COMMENT SHEET
DATE: December 27, 1999 DEPT: Stormwater
PROJECT: A TO Z PARTY RENTAL (TYPE I, LUC)
All comments must be received by Troy Jones no later than the staff]
review meeting:
Wednesday, December 29, 1999 UL6 2 8 1999
• Prior to this item going onto a public hearing Stormwater has one remaining issue to resolve:
The engineer needs to provide documentation that the addition of fill and the building on the
proposed A-Z Party Rental lots will not adversely impact the neighboring properties.
Calculations should show that the depth of overtopping of the flows coming off of Riverside
Ave. into the Pitkin Outfall Channel is not increased due to the proposed grading on the site.
Particular attention should be given to the building immediately to the north of the proposed
site that looks like it is currently flooded. No adverse impacts will be allowed to occur on
any of the neighboring properties.
Calculations should also be provided to show how the 541 cfs coming into the Pitkin Outfall
Channel will be handled through the upper part of the channel where there is currently no
capacity to handle such flows. Will these flows affect the proposed building if no
improvements are done to the current channel? If these flows do affect the proposed building
then will there be any improvements proposed ??
Date: Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat _ Site _ Drainage Report _Other
_ Utility _ Redline Utility _ Landscape
Sb AC5$oC
City of Fort Collins
Comm, ty Planning and Environmental :rvices
Current Planning
City of Fort Collins
December 27, 1999
Richard Rutherford
Stewart & Associates
103 South Meldrum Street
Fort Collins, CO 80521
Re: A to Z Party Rental
Dear Mr. Rutherford,
I received a bundle of revised plans from you dated December 16, 1999. 1 had indicated
in my comment letter to you on November 17, 1999 that although there are many issues
that still need to be resolved, there are only a few issues that must be resolved before the
project is ready enough to go to hearing.
I went ahead and routed the items that you submitted, and will have formal comments
back to you by January 19, 2000. Most of the outstanding issues are minor enough not to
hold the project back from hearing, but you need to understand that all the issues must be
fully resolved as part of final compliance review.
Even though the project is being formally reviewed for the 3`d round of comments, there
are only a few items that must be resolved before the project can go to hearing. As soon
as you satisfy the following outstanding issues, we can schedule the project for a hearing:
1) A written alternative compliance request for section 3.2.1(D)(2)(b) of the
Land Use Code for the location of the street trees, and
2) The attached comment sheet from the Stormwater Department must be
satisfied to the satisfaction of Basil Hamdan.
Feel free to give me a call if you have any questions about anything on this letter, or give
Basil Hamdan a call at 224-6035.
Sii(cerely,
Tro W.
City PI