Loading...
HomeMy WebLinkAboutFOSSIL CREEK WETLANDS 2ND ANNEXATION & ZONING - 13-99A - CORRESPONDENCE -PROJECT COMMENT SHEET DATE: May 17, 2001 TO: Mapping/Drafting PROJECT: #13-99A FOSSIL CREEK WETLANDS 2"D ANNEXATION - TYPE II (LUC) - RECOMMENDATION TO COUNCIL All comments must be received by Troy Jones in Current Planning no later than the staff review meeting: D �] JUN 2. 0 2001 June 20, 2001 Note- Please identify your redlines for future reference /, i3oa OA ZV 'i LEvHc- CLosES_ (/- Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Utility Site _Drainage Report _Other Redline Utility _Landscape Zoning 10 No comments Issue Contact. Jenny Nuckols Be sure and return all of your redlined plans when you re -submit. If you have questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, TROYJONES City Planner 3of3 Park Planning 7 no comments Police 2 No Comments Stormwater Utility 8 no problems Transportation Planning 1 Issue Contact: Craig Foreman Issue Contact: Joseph Gerdom Issue Contact: Basil Hamdan Issue Contact: Mark Jackson Possible MSP Amendments as part of the 1-25 Corridor Regional & Subarea Plans Staff will bring forward later this summer (August/Sept.) a series of recommended Master Street Plan amendments as part of the 1-25 Corridor projects. Two of these amendments directly affect this area. First, Timberline is recommended to be upgraded from a Minor Arterial to a 4L Arterial between Trilby Road and Carpenter/CR 32. Second a new piece of 4L Arterial connecting from Timberline & CR-32 southeast -ward along the railroad tracks to CR 9 south of CR 30 will be recommended as well. This roadway is designed to meet up with future roadway segments proposed in the Loveland MSP and the Crossroads Subarea Transportation Plan. There are issues surrounding increasing the intensity of roadways in this area as there are numerous environmentally sensitive areas nearby. I have met with Natural Resources Staff and Management to discuss these issues and concerns. They feel that the roadways can be accommodated if proper mitigation efforts take place. There is also concern regarding the new diagonal arterial amongst some of the residents who live near the Timberline corridor. We will be doing a final round of public outreach this summer and I will keep you informed as to the status of these proposed MSP amendments. Water Wastewater 3 Issue Contact: Terry Ferril The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District will require easements along adjacent and parallel to the property lines for future water and sanitary sewer lines. 2 of 3 STAFF PROJECT REVIEW Citv of Fort Collins Citv of Fort Collins Date: 06/29/2001 Staff has reviewed your submittal for FOSSIL CREEK WETLANDS 2ND ANNEXATION & ZONING, #13-99A, and we offer the following comments: ISSUES: Advance Planning 9 No comments Engineering 4 No Comments Issue Contact: Pete Wray Issue Contact: Dave Stringer 5 Issue Contact: Dave Stringer Technical Services says it's OK, and that the boundary and legal closes. Excel Energy 6 no comments Light & Power Issue Contact., Len Hilderbrand 11 Issue Contact: Monica Moore Nearest Available power is approximately 1/2 mile west of proposed annexation. 12 Issue Contact. Monica Moore Applicant may be requred to provide off -site easements and any permits necessary to bring power to the site. . 13 Issue Contact. Monica Moore Applicant needs to coordinate power requirements, availability and costs with Light and Power Engineering. 1 of 3