HomeMy WebLinkAboutSCOTCH PINES WTE, VOICESTREAM - PDP/FDP - 34-99B - CORRESPONDENCE -status report verifying continuing efforts toward resolving the issues is
required within the same timeline.
b. The vicinity map on page 1 of 5 is not of the site. It appears to be
somewhere in Highlands Ranch.
c. Per Zoning's comment number 3, before the project proceeds, we need
a written description explaining if and/or why it is technically
necessary to locate the equipment at the proposed height (91 feet
above grade). Unless it can be shown that that Voicestream has tried
in good faith to achieve co -location with the US West wireless
equipment in the clock tower of the Scotch Pines building on the
corner, or that the Voicestream equipment technically won't work at
that clock tower location, the requirements of 3.8.13(B) of the Land
Use Code is not met.
d. Please submit 3 copies of revisions (Zoning, Light and Power, and
Current Planning). Once all the comments have been addressed, we
can schedule a hearing.
Be sure and return all your redlined plans when you resubmit.
If you have any questions about these or any other issues related to this
project please feel free to call be at 221-6750.
Y urs truly,
Troy Jones V
City Planner
2
Commui f Planning and Environmental c vices
Current Planning
City of Fort Collins
STAFF REVIEW COMMENTS
Jill Cleveland
Voicestream
2323 Delgany Street
Denver, CO 80216
May 31, 2000
Staff has reviewed your submittal for The Scotch Pines Wireless
Telecommunication Equipment, and we offer the following comments:
COMMENTS:
1. Zoning:
a. Please see the attached comment sheet from Zoning.
2. Engineering Department:
a. Please seethe attached comment sheet and redlined plans form
Engineering.
3. Light and Power:
a. Please see the attached comment sheet from light and power
4. Natural Resources, Advance Planning, Building Inspection:
a. These departments have reviewed the application and have no
comments.
5. Current Planning:
a. Section 2.2.11 of the Land Use Code requires that an applicant submit
revisions based on this letter within 90 days or the project application
becomes null and void. Your response to the City's concerns is due by
August 29, 2000. A 30-day extension to this deadline is available. All
requests for an extension should be directed to the Current Planning
Director. If remaining issues are those that do not require plan revisions, a
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020