HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS WTE (QWEST) - PDP - 16-99A - CORRESPONDENCE -Light & Power
3 Issue Contact: Alan Rutz
If new facility is being fed from an existing electric meter, then no comment.
4 Issue Contact: Alan Rutz
If new meter is required contact Light & Power as soon as possible.
5 Issue Contact. Alan Rutz
If main electric panel size is changing contact Light & Power.
PFA
2
No Comment
Zoning
1
No Comment
Issue Contact. Michael Chavez
Issue Contact. Gary Lopez
Be sure and return all of your redlined plans when you re -submit.
If you have questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yoh rs Truly, ;?
T QY�JONES'
Ci y lanner �'
2 of 2
STAFF PROJECT REVIEW
POUDRE VALLEY HOSPITAL Date: 06/27/2001
QWEST WIRELESS
4301 E. COLFAX AVE. ROOM 314
DENVER, CO 80220
Staff has reviewed your submittal for POUDRE VALLEY HOSPITAL -HARMONY CAMPUS
WTE #16-99A, and we offer the following comments:
ISSUES:
Advance Planning
9
No Comment
Building Inspection
10
Issue Contact. Pete Wray
Issue Contact. Rick Lee
Please find attached the various codes that the Fort Collins Building
Department will enforce. Typically antenna's are mounted to existing structure,
elements and require only new electrical installation information.
Current Planning
6 Issue Contact., Troy Jones
New Skid Location: The item on the plan labeled "proposed Quest antannas
behind screenwall attached to non -penetrating skid painted to match existing
penthouse screen wall" is too close to the edge of the roof. It is the intent of the
City to reduce the visual impact the skid will have to the view of the building.
The existing penthouse walls are set back 20 feet from the edge of the roof.
The new proposed skid location must be moved to also be setback at least 20
feet from the edge of the roof. Section 3.8.13(C)(3) of the Land Use Code
states, "all wireless telecommunication equipment shall be located as far from
the edge of the roof as possible."
7 Issue Contact. Troy Jones
Hearing: The only issue that needs to be resolved is the relocation of the skid.
Please submit two sets of the plan set (pages Z1, Z2, & Z3) reflecting this
change. As soon as I see the revised drawings reflecting the said change, I will
be happy to schedule the project for hearing. The hearing will be a type 1
hearing, which means that a hearing officer will be the decision making
Engineering
0
No Comment
1 of 2
Issue Contact. Dave Stringer