HomeMy WebLinkAboutSOUTHGLEN PUD, 2ND FILING REPLAT - MAJOR AMENDMENT - 31-99A - CORRESPONDENCE - REVISIONSand Associates mapping for the project. Similarly, for the purpose of consistency with.
previous studies at the site, basin delineations were selected from the most recently
submitted drainage report for the site, that being JR Engineering's report for Filing 5.
While it is recognized that there is some discrepancy between the two sets of information,
our field review of the site and our desire to remain consistent with previous work for the
project led us to use the basin delineation as previously depicted.
Engineering
1. Show all utilities and easements on the Landscape Plan.
Response: All utilities and easements have been shown on the Landscape Plan.
2. A required street tree is missing on Lot 1.
Response: We are unable to fit a tree on the frontage of Lot 1 with the driveway,
specified utility separations, and the location of the existing storm manhole. Rather, we
have provided an extra street tree in front of Lot 3.
3. Change Tract A to a Public Access Easement.
Response: Tract A has been identified as a Drainage and Access Easement.
4. The easement vacation note on the subdivision plat is wrong.
Response: The easement vacation note on the subdivision plat has been corrected. .
5. There must be a minimum of 20' from the back of sidewalk along Albion Way to
the garage doors. '
Y.
Response: We depict the building envelope on the plans, with required front, side and
rear setbacks, including a minimum 15' from the ROW. A note has been added to refer
to the Land Use Code for garage door setback of 20'.
•Redlined plans have been returned with this resubmittal. If you have any questions
regarding this project, please don't hesitate to call me.
Sincerely;
Kent Bruxvoort,P.E.
Senior Engineer
Provide stationing of all sewer services (from downstream manholes).
Response: Sewer services have been labeled from downstream manhole.
The following comments and concerns were expressed at staff review on August 21,
2002:
Zoning
Add a street tree in front of Lot 1:
Response: We are unable to fit a tree on the frontage of Lot 1 with the driveway, .
specified utility separations, and the location of the existing storm manhole. Rather, we
have provided an extra street tree in front of Lot 3.
Transportation Planning
1. Make the walkway in Tract A a hard surface walk from Albion Way to the parking
lot in the South Glen, Second Filing multi -family area. It should be 5' wide.
Response: We believe that a sidewalk connection from the existing Albion Way, with
sidewalks on both sides of the street, through the tract to the parking lot of the existing
apartment complex will not provide a pedestrian friendly alternative to the existing
sidewalk network. Moreover, the existing sidewalk system on Albion Way and
Manhattan Avenue provides adequate pedestrian'connectivity for residents along Albion
Way to access Lopez Elementary School, Troutman Parks and neighborhoods to the.west.
For these reasons, we have not included a sidewalk through the tract.
Stormwater
Tract A has to be 20' wide to accommodate the storm drainage facility.
Response: Tract A has�been widened from 10''to 20'.
2. A drainage easement is needed in Lot 1 for the storm sewer
Response: A drainage easement has been combined with the utility easement to create a
"drainage and utility easement".
3.1 The basin drainage map does not match the contours shown on this site.
Response: Since the engineering design was for a re -plat, no additional field survey was
conducted; existing topography shown on the plans was prepared from previous Stewart
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility
27
Show and label all existing water and sewer mains and services in this developments
vicinity.
Response: Existing water and sanitary sewer location have been shown and labeled on
the Utility Plan.
28
Clearly define all abandonment procedures for existing water and sewer mains and
service: All water and sewer services must be used or abandoned at the main.
Response: Abandonment notes have been added to the plans.
29 °
Place a fire hydrant at the termination point of the existing 6-inch water main in the
southwest portion of this site. -Provide the standard fire hydrant and thrust block detail on
the detail sheets.
Response: A fire hydrant has been added at the termination point of the 6-inch line and
the additional details have been added -to the detail sheets.
34
If meter pits are being installed then show and label locations of meter pits/curb stops.
Provide sufficiept utility easement for gas main, storm sewer, -electric main and curb stop
on lot 3.
Response: The meter pit locations have been shown on the Utility Plan.. Assuming this
comment is directed toward Lot.I and not. Lot 3, a sufficient easement has been provided
for gas and storm. The electric main will cross from the east side of Albion Way and
service Lot 1. at the south property line.
35
Maintain 10 feet of separation between water/sewer services and side lot property lines.
Response: 10 feet or more of separation has been allowed between water and sanitary
services. 10 feet of separation from lot line to sanitary service was not possible on all lots
due to separation specifications with trees and other utilities.
36
Label sizes of all proposed water and sewer services.
Response: All proposed service sizes have"been identified.
37
boundary coming across this swale. Please revise all basin lines to reflect the grading of
the site.
Response: The drainage basin boundary lies on the property boundary of Lot 3. The
previously proposed pan had directed runoff near the south property line to Albion Way.
Although it may have appeared that the grading plan and drainage plan were in conflict .
with each other, the spot elevations on the pan illustrated that positive drainage was
achieved despite the close drainage divide. The pan has been since been removed (please
see comment 51.)
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
47
Identify Tract A as an access easement on the replat. On the landscape plan include a 5
foot walkway connection from the sidewalk on Albion Way to the walkway in front of
Bldg. E, while preserving the existing trees'.
e
Response: We believe that a sidewalk connection from the existing Albion Way, with
sidewalks. on both sides of the street, through the tract to the parking lot of the existing
apartment complex will not provide a pedestrian friendly alternative to the existing
sidewalk, network: Moreover, the existing sidewalk system on Albion Way and
Manhattan Avenue provides adequate pedestrian connectivity for residents along Albion
Way, to access Lopez Elementary School, Troutman Parks and neighborhoods to the west.
For these reasons, we have not included a sidewalk through the tract.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Landscape plan .
38
Show all water and sewer services on landscape plans.
See site, landscape and utility plans for other comments.
Response: Water and sewer services have been added to the landscape plan. .
Department: Water Wastewater ' Issue Contact: Roger Buffington
Topic: Utility
45
Locate water services near center of lot (but not in drives) and sewer services 10 feet
north of water services.
Response: Water services have been located near the center of the lots. Sanitary services
for Lots 1 and 3 are located approximately 20 feet to the north of the water services due
to conflicts with street trees. The sanitary service for Lot 2 is located approximately 20
feet to the south of the water service due to conflicts with the driveway, gas service and
street tree locations and separations. .
No Issues. e '
Department: Stormwater Utility Issue Contact:- Wes Lamarque
Topic: Drainage
42
A 20-foot drainage easement is required between lots 1 and 2 for the 15-inch stormsewer.
Response: The drainage easement has been widened from 10' to 20'.
43
Please add corner lot spot elevations for the 3 lots on the grading plan.
Response: Spot elevations have been added on the Grading Plan.
44
An easement is needed for the new stormsewer in front of Lot 1. Please see redlined plat.
Response: This area has been designated as a "Utility Easement". This easement will be
relabeled as a "Drainage and Utility Easement".
51
A drainage pan is not needed along the south side of Lot 3 for side lot swales with a slope
of at least 1 %. '
Response: The drainage pan has been removed.
52
Is drainage from the multi -family site entering Lots 2 and 3 from the west? Flows need
to be directed to the stormsewer or tract between Lots 1 and 2. If this cannot be
accomplished, than a drainage easement would be required for the offsite flows to pass •
through these lots. •
Response: Avery small amount of drainage from the multi -family site enters lots 1, 2,
and 3 and the drainage tract. The minimal drainage enters these lots as sheet flow. There
is only 2500 sq. feet of offsite area contributing runoff to. Lot l . Similarly, there are only
850, 3200, and 830 sq. ft. of area contributing runoff to Lots 2, 3, and the drainage tract,
respectively. The proposed lots are graded using standard FHA grading guidelines that
ensure there is proper drainage around each building envelope. Spot elevations and
drainage arrows shown on the grading plan illustrate that there is appropriate drainage
around each building envelope., Locating a drainage easement on each lot for such a
small amount of offsite contributing area is not necessary due to the negligible amount -of
sheet flow entering the lots.
53
The -drainage plan does not match in all areas the grading of the site. On Lot 3, there was
a pan directing flow down the side of this lot when the drainage plan shows a basin
26
Driveways must be a minimum of 20' from BOW to the garage door, 3.5.2.D.2 of the
Land Use Code. Two driveways do not meet this requirement.
Response: We depict the. building envelope on the plans, with required front, side and
rear setbacks, including a minimum 15' from the ROW. A note has been added to refer
to the Land Use Code for garage door setback of 20'.
30
Provide details 7-29B, 16-11 16-2.
Response: These have been added to the detail sheets.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
1 ;
In order to install electric utility facilities to serve this replat, it will be necessary for L&P
to trench across the front (behind the attached sidewalk) bf 333 Albion Way as well as
i
these lots. The storm sewer location shown will preclude the installation of electric
facilities. The storm sewer must be changed to provide a location for the electric line.
Also, the. developer will be responsible for replacement of landscaping as necessary on
333 Albion Way.
Response: We -met with Doug on 12-16-02: the electric line will come under Albion Way
from the east side of the street to a•vault on the north property line of Lot 3. e
2 q
The water service to lot #3 must be moved to be a minimum of 6 ft. from the side lot line
to allow for installation of an electric vault.
Response: After meeting with Doug on 12-16-02, the water service will need to be a
minimum of 9.5' from the north•property line of Lot 3. This allows room'for an electric
vault.
3
The transformer at the apartments to the west (adjacent to building F) was sized to also
serve future buildings E, L, and a clubhouse within that development. Since these.
buildings will now not be constructed, this developer will be responsible for costs to
downsize this transformer to the correct size (approximately $400.00), in addition to
normal L&P'Development Charges.
Response: Per our meeting with Doug on 12-16-02, this comment can be disregarded.
Department: Natural Resources. Issue Contact: Doug Moore
Topic: General
46
19
Show all ROW, property lines and easements with dimensions and labels.
Response: ROW, property lines and easements have been labeled and dimensioned.
20
The City's signature block must be provided on each sheet in the lower right corner of
each sheet. Each signature block must measure 3.5" high x 4.5" wide.
Response: Signature blocks have been added to all sheets.
21
Please ghost existing features so that the proposed improvements are clearly defined.
Right now all the line weights are the same and it's not clear what your construction
limits are in the.public ROW. Is the existing curb and gutter rollover or vertical?
Response: The lineweights for existing features have been changed for clarity. The
existing curb is rollover and has been noted in the plans.
22 '
Provide a legend, each sheet, that clearly defines existing and proposed
features for that sheet.
Response: A legend has been added to all sheets.
23
Show street names, each sheet.
Response: Street names have been added to each sheet.
24
Areas of overlay; milling, pavement removal and/or reconstruction are not clearly
defined. Please provide the street cut note where applicable:
Limits of street cut are approximate. Final limits are to be determined in the field
by the City Engineering Inspector. All repairs to be in accordance with City street
repair standards.
Response: The above note has been added to the Utility Plans Sheet and additional notes
have been added to clarify areas of overlay, milling and pavement removal.
25
Station all driveways from the centerline.
Response: Driveways have been stationed from the centerline.
0
10
Provide 2 project, benchmarks where req'd in the General Notes.
Response: The two benchmarks have been added to the General Notes.
' 11 _ •
Provide a soils report for the project.
Response: A copy of the project's previous soils report is attached.
12
Reference the soils report where req'd in the General Notes.
Response: This preference has been,added.
13
Provide the statement shown in Appendix E4 (checklist), section I, item J.
Response: The statement has been added to the Cover Sheet.
14
Complete and submit the Checklist, Appendix E4 with the next submittal. _
Response: The completed checklist is attached.
15
Provide the indemnification statement, LCUASS 3.3.LF.
Response: This statement has been added to the Cover Sheet.
16
Label the existing contour lines on the drainage sheet.
Response: Contour labels have been added.
17
Provide finish grade elevations for all lot corners.
Response: Lot corner spot elevations have been added to the Grading Plan•.
Provide the statement shown in Appendix E4, II, E on the grading sheet.
Response: This statement has been added to the Grading Plan.
40
Correct the Engineering and Planning Certificate. See attached.
Response: The certificates have been modified per. attached.format.
48 "
Change the "Pedestrian" access easement to read "Public" access easement.
Response: Access easement changed per comment.
Topic: Utility '
4
Title of Utility Plans should read "Utility Plans For............".
Response: The title on of the plan set has been changed to "Utility Plans For South Glen
P.U.D. 2nd Filing Replat".
5 _ 1 C
Provide the legal description of the project below the project name.
Response: The legal description has been added.
6
Vicinity map is shown in the wrong size and the wrong scale. Please scale to 1" = 1000 -
1500' and map should be 10"x10". "
Response: The vicinity map has been changed to the proper dimensions.
7
Do not number the plat or landscape plan in the index. You may include these plan .
sheets with the set but do not number as part of the utility plans.
Response: The plat and landscape plan numbers have been taken off the Cover Sheet.
P
8
Title: Provide the current date (month and year) under the legal description.
Response:. The current date has been added under the legal description.
9
Update the General and Construction Notessee appendix E 1 and E2 and fill in the
appropriate blanks. I can email these docs to you at your request. Email me at
sioyna,fcgov.com
kesponse: The updated General and Construction Notes have been added. '
2." Any extension of gas facilities will be in accordance with the extension policy on
file with the Colorado Public Utilities Commission.
.3. No trees may be planted within 4' of any gas lines.
Response:. So noted. °
60
A 13' wide utility easement, not 9' wide, is needed along the front of the lots for electrical
service and stop locations.
Response: A 1 Y wide utility easement has been added along the front of Lots 1, 2 and 3.
Department: Engineering Issue Contact: Susan Joy
Topic: Landscape plan
49
Show and label all•easements and utilities.
Response: All easements and utilities have been shown and labeled.
50
Remove the contour lines for legibility.
Response: The contour lines have been removed.
a
Topic: Plat
From Technical Services: Boundary and legal closes.
Response: So noted.
32
From Technical Services: Subtitle of Plat wrong/missing. See redlines.
Response: The subtitle was re -worded per redline comment.
33
From Technical Services; Easement vacation note wrong - see redlines.
Response: The easement vacation note has been re -worded per reline comment.
39 .
Correct the plat language under Statement of Ownership'and Subdivision. See attached.
Response: The plat language referred to has been re -worded per the redline comment.
• ' Response: This tree is a mature sized.Russian Olive. A phone conversation on 12-16-02
with Tim Buchanan confirmed that this tree is on a strongly discouraged landscape list '
and does not need to be evaluated by the City Forester and can be removed without
mitigation. '
59 e
A street tree is needed somewher6'along the street frontage of Lot 1'.
Response: We are unable to fit a tree on the frontage of Lot 1 with the driveway,
specified utility separations, and the location of the existing storm manhole. Rather, we
have provided an extra street tree in front of Lot 3. .
61
The Landscaping — Assurances note on the Landscape Plan is not complete. Please see
the enclosed red -lined plan.
Response: Assurance note has been modified per the Fort Collins Land Use Code
3.2.1.L4.
62
Additional information is needed on the Landscape Plan. Please see the enclosed plan.
Response: The landscape plan has been modified in response to the comments.
Topic: Utility
54
Dennis Greenwalt of AT&T Broadband (cable TV) indicated that they have -existing
cable facilities that run through this area to provide service to the South Glen PUD,
Second Filing.. At this time'they will not vacate their easement with the management of
South Glen PUD, Second Filing. Please contact Reneta Santro, at 970-491-3106, about
the process of changing AT&T Broadband's agreement with the management of South
Glen PUD, Second Filing.
Response: We talked to Reneta Santro on 12-16-02. She stated that AT&T has a
blanket access easement and if there are no physical lines that need to be moved then the
proposed amendment to the plat would be acceptable to them without modifying the
agreement. After talking with Dennis Greenwalt with AT&T a utility locate was ordered
for Wednesday 18`h, 2002. The utility locate was performed as scheduled and no
existing cable facilities were found in the area.
55
Len Hilderbrand of Excel Energy offered the following comments:
Any relocation, cutoffs, or abandoning of existing facilities will be at the
developer's expense.
a
D
D
0
RECEIVED
J k� 3 0 21)03
CURRENT PLANNING
January 29, 2003
Steve Olt
Planning Department
281 N. College Avenue
P.O. Box 580
a
Fort Collins, CO 80522
RE: South Glen PUD 2Id Filing Replat/Major-Amendment
#31-99A
Project # 222'3 ,
Steve Olt, ,
L mAvpe An-6dectmr
btqureemu q
birbl nma1tnl6' Community pGwnim7
This letter is in response to the comment letter from the City of Fort Collins staff dated
September 3, 2002. Jim. Sell Design.has modified the plans and provided to the City
other documents as required to address these comments, as described below.
ISSUES: •
Department: Current Planning Issue Contact: Steve Olt
Topic: Drainage
56
Tract A, between Lots 1 & 2, needs to be 20' wide to accommodate the necessary storm
drainage easement.
Response: Tract A has been widened from 10' to 20'
Topic: Landscape plan
'57
The 2 trees in Tract A shown to be relocated can be preserved in their present location if
the tract is widened per Stormwater's requirement.
Response: With the widening of Tract A, the -southernmost of these two trees can stay,
but the northernmost tree has a proposed storm line running underneath it. This
northernmost tree will need to be relocated to the rear. of Lot 2 as shown on the
Landscape Plan.
58
The existing tree on Lot 2 shown to'be removed may be a significant tree. Has the City
Forester been to the site to evaluate the tree? Some mitigation may be required.
JIM SELL DESIGN,