HomeMy WebLinkAboutSOUTHGLEN PUD, 2ND FILING REPLAT - MAJOR AMENDMENT - 31-99A - CORRESPONDENCE - (3)Project: Date: 2'(0 1 is
Planner: Traffic Operations: Engineer:
Items Requested
Redlined Items Being Returned
v
i7i
,�
a
Other Items Required
a;
�
a
Y
,� �
Other Items being
Returned
EngineeringI
I
2Pfta2F4G�
Stormwater
Water Wastewater,
►
t
t
I
Traffic Operations
Transportation Planning
Transfort
Natural Resources
Park Planning
I
44AA-
TOTALS
Z
Llh�e� �noGwk�{'�n
Other.'
f a
Note: All redlined items should be returned with the resubmittal/revisions.
REVISION ROUTING SHEET
•
•
•
ENGINEERING PAVEMENT
BUILDING INSPECTI
=�Mmmmm
LIGHT & POWER
mmmmmm
TECHNICAL SERVICES
POLI
♦ .. ..WATER
R.O.W. PLANNING
CONSERVATION
• •
PUBLIC SERVICE
AT & T DIGITAL CABLE
DITCH -COMPANY
ILROAD: UP or BNSF
- .......
ML
�:tlo-$ -6
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 29 Created: 2/26/2003
No comments
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 30 Created: 2/26/2003
Proposed fire hydrant must be located within a utility easement?
Number: 31 Created: 2/26/2003
Place the gate valve for the proposed fire hydrant within the asphalt/drive area and the fire
hydrant 2 feet behind the curd.
Number: 32 Created: 2/26/2003
Clearly define all aspect of water and sewer abandonment's (i.e. remove curb stop
box/meter pits, fill ends of water mains with non -shrink grout, etc.). All water and sewer
services must be abandoned at the mains. Include a note on the utility plans to
"Coordinate abandonment's with the City of Fort Collins Utilities at 221-6700".
Number: 33 Created: 2/26/2003
Provide inverts and top of pipe at the areas where water, sanitary sewer and storm
sewers cross.
The Current Planning Department comments are on a red -lined Landscape Plan that is
enclosed with this comment letter to the applicant.
This completes staff comments at this time. Additional comments may be forthcoming. This
development request is subject to the 90-day revision re -submittal (from the date of
this comment letter) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure
and return all of your redlined plans when you re -submit. The number of copies of each
document to resubmit is indicated on the attached Revision Routing Sheet.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at 221-6341.
Yours Truly,
JWUOJ_a��.
Steve Olt,
City Planner
cc: Susan Joy, Engineering Department
Ed Stoner, Owner
Page 3
Number: 9 Created: 2/25/2003
Per Lance Newlin, Chief Inspector, the street patch/overlay must extend the full width of the
street.
Number: 10 Created: 2/25/2003
Show all easements on all sheets as shown on the plat.
Number: 11 Created: 2/25/2003
Correct the Existing Chain Link Fence label in the Legend. Should it be "Proposed
Underground Electric'?
Number: 12 Created: 2/25/2003
A drainage easement is required for the off site storm sewer work. Is the existing tract from
the multifamily units already designated as such? If not, you will need to provide the off site
drainage easement. If the easement already exists, then you will need to show this on the
plan with the reception number and provide a letter from the neighboring property owner
saying that they are aware of the proposed work on their site and grant permission to enter.
Number: 13 Created: 2/25/2003
Update all details to the current details shown in LCUASS. Provide details 702, 706, 1601,
1602, and 2201.
Number: 18 Created: 2/25/2003
Provide a Temporary Construction Easement to move the existing fire hydrant.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 34 Created: 2/26/2003
There needs to be a drainage easement for the storm sewer behind Lot 2. The easement.
needs to be 20 feet wide (10 feet each side of the sewer pipe).
Topic: Sediment/Erosion Control
Number: 35 Created: 2/27/2003
1. The erosion control notes on sheet 2 are Larimer County notes. Please delete these
and put the City of Fort Collins erosion control notes on the erosion control plan, sheet 5.
2. There is no note on the erosion control plan (sheet 5) stating that minimizing overlot
grading is to be the primary form of erosion control (pre your letter).
3. What will protect the lot north of Lot 1?
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
Number: 63 Created: 12/16/2002
Light and Power will need to cross Albion Way at Lots 2/3. The developer will need to
provide a street cut permit, pay all associated street cut fees, and repair asphalt as required
by Engineering.
Page 2
Jim Sell Design
C/o Kent Bruxvoort
153 West Mountain Avenue
Fort Collins, CO. 80524
STAFF PROJECT REVIEW
Date: 3/7/2003
Staff has reviewed your submittal for SOUTHGLEN PUD, 2ND FILING REPLAT - MAJOR
AMENDMENT, and we offer the following comments:
1$-111:63
Department: Engineering Issue Contact: Susan Joy
Topic: Landscape Plan
Number: 16 Created: 2/25/2003
Show all easements as shown on the Plat.
Number: 17 Created: 2/25/2003
Correct the Existing Chain Link Fence label in the Legend. Should it be "Proposed
Underground Electric"?
Topic: Plat
Number: 14 Created: 2/25/2003
From Technical Services: Legal matches plat. Plat closes. See redlines on plat.
Number: 15 Created: 2/25/2003
From Engineering: See redlines.
Topic: Soils Report
Number: 28 Created: 2/25/2003
In accordance with 5.6.1, a subsurface water investigation report shall be submitted for
approval by the Local Entity Engineer if groundwater is encountered within 5 feet of the
original surface. The soils report submitted, dated August 28, 1979, states that groundwater
was encountered at 4.5 feet. Please provide an updated soils report as well as a
subsurface water investigation report if still applicable.
Topic: Utility Plans
Number: 6 Created: 2/25/2003
Correct the legal description to match the plat and place above the date in the title.
Number: 7 Created: 2/25/2003
Correct the vicinity map to show the cul-de-sac.
Number: 8 Created: 2/25/2003
Manholes are not allowed in sidewalks or wheel paths. Will need to relocate the manhole
into the proposed 20' drainage easement or an acceptable location in the street - or see
redlines for another suggestion. Also, show how the remaining portion of the existing storm
pipe will tie into the proposed manhole. Suggest a utility coordination meeting prior to your
next submittal, please contact me to set up a date. They are held every Wednesday,
starting times beginning at 1:30pm to 3pm in half hour increments.