Memorandum
Site Plan / Project Name: Qwest Wireless CDMA Facility — FTC-233
Site Address: Poudre Valley Hospital -Harmony Campus WTE-#16-99A, 2121 E. Harmony
Road, Ft. Collins, CO 80528
Date: July 17, 2001
RE: PROJECT POWER REQUIREMENTS
To Whom It May Concern:
The proposed Qwest Wireless CMRS facility will not require an additional (or new) power source
or meter. All existing meters and power feeds will be utilized. As a result of pulling power from
in-house feeds, a check meter will be required.
Please contact our office if you have any questions.
Randall Steinke
Registered Architect
Qwest Wireless LLC
Qwest Wireless LLC.
4301 E. Colfax Ave
Denver, CO 80220
July 17, 2001
Troy Jones
City of Fort Collins
Current Planning
281 N. College
Fort Collins, CO 80521
Mr. Jones:
Ifs now
Qwes�
Thank you for the review comments pertaining to our proposed rooftop CMRS facility located at Poudre
Valley Hospital. Our engineers were able to accommodate the concern expressed by Current Planning
regarding the skid location and setback. The increase in setback from 10 feet to 20 feet from all roof line
edges posed no degradation in signal propagation and this change has been noted on the revised plan
sets.
Light and Power also expressed some concerns relating to power requirements. The proposed CMRS
facility will not require an additional power source or new meter. All existing meters and power feeds will
be utilized. As a result of pulling power from in-house feeds, a check meter will be required. This should
address Light and Power's concerns. I have attached a letter from our engineer addressing this issue.
Please let me know if you have any questions or concerns. Thanks for all of your assistance on this
project. I look forward to hearing from you soon and scheduling the public hearing.
Sincerely,
Brad Johnson
Zoning Manager,
Qwest Wireless, LLC
Enclosures: Two sets of revised plan sets
Letter from engineer