HomeMy WebLinkAboutSCOTCH PINES WTF, CRICKET COMMUNICATIONS - PDP - 34-99D - CORRESPONDENCE -Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
BOB BARKEEN
City Planner
Page 3
7
Issue Contact: Alan Rutz
Tower location has changed Comment # 5 is no longer valid
Issue Contact: Alan Rutz
Contact Alan Rutz at Light & Power immediately with load requirements and proposed
service line location.
The transformer located north and west of site is 150KVA 120/208 volts.
The transformer located south and east of site is 500KVA 277/480 volts.
This transformer has CT's installed in the transformer.
Department: PFA
3 Issue Contact: Michael Chavez
No Comments
9
No Comment
Department: Transportation Planning
4
no comments
10
No comment
Department: Zoning
6
Issue Contact: Michael Chavez
Issue Contact: Mark Jackson
Issue Contact: Mark Jackson
Issue Contact: Peter Barnes
They are proposing a 6' high chain link fence to screen equipment. 3.8.13(C)(5)
prohibits the use of chain link for screening. Needs to be wood, stucco, masonry, etc
and be opaque. Also, since the equipment is taller than 6', they'll need landscpaing or
something else to screen it all.
Page 2
6" STAFF PROJECT REVIEW
City of Fort Collins
LUCENT TECHNOLOGIES Date: 10/3/01
CRICKETT COMMUNICATIONS
DREW DEWHIRST
140 W. OAK ST. #230
FT. COLLINS, CO 80524
Staff has reviewed your submittal for SCOTCH PINES WTF, CRICKET
COMMUNICATIONS -TYPE I #34-99D, and we offer the following comments:
ISSUES:
Department: Current Planning
11 Issue Contact: Bob Barkeen
Masonry wall is needed for screening
The proposed chain link enclosing the ground -mounted equipment is unacceptable.
Enclosure material must be opaque and match the existing building. A masonry wall will
need to be proposed with wooden access gates.
12 Issue Contact: Bob Barkeen
Setbacks need to be noted
Setbacks from the property lines to the tower will need to be shown on the site plan.
13 - Issue Contact: Bob Barkeen
Planning Certification needs to be on the site plan (enclosed) instead fo the P&Z
certificate. Department: Engineering
2
no problem,_-----jG—'
Department: Light & Power
5
Issue Contact: Dave Stringer
Issue Contact: Alan Rutz
System modifications will be required to provide power to this site. Contact Light &
Power as soon as possible with load, voltage and phase requirements. No other
comments can be given without contact from the applicant.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page 1