HomeMy WebLinkAboutMARCH, OLIVE & PHARRIS, LLC LAW OFFICES - PDP - PDP140008 - CORRESPONDENCE - REVISIONS (5)Comment Number: 5 Comment Originated: 03/17/2015
03/17/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
[Response:] Text has been masked.
Comment Number: 6 Comment Originated: 03/17/2015
03/17/2015: Please remove the "+/-" from the dimension for the additional
College Avenue right of way dedicated, or dimension the new right of way being
dedicated. This must be clearly defined.
[Response:] Right -of -Way dedication Exhibit and Legal Description has been prepared for you
review and will be recorded by separate document.
Department: Traffic Operation
Contact: Martina Wilkinson, 970.221-6887, mwilkinson(a�fcgov.com
Topic: Site Plan
Comment Number: 2
Comment Originated: 07/16/2014
03/17/2015: The response letter indicates that the application for the change in
use permit from CDOT is attached. I didn't see it in the packet. This permit will
be needed to be completed before the applicant can use the driveway in the
manner shown.
[Response]
09/02/2014: Since the shared drive concept is abandoned, the existing drive
will be used. CDOT appears to be supportive of this. The drive needs to be
one way (inbound only), and a change in use permit will be needed from CDOT.
07/16/2014: The shared driveway off College Avenue needs to function as an
appropriate high volume drive that accesses a state highway. If it's being used
for 2-way traffic, it would need to accommodate 2-way traffic for at least some
distance from street.
Department: Water Conservation
Contact: Eric Olson, 970-221.6704, eolson(a),fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 07/02/2014
07/02/2014: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson(a fcgov.com
[Response:] Acknowledged.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(a.fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 07/18/2014
03/17/2015: This needs to be done for the pavers.
[Response:] Grass Pavers have been proposed. Two ditierent sections are shown on the detail
sheet
09/04/2014. Reminder comment.
07/18/2014. Please provide a design for the water quality mitigation and LID
treatment required for the new impervious area.
Department: Technical Services
Contact: Jeff County, 970.221.6588, jcountyanfcgov.com
Topic: General
Comment Number: 11 Comment Originated:
03/17/2015
03/17/2015: We don't like the reference to the Site Plan in the right of way
dedication. Please confirm that this is allowed.
[Response:] Right -of -Way dedication Exhibit and Legal Description has been
prepared for you
review and will be recorded by separate document.
Topic: Landscape Plans
Comment Number: 7 Comment Originated:
03/17/2015
03/17/2015: We will require a 24"06" sheet when filed.
[Response:] The plans have been printed on the appropriate size.
Comment Number: 8 Comment Originated:
03/17/2015
03/17/2015: There are line over text issues. See redlines.
[Response:] Line over text issues have been revised.
Comment Number: 9 Comment Originated:
03/17/2015
03/17/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
[Response:] Text has been masked
Comment Number: 10 Comment Originated:
03/17/2015
03/17/2015: Please remove the "+/2 from the dimension for the additional
College Avenue right of way dedicated, or dimension the new right of way being
dedicated. This must be clearly defined.
[Response:] Right -of -Way dedication Exhibit and Legal Description has been prepared for you
review and will be recorded by separate document.
Topic: Site Plan
Comment Number: 2 Comment Originated:
07/14/2014
03/17/2015: There are still line over text issues. See redlines.
[Response:] Line over text issues have been revised
09/02/2014: There are still line over text issues. See redlines.
07/14/2014: There are line over text issues. See redlines.
Comment Number: 4 Comment Originated: 09/02/2014
03/17/2015: This has not been corrected.
09/02/2014: We will require a 24"06" sheet when filed.
[Response:] The plans have been printed on the appropriate size.
fire sprinkler system as a means for offsetting the lack of access condition. Fire
lane standards require 20' width but the fire marshal will allow a four foot width
reduction (to 16'). Plan revisions will need to be reviewed prior to approval.
09/03/2014: FIRE LANES
The issue of fire access to this property needs to be revisited. It's now my
understanding the proposal to share a drive aisle with the commercial property
to the south has been rescinded and fire access will need to be achieved
on -site as we cannot take access off of College Ave. Please contact me to
discuss this further. Code reference provided below.
Code language and Fire lane specifications are provided below.
IFC 503.1.1: Fire Lanes shall be provided to within 150' of all portions of the
building, as measured by an approved route around the exterior of the building.
When fire lanes cannot be provided, the fire code official is authorized to
increase the dimension of 150 feet if the building is equipped throughout with an
approved, automatic fire -sprinkler system.
FIRE LANE SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to
the design criteria already contained in relevant standards and policies, any
new fire lane must meet the following general requirements:
> Shall be designated on the plat as an Emergency Access Easement.
> Maintain the required 20 foot minimum unobstructed width & 14 foot minimum
overhead clearance.
> Be designed as a flat, hard, all-weather driving surface capable of supporting
40 tons.
> Dead-end fire access roads in excess of 150 feet in length shall be provided
with an approved area for turning around fire apparatus.
> The required turning radii of a fire apparatus access road shall be a minimum
of 25 feet inside and 50 feet outside. Turning radii shall be detailed on
submitted plans.
> Be visible by painting and/or signage, and maintained unobstructed at all
times.
> Additional access requirements exist for buildings greater than 30' in height.
Refer to Appendix D of the 2012 IFC or contact PFA for details.
International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix
D; FCLUC 3.6.2(B)2006 and Local Amendments.
[Response:] Per the meetings and emails dated April 24, the currently layout and emergency
access has been agreed upon.
Department: Historical Preservation
Contact: Karen McWilliams, 970-224-6078,
Topic: General
Comment Number: 1
kmcwilliams(@fcgov.com
Comment Originated: 07/07/2014
07/07/2014: This property currently is under consideration by the Landmark
Preservation Commission and Council for Fort Collins Landmark designation.
The property has previously been found to be eligible for local designation for
both its architecture and historical associations. The property is also likely to be
eligible for listing on both the State and National Registers.
[Response:] Acknowledgec
Comment Number: 2 Comment Originated: 07/07/2014
07/07/2014: The plans have been reviewed for compliance with Section 3.4.7
of the Land Use Code, and for compliance with the criteria in Section 14-48 of
the City Code, which includes the Secretary of the Interior's Standards. The
plans comply with all applicable standards.
[Response:] Acknowledged.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland(o)fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 07/17/2014
07/17/2014:
A house changing occupancy to commercial must apply for a building permit
and the building code requires the building meet current code in some aspects.
For details contact Russ at 416-2341.
[Response:] Acknowledged.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartinet7a,fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 06/30/2014
06/30/2014: The existing electric service provides for up to 150 amps. If
additional electric service capacity is needed, please coordinate with Light &
Power Engineering at (970)221-6700.
[Response:] Acknowledged
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilynxwileranpoudre fire.org
Topic: General
Comment Number: 2 Comment Originated: 03/18/2015
FIRE ACCESS
03/18/2015, Contrary to the applicant's comment in the most recent response
letter, fire access requirements for this site have NOT been met. Prior fire
department comment from 09/03/2014 (below), remains active. An Emergency
Access Easement on the property will be needed or the building will require a
Comment Number: 13 Comment Originated: 03/18/2015
03/18/2015: If you are dedicating 9 feet of right-of-way then the distance on the
plans should not be labeled as +- 9 feet but as a definitive 9.0 feet.
[Response:] Right -of -Way dedication Exhibit and Legal Description has been prepared for you
review and will be recorded by separate document.
Comment Number: 14
Comment Originated: 03/18/2015
The ROW dedication document. We will not accept this with a reference to a
site plan within the legal description. 03/18/2015:
[Response:] Right -of -Way dedication Exhibit and Legal Description has been prepared for you
review and will be recorded by separate document.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224.6143, lex(cDfcgov.com
Topic: General
Comment Number: 1
07/11/2014: No comments.
Department: Forestry
Contact: Tim Buchanan, 970.221.6361,
Topic: Landscape Plans
Comment Number: 8
tbuchanan(a)fcgov.com
Comment Originated: 07/11/2014
Comment Originated: 09/03/2014
03/17/2015:
Further discussion of this item appears needed in reference to location of the
trash facility if required and the alternatives under discussion related to placing
parking near the tree.
[Response:]
09/03/2014:
The current plan shows the alternate trash enclosure location at the large
cottonwood at the SE corner of the site. The parking stall just to the west
appears to be less than 3 feet from the tree. The extent of the pavers near this
tree is not very not clear.
Please review these conflicts and consider if the parking stall can be shifted to
the west or possibly not included to provide better protection to the tree. The
City Forester is available to meet on site if needed to help evaluate.
Comment Number: 9
Comment Originated: 03/17/2015
03/17/2015:
Thank you for adding the proposed Yellowood tree NW of the building.
Mitigation trees need to be upsized, and in the case of Yellowwood which is an
ornamental tree the mitigation size is 2.5 inch caliper. Please record the size of
the Yellowwood in the Tree/Planting Legend as 2.5 inch caliper.
[Response:] The caliper has been upsized.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger(Mcgov.com
Topic: General
Comment Number: 2 Comment Originated: 07/15/2014
09/01/14: This is labeled on the plans. Additional information on the dedication
process and cost can be found at: http://www.fcgov.com/engineering/devrev.php
The deed will need to be finalized and accepted prior to final approval of this
project. 07/15/2014: Additional right-of-way needs to be dedicated along the
frontage of the property. I donut know exactly how much is to be dedicated, but
want right-of-way so that there is 17 feet from the existing flowline of the street.
The distance allows for the future parkway and detached sidewalk that is a part
of the college avenue cross section.
[Response:] Right -of -Way dedication Exhibit and Legal Description has been prepared for you
review and will be recorded by separate document
Comment Number: 6
Comment Originated: 07/15/2014
03/18/15: The applicant will need to get an access permit from CDOT for the
existing driveway prior to starting the driveway work. 09/01/14: Since the
driveway will not be closing the applicant will need to work with CDOT regarding
a new/updated access permit for this driveway. The driveway shall be a one
way driveway and that needs to be noted on the site plan and appropriate
signage shown to be installed on the plans, so it is clear that cars are not to
enter from the wrong way. 07/15/2014: For the driveway closure:
The applicant will need to get an access permit from CDOT for the closure (no
cost).
The driveway cut would need to be replaced along College Ave with vertical
curb and gutter.
[Response:] We are working directly with CDOT.
Comment Number: 9
Comment Originated: 09/03/2014
03/18/15: 1 will provide a copy of this document at our Wednesday morning
meeting. 09/03/2014: A development agreement will need to be entered into
for the site. I will send out the information for development agreement sheet and
that will need to be returned.
[Response:]
Comment Number: 11 Comment Originated: 03/18/2015
03/18/2015: Showing a trash enclosure adjacent to the alley. Where are the
doors? They can't swing into the alley. Need to provide a design for this or
notes that identify where the door locations will be and that they are not to swing
into the alley.
[Response:] The trash enclosure shall be internal to the building.
Comment Number: 12 Comment Originated: 03/18/2015
In reading the comment responses it states that there will be pervious pavers
installed for the parking area along the north side of the lot. There is no way in
looking at the plan that that could be known that that is the intent.03/18/2015:
[Response:] The plans have been revised to clarify material.
V
existing use and the new proposed use and a parking table (both vehicle and
bicycle spaces).
Comment Number: 4
Comment Originated: 07/16/2014
03/17/2015: The planting legend on the landscape plan should include
quantities.
[Response:] Quantities have been included
09/02/2014: This site/landscape plan will need to show the righ-of-way
improvements such as sidewalk location and street trees.
The juniper bed dimensions should be labeled and the number of plants to be
planted in a planting table.
07/16/2014: Is this a combined site and landscape plan? If so the landscaping
should be included. Please outline the juniper planting bed and number of
plants in each.
Comment Number: 6
Comment Originated: 09/02/2014
03/17/2015: What is the drive aisle width of the compact spaces?
[Responses Dimensions have been included in the site plan
09/02/2014: The stall dimensions will need to be labeled. It seems that there is
not enough aisle room for stall labeled 11 and 10 possibly more depending on
the stall dimensions.
Comment Number: 7 Comment Originated: 09/02/2014
03/17/2015: Stalls along the north property line will need to be surfaced with
asphalt or concrete.
[Response:] Parking Stalls along the northern property line are proposed as grass pavers.
The new parking areas are required a 5ft landscape setback. This can be
reduced through additional screening. It is suggest a aft wrought -iron fence with
vegetation could provide adequate screening. This would be both the north and
south parking areas.
[Response:] A metal fence has been proposed on both the north and south parking areas.
09/02/2014: Stalls along north property line will need to be surfaced with asphalt
or concrete.
What screening of the vehicle use area along the north property line is included?
Comment Number: 8 Comment Originated: 09/03/2014
03/17/2015: The dissolving of the agreement can be as a condition of approval
of PDP, but must be complete for Final Plan approval.
[Response:]
09/03/2014: The agreement to dissolve the old agreement will need to be
completed before going to public hearing.
Comment Number: 9 Comment Originated: 03/17/2015
03/17/2015: The sheet numbering will need to be revised to the correct number
of sheets this can also be done through a sheet index.
[Response:] The sheet numbers have been revised
Comment Number: 10 Comment Originated: 03/17/2015
03/17/2015: Plans will need to be on 24"36" sheets.
[Response:] The plans have been printed on the appropriate size
F6rt
City of
Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/d`eve/opmentreview
April 17, 2015
Brad March
March, Olive & Pharris, LLC
110 East Oak Street, Suite 200
Fort Collins. CO 80524
RE: March, Olive, & Pharris, LLC Law Offices, PDP140008, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Noah Beals, at 970-416-2313 or nbeals@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Noah Beals, 970-416-2313, nbeals(a-)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 07/16/2014
03/17/2015: The trash enclosure location needs to be selected. Please
choose one and eliminate the other.
[Response:] The interior trash enclosure has been selected.
09/02/2014: The trash enclosure needs to be resolved if showing new
enclosure on site then it will need to be on a concrete pad with a walk-in access.
07/14/2014: The trash enclosure needs to be designed with walk-in access
without having to open the main service gate and located on a concrete pad at
least 20ft from a public sidewalk.
Comment Number: 3 Comment Originated: 07/16/2014
03/17/2015: A land use table is has still not been added. This needs to be in
clude on the site plan. The use you are requesting is Offfices, financial services
and clinics in the list ollpermitted uses.
[Response I A land use table has been included within the ola
09/02/2014: Where is the existing use and the proposed use table?