Loading...
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS WTE (QWEST) - PDP - 16-99A - CORRESPONDENCE -Light & Power 3 Issue Contact: Alan Rutz If new facility is being fed from an existing electric meter, then no comment. 4 Issue Contact: Alan Rutz If new meter is required contact Light & Power as soon as possible. 5 Issue Contact. Alan Rutz If main electric panel size is changing contact Light & Power. PFA 2 No Comment Zoning 1 No Comment Issue Contact. Michael Chavez Issue Contact. Gary Lopez Be sure and return all of your redlined plans when you re -submit. If you have questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yoh rs Truly, ;? T QY�JONES' Ci y lanner �' 2 of 2 STAFF PROJECT REVIEW POUDRE VALLEY HOSPITAL Date: 06/27/2001 QWEST WIRELESS 4301 E. COLFAX AVE. ROOM 314 DENVER, CO 80220 Staff has reviewed your submittal for POUDRE VALLEY HOSPITAL -HARMONY CAMPUS WTE #16-99A, and we offer the following comments: ISSUES: Advance Planning 9 No Comment Building Inspection 10 Issue Contact. Pete Wray Issue Contact. Rick Lee Please find attached the various codes that the Fort Collins Building Department will enforce. Typically antenna's are mounted to existing structure, elements and require only new electrical installation information. Current Planning 6 Issue Contact., Troy Jones New Skid Location: The item on the plan labeled "proposed Quest antannas behind screenwall attached to non -penetrating skid painted to match existing penthouse screen wall" is too close to the edge of the roof. It is the intent of the City to reduce the visual impact the skid will have to the view of the building. The existing penthouse walls are set back 20 feet from the edge of the roof. The new proposed skid location must be moved to also be setback at least 20 feet from the edge of the roof. Section 3.8.13(C)(3) of the Land Use Code states, "all wireless telecommunication equipment shall be located as far from the edge of the roof as possible." 7 Issue Contact. Troy Jones Hearing: The only issue that needs to be resolved is the relocation of the skid. Please submit two sets of the plan set (pages Z1, Z2, & Z3) reflecting this change. As soon as I see the revised drawings reflecting the said change, I will be happy to schedule the project for hearing. The hearing will be a type 1 hearing, which means that a hearing officer will be the decision making Engineering 0 No Comment 1 of 2 Issue Contact. Dave Stringer