comment sheet from the Poudre Fire Authority. 5. City Forester, Zoning, Natural Resources, Light and Power, Traffic Operations, Advance Planning, ROW Planning, Post Office, US West, Public Service, Poudre Rl School District, TCI: a. I have not received any comments from these departments. I am assuming they have no comments. 6. Park Planning, Mapping & Drafting, Police: a. These departments have indicated they have no comments. 7. Current Planning: a. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by December 8, 1999. A 30 day extension to this deadline is available. All requests for an extension should be directed to the Current Planning 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020