Loading...
HomeMy WebLinkAboutA - Z PARTY RENTAL - PDP - 11-99 - CORRESPONDENCE - REVISIONS3. The swale with the trickle pan that runs on the north side of the side is a concern. Please smooth out the +90 degree turn in the northwest corner to direct the flow. The grading around the east end of the pan does not make sense and appears to encroach into the 40' drainage easement. Please revise the grading and provide cross -sections that indicate the flows can be handled, including the freeboard. Two ¢S° r36vb5 wee 6 ALAD6 .jAlTHEPAu- 7146/AN4 ,M1sA6VED RESPONSE: AWAY FROM T H6 Peopt,ery 6t&6, Foor, Cealrl6cr1ovr Azre /IVc.C.V ceD. 4. Please show the proposed grading on the drainage plan. LV6 sef 4G4rEa ?t/E- 6.eApl-vc FRoq THE DP_A,-V4,6£ /04AV So ry6 RESPONSE: (,P.AD1,v6 PLAN LA,;Ar.veT G4urre2BD WrrM Fv1,v1_1,ves e_{-e. we ol; d, pw+ co,.fo,.., 6»4 tioF a// friar/of e%v.�,O.:. 5. Please provide profile views for each of the detention pond outlets, including their size, type, slope, length, cover, and HGL. Will the outlets require riprap? Currently, riprap is shown on the pond side of the outlet. Why? If needed, please provide riprap, call out all dimensions and provide riprap details. tO6 E4-JA%1WArSD THE DarEAlnpv Po.uns iA;P HA✓6 SA'Dww RESPONSE: Ex-reuvEc !7E?Evr000 Foj2 w4*rEte QJALiTY! 6. Please add concentration points to the drainage plans. RESPONSE: We ad.l" t" 4e» e°,cr,f•.f;°tiPo��f� e. .��.;.,Q�e /o,. Erosion/Sediment Control Comments 1. The plan is OK as submitted. Thank you. Please refer to redlined plans and report for additional review comments. AZparty l .doc PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: June 14, 1999 TO: Stormwater Utility PROJECT: # 11-99 A-Z Party Rental, Type I - LUC All comments must be received by Troy Jones no later than the staff review meeting: Wednesday, July 14,1999 1. The outfall that exists directly north of the site is known to carry a large amount of flow. According to a hydrology update that is currently being worked on (but not completed) by the Master Planning Department, the flows from this outfall are in excess of 550 cfs. It is anticipated that these large flows will cause localized flooding. Therefore, a floodplain analysis of these flows will be needed. A copy of the Guidelines for Submitting Floodplain Modeling Reports to the City of Fort Collins is attached for guidance. There are a few options that could be taken to mitigate the flooding potential for this site. Please contact Donnie Dustin (416-7521) to schedule a meeting to discuss these issues. AT .4 .4teeT1,p6 WIrH, roLgA)fe yLueMP-, 8A1/c- #A/IDAv AdD S✓a4k� 4o4e,, THEy 4CC66P THAT iF 901� DlrH(o tVAf R-AISEP Tv. 6/ay. 38.00, wH/6'v RESPONSE: XS A FOnT H/660B,G TFIAV SPA-4.uv4�Ove-IC EA/LZ0,'Cb WouC4> AM6,47E FLOODIAJ& PATEUTIAL. TF/E P/PE UNDe=,- TyE R,4/1.064D is 2. Due to the proximity of this site to the total outfall for the regional drainage basin, the two detention ponds will not be necessary. However, water quality will still need to be addressed at the site. Therefore, please provide water quality measures at the site, including the calculations for the water quality capture volume, outlet structure, etc. Also, please provide details of the outlet structures in the plans and include a section on water quality in the text of the report. RESPONSE: wE ffAve- DONE THE 45"6, (o er) Date: "l l ` Signature: _ CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS tr _iPlat -site �rainage Report `]`Other n5POf6Es Utility 1Q2edline Utility Landscape City of of F PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: June 14, 1999 DEPT: ENGINEERING PROJECT: 911-99 A-Z Party Rental, Type I - LUC PLANNER: Gen. Troy Jones ENGINEER: Marc Virata All comments must be received by: <Date> (71l -1/Y"Y) ❑ No Problems ❑ Problems or Concerns (see below or attached) General Comments: • A soils report was not received for this development. • A traffic impact analysis was not received for this development. The traffic impact analysis should address the frequency of truck traffic to and from this site. to c a ae d . /6ilir. for A, C, • This development is required to dedicate an additional 7.5' of right-of-way (for a total half street width of 57.5') and provide for a 15' utility easement along Riverside Avenue per our arterial street standard. Tbsra i1 J•/gtb*4f 1"r+.rae..f del#1*41-7 2sieow i 15' c*.eSA't. Site Plan' a -el a 5g4,a e_ iiemo-%f 4- w.fe.. A-& s/e,q lfl*e kh." • Please indicate on the plan how an SU-30 vehicle can maneuver on -site to back into the truck dock (this should not show SU-30 vehicles backing into the driveway �fr"om Riverside Avenue.) 0Nlq ZIL f'e.,+ -k •--k, •I e6 uT Jel. quo ., pip,-T/.1/r. un;4, a.e k../, • What is the function of the (assumed) three parking spaces on the northwest corner of the site? The stall depth appears to be insufficient. A joint access easement appears to be needed, provided by the propeq to the no�t}+•. T4c b u;/d,. y I�te //... [ue,e c[,t•�y Utility Plans Sn010+i— VjO.rg I i SI/r� as JePA" fe We, Aor rJow, en tA„ffJo � lit�s • • Replace all occurrences of "Director of Engineering" with "City Engineer". w` dr./ fbu . • Add "Traffic Engineer" to the signature block approval. wz ,l, ,! t4 • The patterned colored concrete across the driveway is not allowed. If this affect is desired it should be relocated outside of public right-of-way. Provide a detail on how the ramps shown will be incorporated into the new driveway approach detail. GJG e/1^ 1' 4�ioJ 140 P"���"�� r/ (see plans for any additional comments) GwcFs/s. D-/S k)•J�/.��/{e-J Date: / /� /�� Signature:��/��� PLEASE SEND COPIES b�'PLAT OF MARKED REVISIONS: $1 SITE ❑ � UTILITY NO COMMENTS — SUBMIT MYLARS 17 LANDSCAPE W �J r- PROJECT City of Fort Collins COMMENT SHEET Current Planning DATE: June 14, 1999 DEPT: Water & Wastewater PROJECT: #11-99 A-Z Party Rental, Type I - LUC All comments must be received by Troy Jones no later than the staff review meeting: Wednesday, July 14, 1999 ➢ Has the existing water main on north side of this project been field located? Original plans for this main show it on the north side of the easement. Field verify its location and provide for a 10 foot wide utility easement on either side of main. Show, label and provide vG � documentatio�n�for any extra easemenJt T A r a/rt+i-Ae kc to .�tWam/0e4'k . necessary for water main. Wt q,ew.Jt.%„�f •/a. q ;Le V0.4A Iw^4 6 1ep.�.Ar Inrf,,,., ➢ Provide 10 feet of separation between thrust block on fire line and water service. wea/,d Our records indicate that a sanitary sewer service may exist in the existing manhole located in the proposed drive. Field verify and use this service or abandon at the main. we uje,l +41, fevvicc . ➢ See site, landscape and utility plans for other comments. Date: ?I 1- % + f Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS X PLAT r SITE _DRAINAGE REPORT _OTHER X UTILITY r REDLINE UTILITY X LANDSCAPE Citv of Fort Collins ex^mc ee PROJECT COMMENT SHEET City of Fart Callins Current Planning DATE: June 14, 1999 TO: PFA PROJECT: # 11-99 A-Z Party Rental, Type I - LUC All comments must be received by Troy Jones no later than the staff review meeting: Wednesday, July 14, 1999 Bui ding is out of access and snail be tire sprinkiered. We A e v ADDRESS A film ERALS Address numerals shah be visible from file street fronting the property, and posted with a minimum of o inch numerals on/ �a contrasting background. (Bronze numerals on brown brick are not acceptabie). ITii F orwt4 #14- s v o�� J'fe ue f:'aisar a-. W '4-4-t. DUILAPi X(a AK AA: v The proposed building exceeds 5i5W square feet for type v construction and must be fire contained or fire spriniciered. W e Aa. a P. 0 �*L'I e ( f-ke 6' F,;v Lim. iVA ERSUFFLY fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering i5uu gallons of water per minute at a residual pressure of 20 psi.. Hydrants shah be of an approved type as defined by the water department and the lire department. No commercial building can be greater than jllU feet from a fire 'aydran t. Tk e �e t'j a F, H. c- 'kt ecrIe ly !,./e I Je/�erJl�/� l qL' S .4+4 o f 1 6V. Pam•,oevl y Govn.f.... Knox BOX 1 011cy rouare r are authority requires a `Knox box to be mounted on the front or every new building equipped with a regtS}iFed fire sprinicier system or [ire alarm system - Date: /�_�� .k� egnature. av�/',ie<� r 9•`�;*y SiYiliiiiiKLi~Alt lilAl1i1IRL—'1VlL1V lJ: This proposed buiiding shad be fire sprink[ered CHECK HERE IFYOUWISH TO RECEIVE COPIES OF REVISIONS Plat V�ite Drainage Report _Other I& _Utility _Redline Utility _Landscape Citv of Fort Collins