HomeMy WebLinkAboutA - Z PARTY RENTAL - PDP - 11-99 - CORRESPONDENCE - REVISIONS3. The swale with the trickle pan that runs on the north side of the side is a concern.
Please smooth out the +90 degree turn in the northwest corner to direct the flow. The
grading around the east end of the pan does not make sense and appears to encroach
into the 40' drainage easement. Please revise the grading and provide cross -sections
that indicate the flows can be handled, including the freeboard.
Two ¢S° r36vb5 wee
6 ALAD6 .jAlTHEPAu- 7146/AN4 ,M1sA6VED
RESPONSE: AWAY FROM T H6 Peopt,ery 6t&6, Foor, Cealrl6cr1ovr Azre
/IVc.C.V ceD.
4. Please show the proposed grading on the drainage plan.
LV6 sef 4G4rEa ?t/E- 6.eApl-vc FRoq THE DP_A,-V4,6£ /04AV So ry6
RESPONSE: (,P.AD1,v6 PLAN LA,;Ar.veT G4urre2BD WrrM Fv1,v1_1,ves e_{-e. we
ol; d, pw+ co,.fo,.., 6»4 tioF a// friar/of e%v.�,O.:.
5. Please provide profile views for each of the detention pond outlets, including their
size, type, slope, length, cover, and HGL. Will the outlets require riprap? Currently,
riprap is shown on the pond side of the outlet. Why? If needed, please provide
riprap, call out all dimensions and provide riprap details.
tO6 E4-JA%1WArSD THE DarEAlnpv Po.uns iA;P HA✓6 SA'Dww
RESPONSE: Ex-reuvEc !7E?Evr000 Foj2 w4*rEte QJALiTY!
6. Please add concentration points to the drainage plans.
RESPONSE: We ad.l" t" 4e» e°,cr,f•.f;°tiPo��f� e. .��.;.,Q�e /o,.
Erosion/Sediment Control Comments
1. The plan is OK as submitted. Thank you.
Please refer to redlined plans and report for additional review comments.
AZparty l .doc
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: June 14, 1999 TO: Stormwater Utility
PROJECT: # 11-99 A-Z Party Rental, Type I - LUC
All comments must be received by Troy Jones no later than the staff
review meeting:
Wednesday, July 14,1999
1. The outfall that exists directly north of the site is known to carry a large amount of
flow. According to a hydrology update that is currently being worked on (but not
completed) by the Master Planning Department, the flows from this outfall are in
excess of 550 cfs. It is anticipated that these large flows will cause localized
flooding. Therefore, a floodplain analysis of these flows will be needed. A copy of
the Guidelines for Submitting Floodplain Modeling Reports to the City of Fort
Collins is attached for guidance. There are a few options that could be taken to
mitigate the flooding potential for this site. Please contact Donnie Dustin (416-7521)
to schedule a meeting to discuss these issues.
AT .4 .4teeT1,p6 WIrH, roLgA)fe yLueMP-, 8A1/c- #A/IDAv AdD S✓a4k� 4o4e,,
THEy 4CC66P THAT iF 901� DlrH(o tVAf R-AISEP Tv. 6/ay. 38.00, wH/6'v
RESPONSE: XS A FOnT H/660B,G TFIAV SPA-4.uv4�Ove-IC EA/LZ0,'Cb WouC4> AM6,47E
FLOODIAJ& PATEUTIAL. TF/E P/PE UNDe=,- TyE R,4/1.064D is
2. Due to the proximity of this site to the total outfall for the regional drainage basin, the
two detention ponds will not be necessary. However, water quality will still need to
be addressed at the site. Therefore, please provide water quality measures at the site,
including the calculations for the water quality capture volume, outlet structure, etc.
Also, please provide details of the outlet structures in the plans and include a section
on water quality in the text of the report.
RESPONSE: wE ffAve- DONE THE 45"6,
(o er)
Date: "l l ` Signature: _
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
tr
_iPlat -site �rainage Report `]`Other n5POf6Es
Utility 1Q2edline Utility Landscape City of of F
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: June 14, 1999 DEPT: ENGINEERING
PROJECT: 911-99 A-Z Party Rental, Type I - LUC
PLANNER: Gen. Troy Jones
ENGINEER: Marc Virata
All comments must be received by: <Date> (71l -1/Y"Y)
❑ No Problems
❑ Problems or Concerns (see below or attached)
General Comments:
• A soils report was not received for this development.
• A traffic impact analysis was not received for this development. The traffic impact analysis
should address the frequency of truck traffic to and from this site. to c a ae d . /6ilir. for A, C,
• This development is required to dedicate an additional 7.5' of right-of-way (for a total half
street width of 57.5') and provide for a 15' utility easement along Riverside Avenue per our
arterial street standard. Tbsra i1 J•/gtb*4f 1"r+.rae..f del#1*41-7 2sieow i 15' c*.eSA't.
Site Plan' a -el a 5g4,a e_ iiemo-%f 4- w.fe.. A-& s/e,q lfl*e kh."
• Please indicate on the plan how an SU-30 vehicle can maneuver on -site to back into the truck
dock (this should not show SU-30 vehicles backing into the driveway �fr"om Riverside
Avenue.) 0Nlq ZIL f'e.,+ -k •--k, •I e6 uT
Jel. quo ., pip,-T/.1/r. un;4, a.e k../,
• What is the function of the (assumed) three parking spaces on the northwest corner of the
site? The stall depth appears to be insufficient. A joint access easement appears to be
needed, provided by the propeq to the no�t}+•. T4c b u;/d,. y I�te //... [ue,e c[,t•�y
Utility Plans Sn010+i— VjO.rg I i SI/r� as JePA" fe We, Aor rJow, en tA„ffJo � lit�s •
• Replace all occurrences of "Director of Engineering" with "City Engineer". w` dr./ fbu .
• Add "Traffic Engineer" to the signature block approval. wz ,l, ,! t4
• The patterned colored concrete across the driveway is not allowed. If this affect is desired it
should be relocated outside of public right-of-way. Provide a detail on how the ramps shown
will be incorporated into the new driveway approach detail. GJG e/1^ 1'
4�ioJ 140 P"���"��
r/ (see plans for any additional comments) GwcFs/s. D-/S k)•J�/.��/{e-J
Date: / /� /�� Signature:��/���
PLEASE SEND COPIES b�'PLAT
OF MARKED REVISIONS: $1 SITE ❑ � UTILITY NO COMMENTS — SUBMIT MYLARS
17 LANDSCAPE
W
�J
r- PROJECT
City of Fort Collins COMMENT SHEET
Current Planning
DATE: June 14, 1999 DEPT: Water & Wastewater
PROJECT: #11-99 A-Z Party Rental, Type I - LUC
All comments must be received by Troy Jones no later than the staff
review meeting:
Wednesday, July 14, 1999
➢ Has the existing water main on north side of this project been field located?
Original plans for this main show it on the north side of the easement. Field
verify its location and provide for a 10 foot wide utility easement on either side
of main. Show, label and provide vG � documentatio�n�for any extra easemenJt
T A r a/rt+i-Ae kc to .�tWam/0e4'k .
necessary for water main. Wt q,ew.Jt.%„�f •/a. q ;Le V0.4A Iw^4 6 1ep.�.Ar Inrf,,,.,
➢ Provide 10 feet of separation between thrust block on fire line and water service. wea/,d
Our records indicate that a sanitary sewer service may exist in the existing
manhole located in the proposed drive. Field verify and use this service or
abandon at the main. we uje,l +41, fevvicc .
➢ See site, landscape and utility plans for other comments.
Date: ?I 1- % + f Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
X PLAT r SITE _DRAINAGE REPORT _OTHER
X UTILITY r REDLINE UTILITY X LANDSCAPE
Citv of Fort Collins
ex^mc ee
PROJECT
COMMENT SHEET
City of Fart Callins
Current Planning
DATE: June 14, 1999 TO: PFA
PROJECT: # 11-99 A-Z Party Rental, Type I - LUC
All comments must be received by Troy Jones no later than the staff
review meeting:
Wednesday, July 14, 1999
Bui ding is out of access and snail be tire sprinkiered. We A e v
ADDRESS A film ERALS
Address numerals shah be visible from file street fronting the property, and posted with a
minimum of o inch numerals on/ �a contrasting background. (Bronze numerals on brown
brick are not acceptabie). ITii F orwt4 #14- s v o�� J'fe ue f:'aisar a-. W '4-4-t.
DUILAPi X(a AK AA: v
The proposed building exceeds 5i5W square feet for type v construction and must be fire
contained or fire spriniciered. W e Aa. a P. 0 �*L'I e ( f-ke 6' F,;v Lim.
iVA ERSUFFLY
fire hydrants are required with a maximum spacing of 600 feet along an approved
roadway. Each hydrant must be capable of delivering i5uu gallons of water per minute
at a residual pressure of 20 psi.. Hydrants shah be of an approved type as defined by the
water department and the lire department. No commercial building can be greater
than jllU feet from a fire 'aydran t. Tk e �e t'j a F, H. c- 'kt ecrIe ly !,./e I Je/�erJl�/�
l qL' S .4+4 o f 1 6V. Pam•,oevl y Govn.f....
Knox BOX 1 011cy
rouare r are authority requires a `Knox box to be mounted on the front or every new
building equipped with a regtS}iFed fire sprinicier system or [ire alarm system -
Date: /�_�� .k� egnature. av�/',ie<� r 9•`�;*y
SiYiliiiiiKLi~Alt lilAl1i1IRL—'1VlL1V lJ:
This proposed buiiding shad be fire sprink[ered
CHECK HERE IFYOUWISH TO RECEIVE COPIES OF REVISIONS
Plat V�ite Drainage Report _Other I&
_Utility _Redline Utility _Landscape Citv of Fort Collins