Site
AM / PM
Access
Ai�lk'
��ts
EXISTING PEAK HOUR TRAFFIC
8
Figure 3
sections of roadway which have gaps in the pedestrian network or
' very narrow sidewalks are listed below.
JFK Parkway North of Boardwalk on the west side of JFK, there
' is one section where a temporary 2.5 to 3 foot
asphalt sidewalk exists on a parcel of land which
is currently vacant. North of Boardwalk on the east
side of JFK there is no sidewalk with the exception
' of a northern section near Horsetooth Road and a
small section of sidewalk near a. bridge structure
for a canal.
' Landings North of Boardwalk on the west side of Landings,
there is a section where no sidewalk currently
exists. This section is south of The Wharf
' Condominiums and north of the Landings Office
development. North of. Boardwalk on the east side
of Landings, there are no sidewalks adjacent to the
' residential areas of the Landings residential area.
Troutman Between JFK Parkway and Boardwalk Drive, there
exists a 2.5 foot wide side walk on both sides of
Troutman. This sidewalk is adjacent to vacant
parcels of property.
There are pedestrian crosswalks on Boardwalk Drive at both
Breakwater Drive and Westshore Way. 'These crosswalks provide
access to the park located on the west side of Boardwalk at
' Westshore. Pedestrian activity is extremely light, as noted on the
traffic count forms provided in Appendix A.
' BICYCLE FACILITIES
There are bicycle lanes on each of the roadways within the study
' area. The bicycle lanes are primarily 5 feet wide, from face of
'curb to the edge of the lane line. Bicycle activity is very light,
as noted on the traffic count forms provided in Appendix A.
' TRANSIT SERVICE
' 'There is currently one transit route, Route 1, which is just beyond
1/,4 mile walking distance of the project site. Route 1 provides
service on College Avenue from the Front Range Community College
' and the South Transit Center, the North Transit Center, and ("SU.
There are bus stops on College Avenue at Boardwalk Drive and
Troutman Parkway. Route 1 provides 30 minute headways and service
' is provided for 12 hours on weekdays.
1 'i
EXISTING INTERSECTION PEAK IiOUR TRAFFIC VOLUMES
' Morning and evening peak hour traffic_ counts were conducted at each
of the study intersections during April 1997. The existing peak
hour traffic volumes are depicted in Figure 3. The count data is
' provided in Appendix A.
INTERSECTION LEVEL OF SERVICE METHODOLOGY
Level of service (LOS) is a qualitative measure used to describe
the conditions of traffic flow, ranging from excellent conditions
at LOS A to overloaded conditions at LOS F. Level of service
definitions are provided in Appendix B. Typically, the standard
for minimum acceptable LOS is D. The Signalized and Unsignalized
Intersection Analysis techniques, as published in the Highway
Capacity Manual by the Transportation Research Board in 1994, were
used to analyze the study intersections for each of the traffic
scenarios. These techniques allow for the determination of the
intersection level of service based on congestion and delay of each
'traffic movement.
W I EXISTING PEAK HOUR LEVELS OF SERVICE
' Tab,le,1 summarizes the existing weekday morning and evening peak
hour level of service at the study intersections. The capacity
worksheets are provided in Appendix C. Under existing conditions,
' the study intersections are operating at acceptable levels of
service during the peak hours, with the exception of the Boardwalk/
Landings intersection. At this intersection, the northbound
' traffic and the southbound left turns currently experience long
delays. 'The City of Fort Collins Traffic Engineering staff is
currently considering the elimination of left turns at this
location due to the recent signali.zation of the adjacent.
' intersection of Boardwalk and Troutman. Elimination of minor
street left turns will logically result in elimination of the minor
street through traffic also. Subsequent analysis of the Boardwalk/
' Landings intersection will assume that this restriction has been
put into effect.
PEDESTRIAN FACILITIES
As mentioned within the description of the street system, most of
the study area currently has sidewalks to accommodate pedestrian
' flows. The pedestrian facilities within a 1/4 mile of the project
site were examined. The existing sidewalks vary in location from
' being directly attached to the curb and gutter to being detached
with a parkway separation between the roadway and the sidewalk.
The width of the sidewalks vary from 2.5 feet to 7 feet. The
II. EXISTING CONDITIONS
' A comprehensive data collection effort was undertaken to develop
a detailed description of the existing conditions within and near
the project site. The assessment of conditions relevant to this
study include land use, streets, traffic volumes, traffic operating
' conditions, pedestrian facilities, bicycle facilities, and transit
service.
EXISTING STREET SYSTEM
As illustrated on Figure 1, Boardwalk Drive is a curvilinear minor
arterial street. This roadway currently is built with two travel
lanes, one in each direction. At most intersections, there are
left -turn lanes. The speed limit is posted at 30 mph. The
Boardwalk/JFK Parkway intersection is signalized. The
intersections of Boardwalk and the following locations are stop
sign controlled: Landings, High Point Drive, and Troutman Parkway.
There are sidewalks and bike lanes on both sides of Boardwalk
Drive, with the exception of no sidewalk along the site frontage.
A variety of land uses exist adjacent to Boardwalk: near College
Avenue are commercial/office uses, near Landings are the Fort
Collins Post Office and other office uses, and the remainder of
uses are primarily residential. There is also a neighborhood park
located directly adjacent to Boardwalk across from Westshore Way.
JFK Parkway is a north/south arterial street which exists between
Monroe (adjacent to the Foothills Fashion Mall) and terminates to
the south of Troutman Parkway. JFK Parkway will be extended to
Harmony Road in the future. The speed limit is posted at 30 mph.
North 'of Boardwalk, JFK is currently striped to provide three
travel lanes, two southbound lanes and one northbound lane. South
of Boardwalk, JFK Parkway has four travel lanes and a center left -
turn lane. There are bike lanes on both sides of JFK. The
adjacent land uses include commercial, office, residential, and
the Fort Collins Post Office.
Landings Drive is a two lane, north/south minor arterial street
between Horsetooth Road and Boardwalk Drive. The speed limit is
posted at 25 mph. The adjacent land uses include residential and
office. Landings terminates at the driveway to the Fort Collins
Post Office.
Troutman Parkway is a east/west arterial street. This roadway is
striped to accommodate two travel lanes and a center left -turn
lane. There are sidewalks and bike lanes on both sides of
Troutman. The adjacent land use is commercial and multi -family
residential.
■ 5
A&
N
NO SCALE
SITE PLAN
4
Figure 2
0
N
ks
Ilion.
P P
Ui
cr
01
1" = 2000'
SITE LOCATION
Figure 1
generated by proposed projects within the vicinity of the
project site.
Project Generated Traffic - The traffic generated by the
proposed project will be determined..
Total Traffic- Years 2000 and 2015 - This is an analysis
of future traffic conditions with traffic expected to be
generated by the proposed project added to the background
traffic forecasts. The impacts of the proposed project
on future traffic operating conditions can then be
identified.
The City of Fort Collins identified the following intersections to
be'analyzed for the scenarios above:
1.
Boardwalk
Drive
and
JFK Parkway
2.
Boardwalk
Drive
and
Landings Drive
3.
'Boardwalk
Drive
and
High Point Drive (proposed access
drive)
4.
Boardwalk
Drive
and
Troutman Parkway
5.
Boardwalk
Drive
and
the south access drive
ORGANIZATION OF REPORT
The remainder of this report is divided into six parts. Chapter
II presents an analysis of the existing street system and traffic
conditions for each of the study intersections. Also included in
Chapter II are assessments of the pedestrian, bicycle, and transit
facilities in the area. Forecasts of future background traffic for
Years 2000 and 2015 are provided in Chapter III. Traffic
projections for the proposed project are discussed in Chapter IV.
Chapter V presents the total traffic projections for Years 2000 and
2015. The future intersection operating conditions and pedestrian,
bicycle, and transit level of service are presented in Chapter VI.
Chapter VII provides a summary of the study results.
2
I. INTRODUCTION
This report documents the findings of a transportation study
conducted to evaluate the potential traffic impacts and circulation
needs of the proposed High Point Office Park, located near
Boardwalk Drive and Landings Drive in Fort Collins, Colorado.
PROJECT DESCRIPTION
The proposed project is an office park, which would accommodate
approximately 55,000 square feet of office use. The project is
located southwest of Boardwalk Drive and east of Landings. The
site location is shown on Figure 1. Access to the proposed project
would be from two access drives. The site plan is depicted on
Figure 2. The north access drive would be aligned with High Point
Drive. Both access drives are proposed to provide full access into
and out of the site.
STUDY SCOPE
The scope for this study was developed in conjunction with the Fort
Collins Transportation Engineering staff. The base assumptions,
technical methodologies, and geographic coverage of the study were
all identified as part of the study scoping meeting.
The study is directed at the analysis of potential project
generated traffic impacts along the existing and future street
system. The following traffic scenarios are analyzed in the study:
Existing Conditions - The analysis of existing traffic
conditions is intended to provide a basis for the
remainder of the study. The existing conditions analysis
includes an assessment of traffic volumes and operating
conditions at the study intersections.
Background Traffic - Year 2000 - Future traffic
conditions will be projected for Year 2000. The
objective of this phase of the analysis is to project
future traffic growth and operating conditions which
could be expected to result from general growth and from
related projects in the vicinity of the project site.
Backqround Traffic - Year 2015 - Future traffic
conditions for Year 2015 will be determined. The Year
2015 traffic projections will be determined. by accounting
for overall future growth in the city and for traffic
1
LIST OF FIGUR-ES
Fjgure
Pagee
1.
Site Location ........................................
3
2.
Site Plan ............................................
4
3.
Exi-sting Peak Hour Traffic ...........................
8
4.
Background Peak Hour Traffic -
Year 2000 .............
12
5..
Background Peak Hour Traffic -
Year 2015 .............
13
6.
Site Generated Peak Hour Traffic .....................
16
7.
Total Peak Hour Traffic - Year
2000 ..................
18
8.
Total Peak Hour Traffic - Year
2015 ..................
19
APPENDIX
A Recent Traffic Counts
.B Description of Level of Service
C • Current Peak Hour Operation
D Short Range Background Traffic. Operation
E Short Range Total Traffic Operation
F Long Range Background Traffic. Operation
G Long Range Total Traffic Operation
TABLE OF CONTENTS
' I. Introduction ......................................... 1 Project Description 1
StudyScope .......................................... 1
' Organization of Report ............................... 2
II. Existing Conditions .................................. 5
' Existing Street System 5
Existing Intersection Peak Hour Traffic Volumes 6
Intersection Level of Service Methodology 6
Existing Peak Hour Levels of Service ................. 6
' Pedestrian Facilities ................................ 6
Bicycle Facilities 7
Transit Service ...................................... 7
' III'. Future Background Traffic Projections ................ 10
Background Traffic - Year 2000 ....................... 10
Background Traffic - Year 2015 ....................... 11
' IV. Project Traffic Projections .......................... 14
Trip Generation ...................................... 14
' Trip Distribution .................................... 14
Traffic Assignment 14
' V.' Future Total Traffic Projections ..................... 17
Total Traffic - Year 2000 . 17
Total Traffic - Year 2015 . 17
' VI. Transportation Impact Analysis ....................... 20
Traffic Analysis - Year 2000 ......................... 20
Traffic Analysis - Year 2015 ......................... 20
Pedestrian Level of Service 21
' Bicycle Level of Service ............................. 21
Transit Level of Service ............................. 2.1
' VII. Conclusions .......................................... 2.5
LIST OF TABLES
' Table Page
1. Existing Intersection Operation ...................... 9
' 2. Trip Generation ...................................... 1.5
3. Year 2000 Intersection Operation ..................... 23
' 4. Year 2015 Intersection Operation ..................... 24
u
PARK -PLALE
-Forme-r I-j
HIGH POINT OFFICE PARK
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
AUGUST 1997
Prepared for.:
Lagunitas Company
3307 South College Avenue, Suite 200
Fort Collins, CO 80525
Prepared. by:
MATTHEW J. DELICH, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
HCS: Unsignalized Intersections Release 2.1d ST15PT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N-S)= BOARDWALK (E W) TROUTMAN=====______
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
other Information......... TOTAL TRAFFIC - YEAR 2015 - PM PEAK HOU
R
Two-way Stop -controlled Intersection
Northbound Southbound== Eastbound westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 0 0 1 < 0 1 0 1 0 0 0
Stop/Yield N N
Volumes 120 670 555 25 25 230
PHF .95 .95 .95 .95 .95 .95
Grade
MCI (%)
SU/RV's 00
CV,s (%)
PCEIa
0
1.10
--------------
0
---------------
0
1.10 1.10
-------------
Adjustment Factors
vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
-------------------------------------------------------- - -----
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsignalized Intersections Release 2.1d ST15PT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
597
Potential Capacity:
(pcph)
690
Movement Capacity:
(pcph)
690
Prob. of Queue -Free
State:
0.61
--------------------------------------------------------
Step 2: LT from Major
Street
SE NB
--------------------------------------------------------
Conflicting Flows:
(vph)
610
Potential Capacity:
(pcph)
876
Movement Capacity:
(pcph)
878
Prob. of Queue -Free
State:
0.84
--------------------------------------------------------
Step 4: LT from Minor
----------------------------------------
Street
WB EB
--------------
Conflicting Flows:
(vph)
1428
Potential Capacity:
(pcph)
158
Major LT, Minor TH
Impedance Factor:
0.84
Adjusted Impedance
Factor:
0.84
Capacity Adjustment
Factor
due to Impeding Movements
0.84
Movement Capacity:
--------------------------------------------------------
(pcph)
133
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
-------- ------ ------ -------------------- --------------
EB L 29 133 34.6 0.9 E
11.0
EB R 266 690 8.5 2.1 B
NB L 139 878 4.9 0.6 A
Intersection Delay = 2.1 sec/veh
0.7
HCS: Unsignalized Intersections Release 2.1d
BHPI5P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
_
Streets (N-S) BOARDWALK DRIVE
(E W) HIGH POINT DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
Other Information......... BACKGROUND
TRAFFIC - YEAR 2015 - PM PEA
K HOUR
Two-way Stop -controlled Intersection
=
cEastbound =Westbound
_
=Northbound
Southbound
L T R
L T R
L T R
____
L T R
____ ____ ----
No. Lanes
____ ____ ____
0 1 < 0
____ ____ ____ ____
0 > 1 0
____
0 0 0
0 > 0 < 0
Stop/Yield
N
N
Volumes
880 5
5 590
5 5
PHF
.95 .95
.95 .95
.95 .95
Grade
Mc,s M
SU/RV'S (%)
CV,s (%)
PCE,a
0
---------------.
0
1.10
---------------
Adjustment Factors
0
1.10 1_10
-
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS__Unsignalized_ Intersections Release 2_ldBHPI5P.HC0===-- Page _2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
928
Potential Capacity: (pcph)
469
Movement Capacity: (pcph)
469
Prob. of Queue -Free State:
0.99
---------------------- --------------------------------
Step 2: LT from Major Street
SB
NB
________________________________________________________
Conflicting Flows: (vph)
931
Potential Capacity: (pcph)
617
Movement Capacity: (pcph)
617
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.98
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
__________________________________
Conflicting Flows: (vph)
--__________---
1554
Potential Capacity: (pcph)
133
Major LT, Minor TH
Impedance Factor:
0.98
Adjusted Impedance Factor:
0.98
capacity Adjustment Factor
due to Impeding Movements
0.98
Movement Capacity: (pcph)
________________________________________________________
131
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-------- ------ ------ ------
(sec/veh)
-------
WB L 6 131 >
------- -----
---------
205 18.7
0.1 C
18.7
WB R 6 469 >
SB L 6 617 5.9
0.0 B
0.0
Intersection Delay =
0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d BADISPT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N-S) BOARDWALK(E-W) ACCESS DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
Other Information......... TOTAL TRAFFIC - YEAR 2015 - PM PEAK HOU
R
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound westbound
L T R I L T R I L T R I L T R
No. Lanes 1 0 > 1 0 1 0 1 c 0 1 0 > 0 < 0 1 0 0 0
Stop/Yield
Volumes
PHF
Grade
MC, s M)
SU/RV's M
CV's (%)
PCE's
ITS
5 695
.95 .95
0
1.10
---------------
N
555 5
.95 .95
0
---------------
20 25
.95 .95
0
1.10 1.10
---------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
-------------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d BADISPT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
586
Potential Capacity: (pcph)
699
Movement Capacity: (pcph)
699
Prob. of Queue -Free State:
0.96
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
_______________
Conflicting Flows: (vph)
589
Potential Capacity: (pcph)
898
Movement Capacity: (pcph)
898
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
---------------------------------------------------
Step 4: LT from Minor Street
WE
EB
-------------------------------------------------
Conflicting Flows: (vph)
1324
Potential Capacity: (pcph)
181
Major LT, Minor TH
0.99
Impedance Factor:
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0•99
Movement Capacity: (pcph)
________________________________________________________
179
Intersection Performance
Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
______ _______
(veh)
_______
(sec/veh)
_____ ---------
________ ______ ______
BE L 23 179 >
306 14.2
0.7
C 14.2
EB R 29 699 >
NS L 6 898 4.0
0.0
A 0.0
Intersection Delay =
0.5 sec/veh
HCS: Unsignalized Intersections Release 2.1d BADISAT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets:=(N S) BOARDWALK = (E-W) ACCESS =DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
other Information......... TOTAL TRAFFIC - YEAR 2015 - AM PEAK HOU
R
Two-way Stop -controlled Intersection
= cc = Northbound Southbound = Eastbound Westbound
L T R L T R L 7 R L T R
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ----
No. Lanes 0 > 1 0 0 1 < 0 0 > 0 < 0 0 0 0
Stop/Yield N N
Volumes 30 580 325 20 5 5
PHF 95 .95 .95 .95 .95 .95
Grade
MC's (%)
SU/RV's (%)
CV's (%)
PCE's
0
1.10
--------------
0
------------
0
1_10 1.10
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap
(tg)
Time (tf)
__________________________________________________________________
Left Turn Major
Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d BADISAT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WE EB
Conflicting Flows: (vph)
352
Potential Capacity: (pcph)
918
Movement capacity: (pcph)
918
Prob. of Queue -Free State:
0.99
--------------------------------------------------------
Step 2: LT from Major Street SE
NB
________________________________________________________
Conflicting Flows: (vph)
363
Potential Capacity: (pcph)
1151
Movement Capacity: (pcph)
1151
Prob. of Queue -Free State:
0.97
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.95
--------------------------------------------------------
Step 4: LT from Minor Street WE
EB
--------------------------------------------------------
Conflicting Flows: (vph)
996
Potential Capacity: (pcph)
281
Major LT, Minor TH
Impedance Factor:
0.95
Adjusted Impedance Factor:
0.95
Capacity Adjustment Factor
due to Impeding Movements
0.95
Movement Capacity: (pcph)
________________________________________________________
268
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
________ ______ ______ ______ ______________ _____ ---------
EB L 6 268 >
415 8.9 0.0 B 8.9
EB R 6 918 >
NB L 35 1151 3.2 0.0 A 0.2
Intersection Delay = 0.2 sec/veh
HCS: Unsignalized Intersections Release 2.1d BT15AT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets:=(N-S) BOARDWALK (E-W) TROUTMAN
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
Other Information......... TOTAL TRAFFIC - YEAR 2015 - AM PEAK HOU
R
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound Westbound=
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 0 0 1 < 0 1 0 1 0 0 0
Stop/Yield N N
Volumes
PHF
Grade
MC's (%)
SU/RV's (%)
CV's (%)
PCE's
45 565
.95 .95
0
1.10
---------------
320 10
.95 .95
0
----------------
20 50
.95 .95
0
1.10 1.10
--------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d BT15AT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WS EB
Conflicting Flows: (vph)
342
Potential Capacity: (pcph)
929
Movement Capacity: (pcph)
929
Prob. of Queue -Free State:
0.94
---------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
348
Potential Capacity: (pcph)
1170
Movement Capacity: (pcph)
1170
Prob. of Queue -Free State:
0.96
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1006
Potential Capacity: (pcph)
277
Major LT, Minor TH
Impedance Factor:
0.96
Adjusted Impedance Factor:
0.96
Capacity Adjustment Factor
due to Impeding Movements
0.96
Movement Capacity: (pcph)
--------------------------------------------------------
265
Intersection
Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
-------- ------ --- - - ------
EB L 23 265
-------------- -----
14.9 0.2 C
-------
EB R 58 929 4.1
NB L 52 1170 3.2
Intersection Delay =
7.2
0.1 A
0.0 A 0.2
0.6 sec/veh
HCS: Unsignalized Intersections Release 2.1d BHPISPT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) BOARDWALK DRIVE (E W) HIGH POINT =DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
Other Information......... TOTAL TRAFFIC - YEAR 2015 - PM PEAK HOU
R
Two-way Stop -controlled Intersection
= LNorthboundd LSouthboundR LEastboundR LWestToundR
No. Lanes 0 > 1 < 0 0 > 1 < 0 0 > 0 < 0 0 > 0 < 0
Stop/Yield N N
Volumes 5 900 5 5 595 10 40 15 5 5
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0 0
MCI (%)
SU/RV's M
CV's (%)
PCE's
11_10 11.10 1.1011.10 1.10
---------------------------------------------
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsignalized Intersections Release 2.1d BHPISPT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
950
632
Potential Capacity: (pcph)
457
662
Movement Capacity: (pcph)
457
662
Prob. of Queue -Free State:
0.99
0.97
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
952
637
Potential Capacity: (pcph)
603
852
Movement Capacity: (pcph)
603
852
Prob. of Queue -Free State:
0.99
0.99
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.98
0.98
--------------------------------------------------------
Step 4: LT from Minor Street
WE
EB
-------------------------------------------------
Conflicting Flows: (vph)
1599
1594
Potential Capacity: (pcph)
126
126
Major LT, Minor TH
Impedance Factor:
0.97
0.97
Adjusted Impedance Factor:
0.97
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.94
0.96
Movement Capacity: (pcph)
--------------------------------------
119
--------------
120
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
-------- ------ ------ -------------
EB L 46 120 >
------- -----
---------
156 38.9
2.1 E
38.9
EB R 18 662 >
WE L 6 119 >
189 20.3
0.1 D
20.3
WE R 6 457 >
NB L 6 852 4.3
0.0 A
0.0
SB L 6 603 6.0
0.0 B
0.0
Intersection Delay =
1.5 sec/veh -
HCS: Unsignalized Intersections Release 2.1d BHPi5AT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N-S) BOARDWALK DRIVE _ (E-W) HIGH =POINT DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
other Information......... TOTAL TRAFFIC - YEAR 2015 - AM PEAK HOU
R
Two-way Stop -controlled Intersection
Northbound cI Southbound Eastbound ==Westbound= c
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- --- ----
No. Lanes 0 > 1 < 0 0 > 1 < 0 0 > 0 < 0 0 > 0 < 0
Stop/Yield N N
Volumes 15 595 5 5 330 45 5 2 5 5
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade
MC'S ($)
SU/RV's ($)
CV's ($)
PCE's
------------
0
1.10
--------------
1.10
--------------
1.10 1.10
---------------
Adjustment Factors
0
1.10 1.10
---------------
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
----------------------------------------- ---------------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsignalized Intersections Release 2.1d BHPISAT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WE EB
Conflicting Flows: (vph)
628
370
Potential Capacity: (pcph)
665
899
Movement Capacity: (pcph)
665
899
Prob. of Queue -Free State:
0.99
1.00
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
631
394
Potential Capacity: (pcph)
858
1113
Movement Capacity: (pcph)
858
1113
Prob. of Queue -Free State:
0.99
0.98
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
0.97
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1021
1022
Potential Capacity: (pcph)
271
271
Major LT, Minor TH
Impedance Factor:
0.97
0.97
Adjusted Impedance Factor:
0.97
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.96
0.96
Movement Capacity: (pcph)
----------------- -------------------------
261
-----------
259
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared Total
Queue
Approach
Rate
Cap
Cap Delay
Length
LOS Delay
Movement (pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
-------- ------
EB L 6
------
259
-------------
>
-------
--------------
EB
R
2
899 >
WE
L
6
261 >
WB
R
6
665 >
315
11.7
0.0 C
375
9.9
0.0 B
NB L 18 1113 3.3
SB L 6 858 4.2
Intersection Delay =
0.0 A
0.0 A
0.2 sec/veh
HCS: Unsignalized Inters-r.tionc r' Release _
- ... IC Paw
Center For- Mi(r-ocomputeri. III 1;'6 n s u c•r-t a t 1 orI
U n-i ver situ of Floc ida
50 Weil Hall
Gainesville, FL ;i 2611-2083
Ph: 500 3920176
Streets: IN-S) landings (t-W) iJoar-d vlB "I t.
Major- Street Direction.... EW
Length of Titti.= Analyzed... 60 (min)
Analyst.. . .. ....... mjo
Date of Analysis.......... 7 ;'sc/c7
tither Infor-mation........... 000 201.", am Qom bi<grnd total
IWo,ay -top-Control -led 1rterSeCt on
Eastbound 1 westbound - !" o thbound- I O ouinbound
I_ T P nL T R I L T F, L T F'
---- ---- _1__ ____ ____ ____ ____ __
No. Lanes. 1 1 0 , _ 0 Cl0 1 0 Ci
stop/Yield ; N
Volumes 170 485 1401 10= 400 115 1E0'
PHF .95 .05 .05 .95 .95 .95.; .95
Grade 0 0 0 0
Mc s
SU/RV's (q)I
r^CE`s 1.10 i. i0 1.10; 1.lo
-------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
______________________________________________________________.-___
Lett Turn Major
Rowe%
5 00
l0
RiGht Turn Miner
6oad
5.50
2.6D
Thr-ough Traffic
Minor Road
o_00
1 30
Left Turn Minor
roar
6.Sri
:.40
HCS: linsignalized intersections i<::leas._ 2.Sd -'age 2
Wow-ksneet for TW`,C intersection
---------------------------------------------------------
Step 1: RT from Minor �,tr-eet: NCB SE'.
conflicting Flows: (vph) 584 682
Potertial 701 625
Movement: Capacity: (pcph) 7101 625
F'rou. or Ouaue-Free State: 0.78 0.93
_.__________________________________._____________-----__-.
Step 2: Li from Major Street WP. EB
-----------------------------------------------------------
Con'f-r-icting Flows: (vph) 656 50,
Potential Capacity: (pcph) 833 676
Movarnent Capacity: (PcU ) 833 676
Prob. of Queue -Free State: 0.85 0.71
--------------------------------------------------------
intersection Performance Summary
Avg. 45q
Flow Move Shared Total Queue Approach
Rate Cap Gap Delay Length LOS Delay
Movement (peph) (ocph) (pcph)(sec/veh) (veil) ( sec iveil)
________ ______ ______ ______ ______________ _____ ________
6. _
Nc F: 151 7G"I 6.5 0.9 a
6.2
SB R. 4.;.1 6
E e. L. 117 E. 7 6 7. 5 i. 4 C. i. 6
WE, i 2 21 00.6 B 0.6
Intersection belay = 1.5 sec/Veil
HCS: Unsignal'ized Intersections Release 2-id Pace
Center- For Microcomputers in Tr-anspertatiorl -
University of Florida
51". Weil Hail
6ainesviile, FL 32611-2063
PI-1: (904) 392-0378
----------------------------
-, f ree t:s: (N-jl landings: (E-W) boardwalk
Major Si.reet Direction.... EW
Length of Time Ana Ivzed... Gil (min)
Anal vs t.................... in jd
irate. of Analysis..... .. 7/2 v; 97
Other Informat: ion --------- i000 'U1� 0111 On bk:Q r'r1 Ci 1:Otal
Two-way Stop -controlled intern ec i011
Eastbound WC_tb OUr'IJ N-.r-thh OUl'ICI Sout:hcound
L k 1 L T R L T F. L T e
____ ____ ____ ____ ___ ____ ____ ____i1__
No. Lanes 1 1 0I 1 1 < 0 0 0 1 0 G 1
Stoo/Yield N; N'1
Vol umes 35 _Ill 90 � 65 440 90i :,(I
PHF .95 ,95 9 5.95 .95 .95; .95'
r-.95
Uaoe 0 ; U U ll
MC's (%)
SUiR'J's
OV's
PCE's. I.10 1'ii.i0 1.101 1_IC
-----------------------------------------------------------------------
Adjustment Factor_.
Vehicle
Maneuver
------------------------------
Left Turn Major Road
Right 'Turn Minor Road
ThrOUgh Traffic Minor Road
Left 7urr1 Minor Road
hritiiai FOIIOw-uo
oa. (ig) Time
___________________`-__-__
=.00 10
5.56 2.60
G.00 30
6 .5u 3.4L'
HC_.: Ijns Tana l i s ed intersections Release id vap:•
WorksheeT for TWSC intersection
________________________________________________________
Steo 1: RT from Minor Street N6 SP
Conflicting Flows.
(vpi-1)
43p
510
Potential
Capacity:
(ocph)
t33
764
Movement
Caoacily:
(pcph)
B3d
764
t'r Ufi. Of
Oueue-rl-ee
sate:
0.9ti
0.95
-----------------------------------
_.tep L: LT
from Major
----------------------
Street
WE,
___________________________________________
Conflicting
Flows:
(voh)
----_----_Eb
484
558
Potential
Copacify:
(ocohi
1006
929
Movement
Capacity:
(pcph)
1008
929
Prob. Of
________________________________________________________
Queue -=see
`_Mate:
i0._;,
G.v6
intersection Performance Summary
Avg .
4 .ae
F iow
Move Shared Totai
l/Ucue
Aoproach
kale
cap Cap 0, l ay
Len 9 th LC
0e-1ay
Movement
________
(Pc Ph
______
(ocpn) (pcoh)(sec/veh) (veh)
______ ______ _______ _______ _____
(_._eu/venj
________
4.4
d,9
E. L
41
. 1
C..0 A,l1-_-
WE L
5
1U0t _ _
ll._ n
0.
intersection
Delay =
--1 SeC%veh
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 06-23-1997
Center For Microcomputers In Transportation
Streets (E-W)=BOARDWALK DRIVE (N-S) JFK=PARKWAY_______________
Analyst: RR File Name: BJFK15AT.HC9
Area Type: Other 6-23-97 AM
Comment: TOTAL TRAFFIC - YEAR 2015
= Eastbound Westbound = Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1< 1 1< 1 2 1 1 2<
Volumes 15 240 10 15 365 90 55 50 45 155 25 45
Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * NB Left
Thru * Thru
Right * Right
Peds Peds
WE Left * SB Left
Thru * Thru
Right * Right
Peds Peds
NB Right EB Right
SB Right WE Right
Green 33.OP Green 17.OP
Yellow/AR 5.0 Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: #1 #5
---------------------------------------------------- ----------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ----------- ----- ----- ----- --- ----- ---
EB L 241 414 0.066 0.583 4.1 A 4.6 A
TR 1080 1851 0.245 0.583 4.6 A
WB L 526 902 0.030 0.583 4.0 A 5.7 B
TR 1056 1810 0.474 0.583 5.7 B
NB L 467 1476 0.124 0.317 11.1 B 11.0 B
T 1180 3725 0.047 0.317 10.8 B
R 501 1583 0.094 0.317 11.0 B
SB L 490 1547 0.333 0.317 12.1 B 11.7 B
TR 1066 3366 0.072 0.317 10.9 B
Intersection Delay - 7.3 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.424
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 06-23-1997
-Center For Microcomputers In Transportation
Streets (E W) BOARDWALK DRIVE (N-S) JFK PARKWAY
Analyst: RR File Name: BJFK15PT.HC9
Area Type: Other 6-23-97 PM
Comment: TOTAL TRAFFIC - YEAR 2015
Eastbound Westbound Northbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 < 1 1 < 1 2 1 1 2 <
Volumes 70 515 40 80 435 190 270 195 105 275 140 115
Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
---------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * NB Left
Thru * Thru
Right * Right
Peds Peds
WE Left * SB Left
Thru * Thru
Right * Right
Peds Peds
NB Right EB Right
SB Right WE Right
Green 30.OP Green 20.OP
Yellow/AR 5.0 Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: #1 #5
---------------------- ---------------- ------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Can Flow Ratio Ratio Delay LOS Delay LOS
----- ----------- ----- ----- ----- --- ----- ---
EB L 124 233 0.595 0.533 12.5 B 8.5 B
TR 983 1843 0.594 0.533 6.0 B
WE L 148 277 0.569 0.533 10.8 B 9.6 B
TR 948 1778 0.694 0.533 9.4 B
NB L 367 1001 0.774 0.367 19.5 C 14.3 B
T 1366 3725 0.157 0.367 9.7 B
R 580 1583 0.191 0.367 9.9 B
SB L 415 1132 0.696 0.367 15.8 C 12.9 B
TR 1273 3473 0.221 0.367 10.0 B
Intersection Delay = 11.2 sec/veh Intersection LOS = B
Lost Time/Cycle, L - 6.0 sec Critical v/c(x) = 0.726
-----------------------------------------------------------------------
APPENDIX G
HCS: Unsignalized Intersections Release 2.1d
Paae 1
HCS: Unsignalized Intersections Release 2.1d
Page 2
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Worksheet for TWSC Intersection
Gainesville, FL 32611-2083
--------------------------------------------------------
Ph: (904) 392-0378
Step 1: RT from Minor Street WB
________________________________________________________
EB
Streets: (N-S) boardwalk
(E-W) troutman
Conflicting Flows: (vph)
561
Major Street Direction.... NS
Potential Capacity: (pcph)
720
Length of Time Analyzed... 60 (min)
Movement Capacity: (pcph)
720
Analyst ................... mjd
Prob. of Queue -Free State:
0.63
Date of Analysis.......... 8/l/97
________________________________________________________
Other Information......... background year 2015
pm
Step 2: LT from Major Street SB
NB
Two-way Stop -controlled Intersection
--------------------------------------------------------
____________
Conflicting Flows: (vph)
569
Northbound Southbound Eastbound
Westbound
Potential Capacity: (pcph)
918
L T R L T R i L
T R
L T R
Movement Capacity: (pcph)
918
---- ---- -------- ------------
--------
---- ---- ----
Prob. of Queue -Free State:
0.85
No. Lanes 1 1 0 0 1 < 0 1
0 1 1
0 0 0
________________________________________________________
Stop/Yield N� N:
Step 4: LT from Minor Street WB
EB
Volumes 120 665 525 15: 25
230:
--------------------------------------------------------
PHF .95 .95 .95 .95: .95
.95:
Conflicting Flows: (vph)
1387
Grade 0 t 0
0
Potential Capacity: (pcph)
167
MC's (%)
Major LT, Minor TH
SU/RV's ($)I
Impedance Factor:
0.85
CV's ($)
i
Adjusted Impedance Factor:
0.85
PCE's 11.10 I1.10
1.101
Capacity Adjustment Factor
______________________________________—_______-_—_-__________—______
due to Impeding Movements
0.85
Movement Capacity: (pcph)
--------------------------------------------------------
142
Adjustment Factors
Intersection Performance Summary
Vehicle Critical
Follow-up
Avg. 95%
Maneuver Gap (tg)
Time (tf)
Flow Move Shared Total Queue
Approach
--------------------------------------------------------------
Rate Cap Cap Delay Length LOS
Delay
Left Turn Major Road 5.00
2.10
Movement (pcph) (pcph) (pcph)(sec/veh) (van)
(sec/veh)
Right Turn Minor Road 5.50
2.60
-------- ------ ------ -------------------- -----
---------
Through Traffic Minor Road 6.00
3.30
EB L 29 142 31.6 0.8 E
Left Turn Minor Road 6.50
3.40
10.3
EB R 266 720 7.9 2.0 B
NB L 139 918 4.6 0.6 A
0.7
Intersection Delay = 2.0 sec/veh
HCS: Unsignalized Intersections Release 2.1d BT15A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N-S) BOARDWALK(E-W) TROUTMAN=====______
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
Other Information......... BACKGROUND TRAFFIC - YEAR 2015 - AM PEA
K HOUR
Two-way Stop -controlled Intersection
Northbound Southbound =Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 0 0 1 < 0 1 0 1 0 0 0
Stop/Yield N N
Volumes 45 555 315 10 10 50
PHF .95 .95 .95 .95 .95 .95
Grade
MCI M
SU/RV's (16)
CV's M
PCE's
0
i.10
0 0
11.10 1.101
--------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (t`-)
-------------
-------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d BT15A.HC0 Page 2
Worksheet for TWSC Intersection
------------------------------------- ------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
338
Potential Capacity:
(pcph)
933
Movement Capacity:
(pcph)
933
Prob. of Queue -Free
State:
0.94
--------------------------------------------------------
Step 2: LT from Major Street
SB NB
--------------------------------------------------------
Conflicting Flows:
(vph)
343
Potential Capacity:
(pcph)
1177
Movement Capacity:
(pcph)
1177
Prob. of Queue -Free
State:
0.96
--------------------------------------------------------
Step 4: LT from Minor
Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
968
Potential Capacity:
(pcph)
291
Major LT, Minor TH
Impedance Factor:
0.96
Adjusted Impedance
Factor:
0.96
Capacity Adjustment
Factor
due to Impeding Movements
0.96
Movement Capacity:
- ----------------------------------------------------
(pcph)
278
Intersection Performance Summary
Avg. 954
Flow Move Shared Total Queue Approach
Rate Can Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
------- ----- ------ ----- ------- ------- ---- ---------
EB L 12 278 13.5 0.0 C
5.7
EB R 58 933 4.1
NB L 52 1177 3.2
Intersection Delay =
0.1 A
0.0 A 0.2
0.5 sec/veh
Page HCS: Unsignalized Interee=tions-_ Release_2.1d ==_ BHPISA.HCOP4e 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N-S)6BOARDWALK DRIVE (E-W)cHIGH POINT DRIVE c
Major Street Direction.... NS
Length of Time Analyzed... 660 (min)
Analyst ..................
Date of Analysis.......... 6/20/97
Other Information......... BACKGROUND TRAFFIC - YEAR 2015 - AM PEA
Two-way Stop -controlled Intersection
_= Northbound Southbound I Eastbound westbound
L T R L T R L T R L T R
____ ____ ____ ____
---- ---- ----
____
---- ---- ---- ----
No. Lanes 0 1 < 0 0 > 1 0 0 0 0 0 > 0 < 0
Stop/Yield N
Volumes 590 5
PHF .95 .95
Grade 0
MC's l%)
SU/RV's (%)
CV's (%)
PCE's
---------
5 310
95 .95
0
5 5
95 .95
0
1.10 I I1.10 1.10
_____________________________________________
Adjustment Factors
Critical
Follow -UP
Vehicle
Gap (tg)
Time (tf)
Maneuver
-------------------------
-----------------------------------------
LeftTurn Major
Road
5.00
2.10
2.60
Right Turn Minor
Road
5.50
6.00
3.30
Through Traffic
Minor Road
3.40
Left Turn Minor
Road
6.50
HCS:=Unsignalized= Intersections
-=-Release -2.1d==a=BHPISA=HC06---- Page -2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
624
Potential Capacity: (pcph)
669
Movement Capacity: (pcph)
669
Prob. of Queue -Free State:
0.99
--------------------------------------------------------
Step 2: LT from Major Street
SE
NB
Conflicting Flows: (vph)
626
Potential capacity: (pcph)
863
Movement Capacity: (pcph)
863
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
WE
EB
________________________________________________________
Conflicting Flows: (vph)
954
Potential Capacity: (pcph)
297
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
------------------------------------------------
294
-------
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
------ ------ -------
(veh)
-- ---- -----
(sec/veh)
---------
-------- ------
WB L 6 294 >
408 9.1
0.0 B
9.1
WB R 6 669 >
SB L 6 863 4.2
0.0 A
0.1
Intersection Delay =
0.1 sec/veh
HCS: Unsignal ized IntcrseQtions Relaase t.td Paq,_
Cer, ter ror Microcomputers In T ransportatiOl',
Lin ivc'rs itV of r- for Ioa
51i Weil Hall
Gainesville, FL %261'1-2063
P I'.: (904) 592-0376
Streets: (N-S) landings (E-W) boardwalk
Major Street Direction.... EW
Length of Ti me Analyzed... 6ii iminj
Anaivst................... mjd
Date of Analysis..........
Other information......... 2000 gulp am u_°J�� total
Two-way Stop -control ied intars u�,ol,
Eastbound Westbound Northbound Sauthbound
L T k I_ T k L 1 R L T fi
No. L.anes 1 1 0 1< 0 li 0 1 0 0-- -I--
Stop/Yield N; R
Volumes 170 470 140: iu5 - SGul i30j
PHF .95 95 .95 -95 a9j .95
9j
Grade 0
MC'
SLI/RV's (NJ�
CV'z (q)
PCE's ;1.10 11.10 i 1 10; i.10
------------------------------------ ---- -------------- --------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
__________________________________________________________________
b'ap (tp)
Time (tf}
Left Turn Major
Road
5.00
_.10
P,ignt Turn Mincer
koad
j.5c,
2.60
Through Traffic
Minor koad
6.00
1 .50
Left Turn Minor
koaci
6.5G
c.40
H f., �: lh�s.�nnal"i zed Interse,:t.ions Release L.Id face 2
Worksheet for TW6C intersection
Stec 1: P.i from Minor Stre-et NB SE
Confl llct:ing Flows: (vpVl) j66 656
i'otantial Ca rarity: (pcph) 774 64A
Movement. Capacity: locph) 714 643
Frob. of Oueua-Fr_e State: 0.79 0.94
____________ `EE
_______________
Step-__Trrom---- jtreet W
--_
Conflicting Flows: (vph) 642 616
PotentialCapacity: (pcph) 643 700
Movement CapaciiV: (pcph) 646 700
Prob. of Or.r e,.re-F g ee Si:ate. 6.66 0. 72
--------------------------------------------------------
intersection Performance Summary
Avg. 95't
Flow Move Snared Total Queue Approach
irate Gap Cap belay Lerro t, Lu5 Delay
M ov ernent (pcpn) (pcPnI (pcph)(sec/`vehj (veh) (sec/veh)
-------- ------ ------ ------ ------- ------- ----- ---------
6.4
Nb !{ Iji I4 6.4 0,9 E,
D .11
S5 P. 4'i 6dg G.li G.i E
EE. L i97 700 '.2
n tersection Delay = 1.= scciveh
HCS: Uns'ignalizea intersections. Release ..Id rage
Cer,Ler For Microcompu[erslr, lransr, c+r to t'i orl
University of Florida
512 Wr_ i'I Hall
G�, inesvi I le, FL 52611-2083
Ph: (904) 392-0 76
Streets .: (N-S) landings (E-W) nnarowa lk.
Major- Street Cii rection.... EW
Length of Time Anmlyzed... 60 (min)
Ana vsi.. . ... . . . .... Ill Id
Date of Analysis......... /[4/97
Cltner Information...... ..2000 nii; am pm bF:grna total
Two-wa Stop -controlled in'tersec Lion
Eastbound______ Westbound___ Nort.hbound__
Soutliuound
L. T R L T R , L T R ! L T F;
l____ ____ ____l____ _ ____l____ ____
No. Lanes 1 1 0 1 1 < 0 0 it 1 0 it
stop/Yield NI N�
Volumes 35 105 901 65 485 90; 5; 30
PHF .95 .95 .95; .95 ,95 .96; .95i .SS
C;rade 0 0 0 O
Mi, (A)
SUiR'V's (%)
CV' . Q)
PCE's 0 i. lily i.10
_______________________________________________________________________
Adjustment Factors
ve.nic le
Critical
Fol1Ow-up
Maneuver
____________J_
Gao (ig)
Time (tf)
Left Turn Major
_________________________
Road
____________________
5. Ull
.Ill
Right turn Minor-
Road
S.50
0.60
Thl-ough Traffic
Minor Road
6.00
5.10
Left Turn Minor
Road
6.5J
z.40
HCS: fins-ignali-ed iniersections
Release _.Id
'rage 2
ViQrV:: ,'J'1?et, for 1WJ;, inter'sectlon
---------------------------------------------------------
.-tep I: R1 from Minor Street
----------------------------------------
Nis
Sn
Conflicting Plows: (vph)
;, 6,3
_
506
Rotential Capacity: (pcph)
901
767
Movement Capacity: (pcph)
901
76
r,rob. c* Oueue-ri.. ee :,tatE:
_.__.__.___.._________________________.__-__..__________.______
0.9a
0.95
SLell 2: ILT from Ms-ior street
WF
Ec
Conflicting mows: (vpl-l)
416
55
Fot:entiall Capacity: (pcph)
1086
9,14
Movement Capacity: (pcphi
106E
934
Proo. of Oue;.le.-Free L+Late:
________________________________________________________
i1.9'3
0 96
intersection
Performance Summary
Avg- 9.5%
Flaw Move Shared
Total Oueue
Apornach
Rate Cap cap
De la•; Length LOS;
Delay
Movement (pcph) (peph) (pcph)(sec/veh)
(veh)
____
(sec(veh)
_________
4.0
N5 R 6 901
SS k K 767 4.
EE L a 934
WS L 75 106u S.6
intersection Delay
4.9
0 . c.
0.4
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 06-23-1997
Center For Microcomputers In Transportation
Streets (E-W) BOARDWALK DRIVE= (N-S) JFK PARKWAY =
Analyst: RR File Name: BJFK15A.HC9
Area Type: Other 6-23-97 AM
Comment: BACKGROUND TRAFFIC - YEAR 2015
= Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 < 1 1 < 1 2 1 1 2 <
Volumes 15 210 10 15 380 90 55 50 45 125 25 45
Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
----------------------- - ---------------------------------------- --
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * NB Left
Thru * Thru
Right * Right
Peds Peas
WE Left * SB Left
Thru * Thru
Right * Right
Peds Peds
NB Right EB Right
SB Right WB Right
Green 33.OP Green 17.OP
Yellow/AR 5.0 Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
-- -- ---- ----- - ----- ----- ---- --- ----- ---
EB L 246 422 0.065 0.583 4.1 A 4.5 A
TR 1079 1849 0.215 0.583 4.5 A
WB L 578 990 0.028 0.583 4.0 A 5.7 B
TR 1055 1809 0.469 0.583 5.7 B
NB L 467 1476 0.124 0.317 11.1 B 11.0 B
T 1180 3725 0.047 0.317 10.8 B
R 501 1583 0.094 0.317 11.0 B
SB L 490 1547 0.269 0.317 11.7 B 11.4 B
TR 1066 3366 0.072 0.317 10.9 B
Intersection Delay = 7.2 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.399
-------------- - -- --------------------------------- - ----------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 06-23-1997
Center For Microcomputers Ih Transportation
Streets (E-W)=BOARDWALK DRIVE _ (N-S) JFK PARKWAY =
Analyst: RR File Name: BJFKISP.HC9
Area Type: Other 6-23-97 PM
Comment: BACKGROUND TRAFFIC - YEAR 2015
Eastbound westbound = Northbound =Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1< 1 1< 1 2 1 1 2<
Volumes 70 510 40 80 405 175 270 195 105 265 140 115
Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
--------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * NB Left
Thru * Thru
Right * Right
Peds Peds
WB Left * SB Left
Thru * Thru
Right * Right
Peds Peds
NB Right EB Right
SB Right WE Right
Green 30.OP Green 20.OP
Yellow/AR 5.0 Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat V/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- - --- ----- --- - --- ---
EB L 129 241 0.576 0.533 11.6 B 8.4 B
TR 982 1842 0.589 0.533 7.9 B
WE L 150 282 0.559 0.533 10.5 B 8.8 B
TR 948 1778 0.643 0.533 8.6 B
NB L 367 1001 0.774 0.367 19.5 C 14.3 B
T 1366 3725 0.157 0.367 9.7 B
R 580 1583 0.191 0.367 9.9 B
SB L 415 1132 0.672 0.367 15.1 C 12.5 B
TR 1273 3473 0.221 0.367 10.0 B
Intersection Delay = 10.9 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.696
-----------------------------------------------------------------
VINE :
HCS: Unsignalized Intersections Release 2.1d BADOOPT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N-S) BOARDWALK (E-W) ACCESS DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
Other Information......... TOTAL TRAFFIC - YEAR 2000 - PM PEAK HOU
R
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- --- - -- --- ---- ---- ----
No. Lanes 0 > 1 0 0 1 < 0 0 > 0 < 0 0 0 0
Stop/Yield N N
Volumes 5 555 450 5 20 25
PHF .95 .95 .95 .95 .95 .95
Grade 0 0 0
MC,s W
SU/RV's (g)
CVIa M
PCEIa
1.10
.--------------
1.10 1.10
--------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
----------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d
BADOOPT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
476
Potential Capacity: (pcph)
795
Movement Capacity: (pcph)
795
?rob. of Queue -Free State:
0.96
--------------------------------------------------------
Step 2: LT from Major Street SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
479
Potential Capacity: (pcph)
1014
Movement Capacity: (pcph)
1014
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street WE
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1066
Potential Capacity: (pcph)
256
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
---------------------------------------------------
254
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue
Approach
Rate Cap Cap Delay Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
- -----
(sec/veh)
- -----
-------- --- -- ------ ------ -------
EB L 23 254 >
409 10.1 0.4
C 10.1
EB R 29 795 >
NB L 6 1014 3.6
Intersection Delay =
0.0 A 0.0
0.4 sec/veh
HCS: Unsignalized Intersections Release 2.1d BADOOAT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2063
Ph: (904) 392-0378
Streets (N S) BOARDWALK a (E-W) ACCESS DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
other Information......... TOTAL TRAFFIC - YEAR 2000 - AM PEAK HOD
R
Two-way Stop -controlled Intersection
= c Northbound= Southbound Eastbound Westbound
L T R L T R L T R L T R
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ----
No. Lanes 0 > 1 0 0 1 < 0 0 > 0 < 0 0 0 0
Stop/Yield N N
Volumes 30 470 260 20 5 5
PHF .95 .95 .95 .95 .95 .95
Grade
MC,s (%)
SU/RV's W
CV,s W
PCE's
0
1.10
---------------
0
---------------
1.10 1.10
.--------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap
(tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections -Release 2.1d BADOOAT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WE EB
Conflicting Flows: (vph)
284
Potential Capacity: (pcph)
994
Movement Capacity: (pcph)
994
Prob. of Queue -Free State:
0.99
--------------------------------------------------------
Step 2: LT from Major Street SB
NB
_______________________________ __-___-_--_______-
Conflicting Flows: (vph)
295
Potential Capacity: (pcph)
1240
Movement Capacity: (pcph)
1240
Prob. of Queue -Free State:
0.97
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.96
--------------------------------------------------------
Step 4: LT from Minor Street WE
EB
--------------------------------------------------------
Conflicting Flows: (vph)
812
Potential Capacity: (pcph)
359
Major LT, Minor TH
Impedance Factor:
0.96
Adjusted Impedance Factor:
0.96
Capacity Adjustment Factor
due to Impeding Movements
0.96
Movement Capacity: (pcph)
--------------------------------------------------
345
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
-------- ------ ------ ------ ------- ------- ----- ---------
EB L 6 345 >
512 7.2 0.0 B 7.2
EB R 6 994 >
NB L 35 1240 3.0 0.0 A 0.2
Intersection Delay = 0.2 sec/veh
HCS: Unsignalized Intersections Release 2.1d BTOOPT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) BOARDWALK (E-W) TROUTMAN
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
other Information......... TOTAL TRAFFIC - YEAR 2000 - PM PEAK HOU
R
Two-way Stop -controlled Intersection
= I=LNorthboundd LSouthboundd I=LEastboundR LWestboundR
No. Lanes 1 1 0 0 1 < 0 1 0 1 0 0 0
Stop/Yield N N
Volumes 95 535 450 25 20 185
PHF .95 .95 .95 .95 .95 .95
Grade
MC's (%)
SU/RV's (%)
CV's M
PCE's
0
1.10
-------------
0
---------------
0
1.10 1.10
-------------
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsignalized Intersections Release 2.1d BTOOPT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
487
Potential Capacity: (pcph)
784
Movement Capacity: (pcph)
784
Prob. of Queue -Free State:
0.73
--------------------------------------------------------
Step 2: LT from Major Street
--------------------------------------------------------
SB
NB
Conflicting Flows: (vph)
500
Potential Capacity: (pcph)
990
Movement Capacity: (pcph)
990
Prob. of Queue -Free State:
--------------------------------------------------------
0.89
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
1150
Potential Capacity: (pcph)
229
Major LT, Minor TH
Impedance Factor:
0.89
Adjusted Impedance Factor:
0.89
Capacity Adjustment Factor
due to Impeding Movements
0.89
Movement Capacity: (pcph)
---------------------------------- --------------------
204
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
-------- ------ ------ ------
(veh)
(sec/veh)
-------
EB L 23 204 19.9
------- -----
0.4 C
---------
7.6
EB R 215 784 6.3
1.3 B
NB L 110 990 4.1
0.4 A
0.6
Intersection Delay =
1.5 sec/veh
HCS: Unsignalized Intersections Release 2.1d BTOOAT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets:=(N-S) BOARDWALK (E W) TROUTMAN=====______
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
Other Information......... TOTAL TRAFFIC - YEAR 2000 - AM PEAK HOU
R
Two-way Stop -controlled Intersection
= Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____
No. Lanes 1 1 0 0 1 c 0 1 0 1 0 0 0
Stop/Yield N N
Volumes 35 475 255 10 20 40
PHF .95 .95 .95 .95 .95 .95
Grade
MC,a (%)
SU/RV's (%)
CV,s (%)
PCEIs
0
1.10
----------- ---
0
L______________
0
1.10 1.10
---------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
-------- ---------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS==Unsignalized-Intersections-=-Release-2.ld---_BTOOAT=HCO__---Page-2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WE EB
------------------------------------- ___________________
Conflicting Flows: (vph) 274
Potential Capacity: (pcph) 1006
Movement Capacity: (pcph) 1006
Prob. of Queue -Free State: 0.95
--------------------------------------------------------
Step 2: LT from Major Street SB NB
--------------------------------------------------------
Conflicting Flows: (vph) 279
Potential Capacity: (pcph) 1262
Movement Capacity: (pcph) 1262
Prob. of Queue -Free State: 0.97
-------------------------------------- __________________
Step 4: LT from Minor Street WE EB
_____________________________________________________
Conflicting Flows: (vph) 810
Potential Capacity: (pcph) 360
Major LT, Minor TH
Impedance Factor: 0.97
Adjusted Impedance Factor: 0.97
Capacity Adjustment Factor
due to Impeding Movements 0.97
Movement Capacity: (pcph) 348
-----------------
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
----- ------ ------ ----- --------
EB L 23 348 11.1 0.1 C 6.2
EB R 46 1006 3.7 0.0 A
NB L 41 1262 2.9 0.0 A 0.2
Intersection Delay = 0.6 sec/veh
HCS: Unsignalized Intersections Release 2.1d BHPOOPT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N-S) BOARDWALK =DRIVE (E W) HIGH =POINT DRIVE=
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
Other Information......... TOTAL TRAFFIC - YEAR 2000 - PM PEAK HOU
R
Two-way Stop -controlled Intersection
=cNorthbound a Southbound Eastboundc westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- --- ---- ---- - -- ---- ----
No. Lanes 0 > 1 c 0 0 > 1 c 0 0 > 0 c 0 0 > 0 c 0
Stop/Yield N N
Volumes 5 725 5 5 480 10 40 15 5 5
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0 0
MCI (8)
SU/RV's W
CVIs W
PCEIa
1.10
'--------------
1.10
------- - -----
-
---------------
1.20 1.10
Adjustment Factors
1.10 1.10
'--------------
vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
-- --- ------------------------------------------------------ ----
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsignalized Intersections Release 2.1d
BHPOOPT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
------ --------------------------------
WB
EB
----------------
Conflicting Flows: (vph)
766
510
Potential Capacity: (pcph)
567
764
Movement Capacity: (pcph)
567
764
Prob. of Queue -Free State:
0.99
0.98
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
768
516
Potential Capacity: (pcph)
738
973
Movement Capacity: (pcph)
738
973
Prob. of Queue -Free State:
0.99
0.99
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1294
1288
Potential Capacity: (pcph)
189
190
Major LT, Minor TH
Impedance Factor:
0.98
0.98
Adjusted Impedance Factor:
0.98
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.95
0.97
Movement Capacity: (pcph)
--------------------------------------------------------
180
184
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
--------------
-------- ------ ------ -------------
EB L 46 184 >
-------
234 21.2
1.2
D 21.2
EB R 18 764 >
WB L 6 180 >
273 13.8
0.0
C 13.8
WB R 6 567 >
NB L 6 973 3.7
0.0
A 0.0
SB L 6 738 4.9
0.0
A 0.0
' Intersection Delay =
1.0 sec/veh
HCS: Unsignalized Intersections Release 2.1d BHPOOAT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) BOARDWALKDRIVE= c = (E W)=HIGH POINT DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
Other Information......... TOTAL TRAFFIC - YEAR 2000 - AM PEAK HOU
R
Two-way Stop -controlled Intersection
Northbound Southbound = ==Eastbound Westbound =
-L- T R -L- T R L T R -L- T R
-- - - - - ---- ---- ---- ---- ---- ---- ----
No. Lanes 0 > 1 < 0 0 > 1 < 0 0 > 0 < 0 0 > 0 < 0
Stop/Yield N N
Volumes 15 475 5 5 270 45 5 2 5 5
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade
MCI (%)
SU/RV's l%)
CV's (%)
PCE's
------------
0
1.10
---------------
1.10
----------------
1.10 1.10
---------------
Adjustment Factors
0
1.10 1.10
--------------
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
----------------------------------------- -- - -----------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsignalized=Intersections
=-_Release
_2.1d---=BHPOOAT_H=O--=-
Page -2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
WB
EB
---------------------------------------------------
Conflicting Flows: (vph)
502
308
967
Potential Capacity: (pcph)
771
967
Movement Capacity: (pcph)
771
1.00
Prob. of Queue -Free State:
0.99
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
505
331
Potential Capacity: (pcph)
985
1192
Movement Capacity: (pcph)
985
1192
0.98
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
0.98
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
________________________________________________________
Conflicting Flows: (vph)
832
834
Potential Capacity: (pcph)
349
348
Major LT, Minor TH
0.97
0.97
Impedance Factor:
0.97
Adjusted Impedance Factor:
0.97
Capacity Adjustment Factor
0.96
due to Impeding Movements
0.97
Movement Capacity: (pcph)
--------------------------------------------------------
338
335
Intersection Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
______ ______ _______ _______
(sec/veh)
---------
________ ______
EB L 6 335 >
400
9.2 0.0
B 9.2
EB R 2 967 >
WE L 6 338 >
470
7.9 0.0
B 7.9
WB R 6 771 >
NB L 18 1192
3.1 0.0
A 0.1
SB L 6 985
3.7 0.0
A 0.1
Intersection Delay
= 0.2 sec/veh
HC6: Lin i anal i¢ed i n t_;'sect i on!, Hel-ase .. it, Paq
Center or Mic'-.,computer_ in
Lin iversity F lorlOc
51; weil Mall
1>;,3 i nesv ill.;, FL J28II-; GiiS
3tr er'L z'- (iv land ings i,F r.� I. <' cj n
M,, j o r [Z1:reet'. Oire.'t ion.... LW
i_en_gtil of T 1 we Anc• -zed ... 61i :ruinY
Aria 1 vst. . . . . . . . . . . . Il'I fn
Otle; lnr,rmaLior, k-II aI., pm C,'arnd �tol
WC -rrcY Stop-C,lnir'ol lcd IrIL_r _ �?-lop
E as L6i LP"rd Wes i0"unG Nor t h 6 Uun ri SOU thb..Lind
L T P, L T
____ ____ ____ I
No. Lanes ! u 11 u 0 0 1 iCi C.
JtUp%'r I ld
Vnl Limes 15= .,_= 1IC, o[i 4% 105; SCI
p hlF .95 .95 .951 ._6_95i .�.,
tirade 0 u 0
Ic s Cm)
51.1'RV 's %)j
l'.V'9'(R+J
F'(',F I1_10 i.10
Ad.ioatment �ccLors
Vehicle
Critic& -I
Foi Tow-uc
Ntaneuver
________________________J_UV________
ban (t5)
Time (tf)
_ Tarr, jr
Left TurMa .
Ft Cad
- '
i
Richt Turn Minor-
Through Traffic
iMiin•.;r icon.^,
;.Liu
.Sri
L e f L TUrI I'li(Ior'
KC>a
H r. c, 15 icnn l-iCc_ inters._c t i ons n�lcnsc iP;;qe <
Wor i:. on ee t: for TW;C in ter sc-cIL on
JL
.sa is RT from Minor bir-eet N ,°.
Lon ii1 7: y r'll:rwr=: LVan) 474 S�r1
F'.�iel'I t'lel \, a p aiit\': Lp�`p111 79C %(li
Movement 1, a4+dCit.y: (pcn) 79U 7!1
1'I'oL, Of uo eu e-r re_ :•Lb tc+:
E,trp L I f roa ha , .' tr bet. WE) Ci
__________ _______ _ ____________ _j`_ __._
Cnni -i i c t inu Flows: cvph) 5'-
FotenLial Capacity: (pcph) 956 752
Fiovemenl Capacity' (pc'ph,, 956 !6;
Prob. of Oueue-Free Mate: 0.90 0.80
________________________________________________________
intersection Performance 3ummar-y
Avg 95I
F1,DW Move r`.hared Total CWc'Ue Approach
Rate Car, Cap Delay Lenctl-I LOS Delay
Movement. 1pcpn (P-11) (pcph) lsec jvr:h) (veil ) ( sec/ veil
_ _____
5 S
796 5. u.6 EI
1.4
5.4 U.rl C.
EE. L 15�; 782 5.7 u.b - i.-
Wc L 96 966 c_�
Intersection Delay = 1.2 sec:ivei
HCS: une.i pn-,l i=e•_'' inters.e.:O ons kelease is A,
Cen7.er rr-r hh cro omputers in iransf.'orta;ion
inivers,ty of Florid-
Gainesville, FL 321511-200
Ph: i904) Sy:-037E
landings (F-wr
Major Street i.lirect.inn.... Ew
Length o'r lime Ana'i zed... bC! (m'irii
alldlya i................. ... m,ld
iJal Arlh iy ...
1.11-i1'r information". :l!l.li YGi5 pni I)i.:.yrnd Ltnt=,l
Two' -way =too-ronTrol) eri 1 n t e'r°'r•Ct iof,
Eastbound Westbound_ I Nortnuomw 1 boutnbounrd
L. T R L T R ; L. T P i_ T�.
____ ____ ____i____ _ - ___ ----
No. Lanes i 1 u 1 1 G 0 0 C
Stop/Yield y IJ
volumes 25 320 70 55 355 iY
PHr 1 95 .95 .9595 95 95 __ 95
Vracte V U 11 C!
MUS l ` 1
WS A)
RCc's. ;1"i0 0 i. i01 1.10
-----------------------------------------------------------------------
AdiustItlent raCtorS
venl-cIa
orrti
cal
r?I low -up
Maneuver
----------------------------------------------------------------
(Geri
(Q)
Time AT)
Left Turn ma Ior
Koad
...00
-13
Rigni Tuni W nor
Road
C.A
2 60
ihrounn Traffic
Minor Road
6.00
;..0
Left Tura f1; wr
knad
6..,_
_.Al'
W <'1 GneC: ff, iWS. intersection
---------------------------------------------------------
_tar 1" FJ from Mirror :tract: Ne' S„
i.onfli.:Liny Flows: ,vpn' 174 414
F ;;tentia. Capaci locn;, 825 5?-
Mr/enl::nt' .pcph) 895 854
r. ..J. C.- Clueuo�F I'e& y1..a L
Stec L! from 1i-,i.' Sr _ WE 1..,
it onf 11 ct i ng F ow F r vphl 411 45'[.
Potential CapaCiry' Upcpii) 1092 104
Flovement 1, a;J a i C':: (ocpl'I! Ill`;! 104
Pr on, of l,ruelt-.Free t'ta te: 0,94 _._-
---------------------------------------------------------
intar_.=_tion Perforrnaoce �immary
F low move z+nared I or I Oueue Anoroacn
Kate Cap Cap Delay Length LC!S Vela.
Movement. {per r') k p ; p h ) 1pcphjlsecivenj (van) Lsecvvenj
________ ______ ______ ______ ------- _______ _____ ---------
4
NA R 6 B 0 4.0 0. 0 F.
4.4
SE
Ee. L 29 A9. �.c 0.0 A 0.2
WE L 64 1092 0.1 A C.4
intersection Delay = 0.4 sec/ven
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 06-23-1997
Center For Microcomputers In Transportation
Streets: (E-W) BOARDWALK DRIVE
(N-S) JFK PARKWAY
Analyst: RR
File Name: BJFKOOAT.HC9
Area Type:
Other
6-23-97 AM
Comment: TOTAL TRAFFIC - YEAR 2000
Eastbound
westbound
= Northbound
Southbound
L
---- ----
T R
----
L T
R
L T R
L T
R
No. Lanes
1
1<
---- ----
1 1<
----
---- ---- ----
1 2 1
---- ---- ----
1 2<
Volumes
15
195 10
15 305
70
50 40 35
140 20
35
Lane W (ft)
12.0 12.0
12.0 12.0
12.0 12.0 12.0
12.0 12.0
RTOR Vols
0
0
0
0
Lost Time
----------------------------------------------------------------------
3.00 3.00
3.00
3.00 3.00
3.00
3.00 3.00 3.00
3.00 3.00 3.00
Signal Operations
Phase Combination
1 2
3 4
5 6 7
8
EB Left
*
NB Left
Thru
*
Thru +
Right
*
Right
Peds
Peds
WB Left
*
SB Left
Thru
+
Thru
Right
*
Right
Peds
Peds
NB Right
EB Right
SB Right
WE Right
Green
33.OP
Green 17.OP
Yellow/AR
5.0
Yellow/AR 5.0
Cycle Length:
-----------------------------------------------------------------------
60
secs Phase combination
order: #1 #5
Intersection Performance Summary
Lane
Group:
Adj Sat
V/c
g/C Approach:
Mvmts
-----
Cap
----
Flow
- -----
Ratio
Ratio Delay LOS Delay LOS
EB L
373
640
-----
0.043
----- ---- --- ----
0.583 4.1 A 4.5
---
A
TR
1079
1849
0.200
0.583 4.5 A
WB L
606
1039
0.026
0.583 4.0 A 5.1
B
TR
1056
1810
0.374
0.583 5.2 B
NB L
484
1530
0.109
0.317 11.0 B 10.9
B
T
1180
3725
0.037
0.317 10.8 B
R
501
1583
0.074
0.317 10.9 B
SB L
504
1591
0.292
0.317 11.8 B 11.5
B
TR
1067
3369
0.057
0.317 10.8 B
Intersection
Delay =
7.1 sec/veh Intersection LOS =
B
Lost Time/Cycle, L
-----------------------------------------------------------------------
= 6.0
sec Critical v/c(x) = 0.345
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4d
06-23-1997
Center For Microcomputers
In Transportation
Streets (E-W)
BOARDWALK DRIVE
(N-S) JFK PARKWAY
Analyst: RR
File Name: BJFKOOPT.HC9
Area Type:
Other
6-23-97 PM
Comment: TOTAL TRAFFIC - YEAR 2000
Eastbound westbound
=Northbound
Southbound
L T R L T
R L T R
L T R
---- ----
No. Lanes
---- ---- ---- ---- ----
1 1< 1 1<
---- ---- ---- ----
1 2 1
----
1 2<
Volumes
60 415 35 65 355
155 215 155
85
225 115
90
Lane W (ft)
12.0 12.0 12.0 12.0
12.0 12.0 12.0
12.0 12.0
RTOR Vols
0
0
0
0
Lost Time
3.00 3.00 3.00 3.00 3.00
3.00 3.00 3.00 3.00
3.00 3.00 3.00
----------------------------
- - ------------------
Signal Operations
- -------------------
Phase Combination
1 2 3 4
5
6 7
8
ES Left
*
NB Left
Thru
*
Thru
Right
_
*
Right
Peds
Peds
WE Left
*
SB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green
33.OP
Green 17.OP
Yellow/AR
5.0
Yellow/AR 5.0
Cycle Length:
60 secs Phase combination
order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane
Group: Adj Sat V/c
g/C
Approach:
Mvmts
Cap Flow Ratio
Ratio Delay
LOS Delay
LOS
-----
EB L
---- ------- -----
211 361 0.299
----- -----
0.583 5.0
---
A
-----
5.5
---
B
TR
1074 1841 0.441
0.583 5.5
B
WB L
267 458 0.255
0.583 4.8
A
5.9
B
TR
1037 1778 0.518
0.583 6.1
B
NB L
351 1108 0.644
0.317 16.2
C
13.5
B
T
1180 3725 0.145
0.317 11.2
B
R
501 1583 0.178
0.317 11.3
B
SB L
388 1225 0.611
0.317 15.2
C
13.3
B
TR
1102 3480 0.206
0.317 11.4
B
Intersection Delay =
9.2 sec/veh Intersection
LOS =
B
Lost Time/Cycle, L = 6.0 sec Critical v/c(x) -
-----------------------------------------------------------------------
0.562
APPENDIX E
HCS: Unsignalized Intersections Release 2.1d BTOOP.HCO Page-1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378 _
Streets (N S) BOARDWALK = (E-W) TROUTMAN =_
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
Other Information......... BACKGROUND TRAFFIC - YEAR 2000 - PM PEA
K HOUR
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 0 0 1 < 0 1 0 1 0 0 0
Stop/Yield N N
Volumes 95 530 420 15 20 185
PHF 95 95 .95 .95 .95 .95
Grade
MC's (%)
SU/RV's (%)
CV's (%)
PCE's
0
1.10
------------- -
0
---------------
0
1.10 1.10
---------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap
(tg)
Time (tf)
------------------------
Left Turn Major
-----------------------------------------
Road
5.00
2.10.
Right Turn Minor Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS_ Unsignalized- Intersections
--=Release =2.ld----BTOOP.HCO-== Page-2
worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WE EB
Conflicting Flows:
(vph)
450
Potential Capacity:
(pcph)
819
Movement Capacity:
(pcph)
819
Prob. of Queue -Free
State:
0.74
--------------------------------------------------------
Step 2: LT from Major Street
SB NB
--------------------------------------------------------
Conflicting Flows:
(vph)
458
Potential Capacity:
(pcph)
1037
Movement Capacity:
(pcph)
1037
Prob. of Queue -Free
State:
0.89
--------------------------------------------------------
Step 4: LT from Minor
Street
WE EB
--------------------------------------------------------
Conflicting Flows:
(vph)
1108
Potential Capacity:
(pcph)
242
Major LT, Minor TH
0.89
Impedance Factor:
Adjusted Impedance
Factor:
0.89
Capacity Adjustment
Factor
due to Impeding Movements
0.89
Movement Capacity:
--------------------------------------------------------
(pcph)
216
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared Total
Queue
Approach
Rate
Cap
Cap Delay
Length
LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
-------
-----
(sec/veh)
------z-
--------
EB L
------
23
------
216
-------------
18.7
0.3
C
7
EB R
215
819
6.0
1.2
B
NB L
110
1037
3.9
0.3
A
0.6
Intersection Delay =
1.5 sec/veh
HCS: Unsignalized intersections Release 2.1d BT00A.HC0 _ Page-1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) BOARDWALK (E-W) TROUTMAN
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
Other Information......... BACKGROUND TRAFFIC - YEAR 2000 - AM PEP
K HOUR
Two-way Stop -controlled Intersection
= Northbound c Southbound Eastbound
L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- No. Lanes 1 1 0 0 1< 0 1 0 1
stop/Yield
volumes
PHF
Grade
Mc,s (%)
SU/RV's W
CV's (%)
PCE's
N
35 445
.95 .95
0
1.10
---------------
250 10
.95 .95
0
---------------
10
.95
1.10
40
.95
0
Westbound
L T R
____ ----
0 0 0
1.101
----------------------
HCS: Unsignalized Intersections Release 2.1d ST00A.HC0
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
268
Potential Capacity:
(pcph)
1013
Movement Capacity:
(pcph)
1013
Prob. of Queue -Free
State:
0.95
--------------------------------------------------------
Step 2 LT from Major Street
SB NB
________________________________________________________
Conflicting Flows:
(vph)
274
Potential Capacity:
(pcph)
1269
Movement Capacity:
(pcph)
1269
Prob. of Queue -Free
State:
0.97
--------------------------------------------------------
Step 4: LT from Minor Street
WB EB
_____________________________________________________
Conflicting Flows:
(vph)
774
Potential Capacity:
(pcph)
377
Major LT, Minor TH
Impedance Factor:
0.97
Adjusted Impedance
Factor:
0.97
Capacity Adjustment
Factor
due to Impeding Movements
0.97
Movement Capacity:
--------------------------------------------------------
(pcph)
365
Intersection Performance Summary
Adjustment
Factors
Avg.
95%
Vehicle
Critical
Follow-up
Flow
Move Shared Total
Queue
Approach
Maneuver
Gap tg
Time (tf)
Rate
Cap Cap Delay
Length LOS
Delay
________________________________________
--------------------------
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
Left Turn Major Road
5.00
2.10
2.60
________
______
______ ______ _______
_______ _____
Right Turn Minor Road
5.50
3.30
EB L
12
365 10.2
0.0 C
Through Traffic Minor Road
6.00
5.0
Left Turn Minor Road
6.50
3.40
EB R
46
1013 3.7
0.0 A
NB L
41
1269 2.9
0.0 A
0.2
Intersection Delay =
0.4 sec/veh
Page 2
HCS: Unsignalized Intersections Release 2.1d BHPOOP.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) BOARDWALK DRIVE=== _ _ (E-W) HIGH: POINTDRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
Other Information......... BACKGROUND TRAFFIC - YEAR 2000 - PM PEA
K HOUR
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound bound
= L T R I L T R I L T R L Westbound
R
No. Lanes 1 0 1 < 0 1 0 > 1 0 1 0 0 0 1 0 > 0 < 0
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RV's (%)
CV's (%)
PCE's
N
705 5
.95 .95
0
---------------
N
5 475
.95 .95
0
1.10
---------------
Adjustment Factors
5 5
.95 .95
0
1.10 1.10
---------------
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS= Unsignalized- Intersections
--=Release C2.ld----BHPOOP.=CO===-=Page -2
worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WE EB
Conflicting Flows: (vph)
744
Potential Capacity: (pcph)
581
Movement Capacity: (pcph)
581
Prob. of Queue -Free State:
0.99
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
747
Potential Capacity: (pcph)
755
Movement Capacity: (pcph)
755
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
WE
ES
--------------------------------------------------------
Conflicting Flows: (vph)
1250
Potential Capacity: (pcph)
200
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
------------ -------------------------------------
198
----
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
------ - - ---------- ------- -----
(sec/veh)
---------
-------- ------
WB L 6 198 >
295 12.7
0.0 C
12.7
WE R 6 581 >
SB L 6 755 4.8
0.0 A
0.1
Intersection Delay =
0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d BHPOOA.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N-S)6BOARDWALK cDRIVE ac (E-W) HIGH POINT DRIVE c
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
Other Information......... BACKGROUND TRAFFIC - YEAR 2000 - AM PEA
K HOUR
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound westbound e
L T R I L T R I L T R L T R
No. Lanes 0 1 < 0 10 > 1 0 10 0 0 10 > 0 < 0
Stop/Yield N N
Volumes
PHF
Grade
MCI (%)
SU/RVIs M
CVIs W
PCEIs
470 5
.95 .95
0
---------------
5 250
.95 .95
0
1.10
--------------
Adjustment Factors
5 5
.95 .95
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
----------------------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d BHPOOA.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
498
Potential Capacity: (pcph)
774
Movement Capacity: (pcph)
774
Prob. of Queue -Free State:
0.99
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
500
Potential Capacity: (pcph)
990
Movement Capacity: (pcph)
990
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
766
Potential Capacity: (pcph)
381
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
----------------------------------------------
378
-------
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-------------- -----
(sec/veh)
---------
-------- ------ ------ ------
WB L 6 378 >
508 7.3
0.0 B
7.3
WE R 6 774 >
SB L 6 990 3.7
0.0 A
0.1
Intersection Delay -
0.1 sec/veh
I !(;S : On. i C."a -1 i M ed 1 n i c I Ct Rp'leas'- ; to T oa&
- - - - - -
H J n r.. i ar, , 1 1 z e d, i n t c'
C!
p
Ce,-tze,- For' r'i'..ro:c'mput_er- it-, Trenso,i-LaHof,
iintversityOf rloriic
I 2 Weil Ha j i
WorkSjheL t TW SC 1 ntersec t
i o, ,
6ainesvi)le, FL_
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - -
Ph (904) 392-0-575
I: RT from Minor Street
N 6
S P.
Sizie tsN-S
- land i nq& (E-W�
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
C. r., n f 1 i c IL i n g F It o o h t
- - - - - - - - - - - - - -
456
- - -
E 2 6
Major JT_reet Direction. . . . EW
PotEni.ia) Capacity': tDcPh%
8 1 1
l50
Length or Time Ariavzed . 60 (min,
Movement Cr,paril.v: 1pcpji)
611
i50
Ana l YFIL . . . . . . . . .
rob of kjueUe-F ree ate
5
am -
utrier ln�orml�t�t . . ... . . . . . . (='�'-rd totst
eL -1 f -om HNjor clti ee L
lD
WE,
Eft
�O_Wa V LOD ''_Ol
or; LroiI eCj Inter Sc
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - -
- - - - - - - - - ======= - - - - - - - - -
Con f -i is t- i nO F -1 Ows vpl 1
516
655
Eastbouncj We S tt)0lJ nd NorthbOt.ind 5outhbound
Potential t,Apac i ty : trcph)
Q 7'.1
8
L T R L T R L T P L i R
Movemeni Capoc. ii ty : locph.,
975
8 3
- - - - - - - - - - - - - - - - - - - - ____i____ - - - - - - - - - - - - - - - - - - - -
P,ob , Of
u .
No. Lanes I 1 0 1 1 0 0 it 1 0 u I
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - -
St oD -i d N
Volumes I :1 6 Cj 4 0
Intersection Performance
3'u mma - v
PHF .95 95 95 95 95 .95 ,95
Grade
Avg.
'
v51
F'hared Total
-
UUeLle
Approach
SI!ikv'sRate
cap Ca I:, Delay
Length LOS
D & -I a v
cv-
Movement 1, P C P 11 1 (pcoh) { p c p n tsec/ven)
(ven)
(Sec/ven)
PCE s i . 10 1 ri i1j; I i 6
P
-------- ------ ------ ------ -------
------- -----
---------
------------------------------------------------------------------------
NE. k 122 8 1 i 5.2
0.6 E
5.0
Adjustment Factors
SEl F �5
I ?-;0 5.0
0.0 El
'Vehicle Critical Follow-up
EF, L 156 8 3 -1
U.8 6
Maneuver Gap 09) Time (tf)
---- --- - - - - --------------
WE L A
A
--- --- ----- - --- ---- -- ------------- - ----- -
Left Turn Major- Road 5.00 2 . 10
intersection Delay
sec veh
Right Turn Minor koacl o.50
-1hrOLlain Traffic minor Rod 6 . 0 u 3 Cl
Left Turn Minor- Road 6.50 . 40
HCS: 'UI'is igna l'i Zed II'lte,-sec'i".inn. Release 16 i'age-
Cel'rLcr Fol' Ih iCI' o,_o,,,pu'Lers 1n I ransport,S L ioll
Uri i ver's i ty of Fl,r-i0a
512 Well Halt
&,3 in esv'i 11 e., FL .>261-208.::
F'h: (904) 392-05_L.
Streets, 04" landings t&rb noardwal).
Major �ltreei: Dil"eci:'lon.... EW
Lerigth of Time AnB iyzed... 6L' min)
Ant;)yst.. .... ....... In ld
Date of Ana-V is .. ' / :7
Other lutorm tiol .... 2000 '01 e,m Pm ul: c7 r'-nd total
Iwo - way Stop nor, trol Iea Ill ter_ecti on
Eastuound I We=_:i_bouna Ivor Inbound SOUthbOLMIJ
I_ T K L I R 1 L 7R L T K
i____ ____ ____i_ ____ ________ ____
----
----
-_--
No. Lanes 1< 0 i i 0 ; 0 0 l t
Stop/Yield R; N;
Volumes 1 25 145 70; 55 150
PHF _95 .95 95 05 .95 .9 I .05i .95
Drape 0 0 0 u
MC•s (%)
SU/RV's tA)I
C V • s k %
PCE.'.. - Ill 10 1.-0! I.10
-----------------------------------------------------------------------
Ad iustmert Factors
Vehicle
Cr-itica l
Follow-up
Maneuver
W o (tg)
Time I.tf)
_____________________________
Left lure major
Roan
______________________________
5.00
2.10
Right Turn Minor-
Road
5.50
2.60
Irlrough lraffQ
M1nor Road
6.00
330
Lett lurn Minor
road
6.50
1.40
unsinnal i_ed intersect'i orl. i.:i lea=,e _. ic; F'r.-go
Wor'ba'.hcEt fol- 7W5C intersection
,"tep is RT from Minor Street: NE• S0
Con; licti nc riows: Lvon)
190
408
Potential
Capacity: (peon)
110?
860
Movement
Capacity: 1pcph)
1109
860
Pr"oL-. of
i.lueue-Free State:
0-99
0.9
Steo Ll
frui,, ilia lor- St.r eet.
WEz
EE
_ _..___.___.__._
Coll Ilrt inU
_____._____.__-____
°laws. kvoll)
____ _..___
227
A47
�otenti,al
Capacity: 1pcph)
1336
i050
riovement
Capacity: (pcph)
1586
1050
Pr-oo_ of
________________________________________________________
Vuelre-Free _•tatc:
0.95
0.97
intersection Performance summary
Avg.
95R•
Fiow Move Shar'eti Total
Queue
Approach
Rate Cap Cap Vela
Length L(JC•
Delay
NovemenT_
________
Lpcph) 1pcpn) (.pcph)tsecjveh) {Veh) _____
______ ______ ______ _______ _______
)sec/Veh)
_________
4.
SE• R
L9 E60
EPL
29 1050
0.0 A
u_4
W6 L
64 OVID 2.8
0.0 A
0.3
intersection Delay =
0.5 sccIve'r
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 06-23-1997
Center For Microcomputers In Transportation
Streets (E W) BOARDWALK DRIVE== (N-S)=JFK=PARKWAY
Analyst: RR File Name: BJFKOOA.HC9
Area Type: Other 6-23-97 AM
Comment: BACKGROUND TRAFFIC - YEAR 2000
Eastbound westbound Northbound Southbound
L T R L T R L T R_ L T R
____ ____ ____ ____ ____ ____ ____ ____ ----
No. Lanes 1 1 < 1 1 < 1 2 1 1 2 <
Volumes 15 165 10 15 300 70 50 40 35 100 20 35
Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vols 0 0 0 0
Lost Time 3_00 3_00 3_00 3_00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
_________________________________________
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * NB Left +
Thru * Thru
Right * Right
Peds Peds
WB Left * SB Left
Thru * Thru
Right * Right +
Peds Peds
NB Right EB Right
SS Right WB Right
Green 33.OP Green 17.OP
Yellow/AR 5.0 Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: #1 #5
---- ---------- ---------------------------------- - --
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
_____ ____ _______ _____ _____ _____ ___ _____ ---
EB L 378 648 0.042 0.583 4.1 A 4.4 A
TR 1077 1846 0.172 0.583 4.4 A
WE L 658 1128 0.024 0.583 4.0 A 5.1 B
TR 1056 1810 0.369 0.583 5.1 B
NB L 484 1530 0.109 0.317 11.0 B 10.9 B
T 1180 3725 0.037 0.317 10.8 B
R 501 1583 0.074 0.317 10.9 B
SB L 504 1591 0.208 0.317 11.4 B 11.2 B
TR 1067 3369 0.057 0.317 10.8 B
Intersection Delay = 6.9 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6_0 sec Critical v/c(x) = 0.313
_______________________________________________________________
�4c'
..cn r,=r is pr' 1`i'i ..^r OC ninbUt er? In ir"anSUOr LaCi;v�
1{reel>: (C-W' bOar'G'r,.ylla tN-j'1 'fb
Ana lv st Mjd File
Ar EL 7VD@: iti+"rer _.-5;' ani o
en
t, omn, et: 63CC4Y`OunU LraitlC - V^Rr' il'1rV'
i.uo,jndWesrbou nd___-__ J`r I. n o ou n ci =ol, o uno
L T
Iu LEI"ic_ t
umes d0 i'10 65 r 146, 'i.`.
Ci J'i� L15 11` Ylj
Lane W (Y tl;i_.r.1 1E.ii iP.W
RTOR V.-,ls
L USt Time ,, .lJrrIU;J.IJ iJ S.VU .. .IIV ;,i . ll it ...rr iiUlJ.rii r'J _.0fi
__________________________
�. ignbl VG H'a T. ii'n:
Phase hnwi-�ination 1 2 .i 4
c5 Lett
k iaht 6i al -It
Wo z, e L..i
nrrr, i i'.ru
F'ignt Runt
rods red
ur,t ;En Right
S6 Right ;W6 ni 11_1-1t
Green 5: . G' j 6 een 1 7 . CIr
Yeilnw/AR -.G iellow"AR 5C,
Cycle Le,,gt:h: 60 secs Rhisecc,mbinat'ion or-cer: ql c5
------------"
Intersection Pe.rfnrRlEnra Stimolar"l'
Lana 6rnup: Ad.i jai v:r g;C A.a or oacn:
M vmis i.a0 Fi,>w Ratio Ratio 6elav LU-, uelav LG°
---- E6 L 25� u 0 c50 0 5fi - u ---
TR i07a io4i Cj.4:i7 r.
W6 L 467 0.250 0.56 a.7 A 5.6 ElTR iDJ6 i; 74 0.47 i 0.56 5. i
iJE L 95i ii6E 0.644 r.317 16."c C i5.5
T ilor 5725 0.145 r.Si7 11.E
F.' S01 15E- 0.17E c.31i i1.5 6
SE 1. 's56 12'i5 0.-
u., 1i .317 14.7 E.
,
Ti; l 101- i460 0 06 il._ i j 15.4
5r'c:=,_C inn VaI .iV = _ i -cn In*:Erc.c�ti<,n LV`, = C.
LOST I'i rt'i-!r. 1'^It-, L = 6 0 _._C Q'i L'i cal v:r .:l = _ iii `
1 APPENDIX D
M r M M
HCS: Unsignalized Intersections Release 2.1d ST97P_HCO_ _ _Page-1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) BOARDWALK (E-W) TROUTMAN
Major street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
Other Information......... EXISTING CONDITIONS - YEAR 1997 - PM PE
AK HOUR
Two-way Stop -controlled Intersection _
= INorthbound I Southbound I EastboundR I LWestboundR
L T R L T R L
No. Lanes I 1 1 0 10 1 < 0 11 0 1 10 0 0
Stop/Yield
volumes
PHF
Grade
Mc,s (%)
SU/RV's W
CV,s W
PCEIs
N
91 507
.95 .95
0
1.10
--------------
N
401 13
.95 .95
0
---------------
Adjustment Factors
Vehicle
critical
Follow -UP
Gap (tg)
Time (tf)
Maneuver
Left Turn Major
------------------------------------------
Road
5.00
2.10
2.60
Right Turn Minor Road
5.50
3.30
Through Traffic
Minor Road
6.00
3.40
Left Turn Minor
Road
6.50
HCS: Unsignalized- Intersections
-_-Release _2.1d-__-BT97P.HC0Page -2
Wcrksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
___________________________________
Conflicting Flows 429 (vph) 839
Potential Capacity: (pcph) Movement Capacity: (pcph) 0839
39
Prob. of Queue -Free State:
Step 2: LT from Major Street SB ___- -___ ___________NB
Conflicting Flows: (vph) 436
Potential Capacity: (pcph) 1062
Movement Capacity: (pcph) 1062
Prob. of Queue -Free State: 0.90
--------------------------------------------------------
Step 4: LT from Minor Street WE EB
_ _____ ______________________________
Conflicting Flows: (vph) 1059
Potential Capacity: (pcph) 258
Major LT, Minor TH 0.90
Impedance Factor: 0.90
Adjusted Impedance Factor:
Capacity Adjustment Factor 0.90
due to Impeding Movements 232
Movement Capacity: (pcph)
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
________ ______ ______
---------
EB L 21 232 17.1 0.2 C 6.7
EB R 201 839 5.6 1.1 B
NB L 106 1062 3.8 0.3 A 0.6
Intersection Delay = 1.4 sec/veh
HCS: Unsignalized Intersections Release 2.1d BT97A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets:(N-S) BOARDWALK = _ (E-W) TROUTMAN
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 7/24/97
Other Information......... EXISTING CONDITIONS - YEAR 1997 - AM PE
AK HOUR
Two-way Stop -controlled Intersection
=LNorthboundd I LSouthboundd cLEastboundR LWestboundR
No. Lanes 1 1 0 0 1 < 0 1 0 1 0 0 0
Stop/Yield N N
Volumes 33 422 239 6 7 37
PHF .95 .95 .95 .95 .95 .95
Grade
MC's (%)
SU/RV's (%)
CV's (%)
PCE's
0
1.10
----------------
0
---------------
1.10 1.10
--------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap
(tg)
Time (tf)
Left Turn Major
-
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS:-Unsignalized- Intersectionss _--Release -2.ld---_BT97A.HC0------ Page -2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
255
Potential Capacity: (pcph)
1028
Movement Capacity: (pcph)
1028
Prob. of Queue -Free State:
0.96
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
258
Potential Capacity: (pcph)
1292
Movement Capacity: (pcph)
1292
Prob. of Queue -Free State:
0.97
--------------------------------------------------------
Step 4: LT from Minor Street
WB
ES
_____________________________________________________
Conflicting Flows: (vph)
734
Potential Capacity: (pcph)
398
Major LT, Minor TH
Impedance Factor:
0.97
Adjusted Impedance Factor:
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.97
Movement Capacity: (pcph)
- ----- ------- - - ------------------------------------
386
Intersection Performance
Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
-------
(veh)
-------
(sec/veh)
------------
__ _ ------ ------ ------
EB L 8 386 9.5
0.0
B 4 6
EB R 43 1028 3.7
0.0
A
NB L 39 1292 2.9
0.0
A 0.2
Intersection Delay =
0.4 sec/veh
HCS: Unsignalized Intersections Release 2.1d BHP97P.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N-S) BOARDWALK DRIVE (E-W)cHIGH POINT DRIVE=
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
Other Information......... EXISTING CONDITIONS - 1997 - PM PEAK HO
UR
Two-way Stop -controlled Intersection
Northbound Southbound Eastboundc Westbound
L T__ R L T R __ L T R L T R
____ ______ ____ ____ ______ ____ ____ ____ ____ ____
No. Lanes 0 1 < 0 0 > 1 0 0 0 0 0 > 0 < 0
Stop/Yield N N
Volumes 671 4 6 451 2 3
PHF .95 .95 .95 .95 .95 .95
Grade
MC's M
SU/RV's (%)
CV's (%)
PCE's
------------
0
--------------
1.10
---------------
Adjustment Factors
0
1.10 1.10
---------------
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsignalized Intersections Release 2.1d 33HP97P.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WE EB
Conflicting Flows: (vph)
708
Potential Capacity: (pcph)
606
Movement Capacity: (pcph)
606
Prob. of Queue -Free State:
1.00
--------------------------------------------------------
Step 2: LT from Major Street
SB NB
________________________________________________________
Conflicting Flows: (vph)
710
Potential Capacity: (pcph)
787
Movement Capacity: (pcph)
787
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
-------------------------------------------------
Step 4: LT from Minor Street
WE EB
________________________________________________________
Conflicting Flows: (vph)
1189
Potential Capacity: (pcph)
217
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
________________________________________________________
214
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
________ ______ ______ _____________ _______ _____ ---------
WE L 2 214 >
350 10.4 0.0 C 10.4
WE R 3 606 >
SB L 7 787 4.6 0.0 A 0.1
Intersection Delay = 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d BHP97A.HC0 Page 1
Center For Microcomputers =In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N S) BOARDWALK DRIVEc =_ (E-W) HIGH POINT DRIVE _
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
Other Information......... EXISTING CONDITIONS - 1997 - AM PEAK HO
UR
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound6 Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- --- ---- --- ---- ---
No. Lanes 0 1 < 0 0 > 1 0 0 0 0 0 > 0 < 0
Stop/Yield N N
Volumes 449 1 2 236 3 5
PHF .95 .95 .95 .95 .95 .95
Grade
MC's (%)
SU/RV's (%)
CV's (%)
PCE's
0
.--------------.
0
1.10
--------------
Adjustment Factors
0
1.10 1.10
--------------
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsignalized Intersections Release 2.1d BHP97A.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
474
Potential Capacity: (pcph)
796
Movement Capacity: (pcph)
796
Prob. of Queue -Free State:
0.99
--------------------------------------------------------
Step 2: LT from Major Street
SB NB
--------------------------------------------------------
Conflicting Flows: (vph)
474
Potential Capacity: (pcph)
1019
Movement capacity: (pcph)
1019
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
---------------------------------------------------
Step 4: LT from Minor Street
WE EB
--------------------------------------------------------
Conflicting Flows: (vph)
724
Potential Capacity: (pcph)
403
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
------------- ----- ---- - -----------------------------
402
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
-------- ------ ------ ------ -------------- --------------
WB L 3 402 >
600 6.1 0.0 B 6.1
WB R 6 796 >
SB L 2 1019 3.5 0.0 A 0.0
Intersection Delay = 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d BL97P.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) LANDINGS (E-W) BOARDWALK DRIVE
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
Other Information......... EXISTING CONDITIONS - 1997 - PM PEAK HO
UR
Two -way -Stop controlled_ Intersection =-- ----------------------------
LEastboundR LWestToundR LNorthboundd LSouthboundR
No. Lanes 11 1 < 0 1 1 1 c 0 1 0 > 1 c 0 1 1 1 c 0
Stop/Yield
volumes
PHF
Grade
MCI (%)
SU/RV's (%)
CVIa (%)
PCEIs
S
128 341 106
.95 .95 .95
0
1.10
---------------
N
80 364 230
.95 .95 .95
0
1.10
---------------
78 62 98
.95 .95 .95
0
1.101.10 1.10
-
Adjustment Factors
18 9 27
.95 .95 .95
0
1.10 1_10 1_10
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS= U=s=gnalized- Intersections
=--Release
_2.1d----BL97P
HCOP=9e=2
Worksheet for TWSC Intersection
____________________________________-___-_-__-
Step 1: RT from Minor Street
___________________-_______
NB
BE
_ _____
Conflicting Flows (vph)
415
853
504
769
Potential Capacity: (pcph)
853
769
Movement Capacity: (pcph)
0.87
0.96
Prob. of Queue -Free State:
-------
-------------------------------------------------
Step 2: LT from Major Street
WE
EB
_ _____ ______________________________
Conflicting Flows (vph)
471
1022
625
863
Potential Capacity: (pcph)
1022
863
Movement Capacity: (pcph)
0.91
0.83
Prob. of Queue -Free State:
-------
-------------------------------------------------
Step 3: TH from Minor Street
NB
SB
-------------------------------------
Conflicting Flows: (vph)
1259
1194
258
Potential Capacity: (pcph)
236
Capacity Adjustment Factor
0.75
75 0.
due to Impeding Movements
175
Movement Capacity: (pcph)
09
0.94
Prob. of Queue -Free State:
------------------------------------------------
Step 4: LT from Minor Street
NB
SB
-------------------------------------
Conflicting Flows (vph)
1156
227
1222
208
Potential Capacity: (pcph)
Major LT, Minor TH
0.71
0.45
Impedance Factor:
0.78
0.56
Adjusted Impedance Factor:
Capacity Adjustment Factor
07175
0.49
due to Impeding Movements
149
02
Movement Capacity: (pcph)
________________________________________________________
Intersection
Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
------ ------
(veh)
------- -------
(sec/veh)
----- -------
-------- ------
NB L 90 170 >
NB T 72 179 > 258
247.3 23.4
F 297.3
NB R 113 653 >
SB L 21 102
44.4 0.8
E 20.7
SB T 10 194 >
SB R -31 769 > 446
8.9 0.2
B
EB L 149 863
5.0 0.7
B 1.1
A 0.5
WE L 92 1022
3.9 0.2
Intersection Delay = 39.5 sec/veh
HCS: Unsignalized Intersections Release 2.1d SL97A.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: -(904)-392-0378c=Qom=a=
Streets: (N-S) LANDINGS (E-W) BOARDWALK DRIVE
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 6/20/97
Other Information......... EXISTING CONDITIONS - 1997 - AM PEAK HO
UR
Two-way Stop -controlled Intersection
====L===cc=I=LEastboundR = LWestboundRc LNorthboundd_= LSouthboundR==
No. Lanes 1 1 1 < 0 1 1 1 < 0 1 0 > 1 < 0 1 1 1 < 0
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RV's (%)
CV's (%)
PCE's
------------
N
25 180 67
.95 .95 .95
0
51 333 70
.95 .95 .95
0
7 4 4
.95 .95 .95
0
1.10 1.10 1.10
--------------
Adjustment Factors
54 40 23
.95 .95 .95
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap
(tg)
Time (tf)
-----------
Left Turn Major
- ----------------------
Road
5.00
-----
----------- --
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS_-U=signalized- Intersections
=--Release
-2.1dBL97A
HCDPage-2
Worksheet for TWSC Intersection
--------------------------------------------
Step 1: RT from Minor Street
--
SB
________________________________________________________
Conflicting Flows: (vph)
224
386
881
Potential Capacity: (pcph)
1066
881
Movement Capacity: (pcph)
1066
0.97
Prob. of Queue -Free State:
1.00
- ------------------- ----------------------------------
Step 2: LT from Major Street
WB
EB
________________________________________________________
Conflicting Flows: (vph)
260
425
Potential Capacity: (pcph)
1289
1075
Movement Capacity: (pcph)
1289
1075
0_97
Prob. of Queue -Free State:
0_
--95
-
Step 3_THfromMinorStreet
NB
SB
- -- - -
Conflicting Flows: (vph)
730
728
Potential Capacity: (pcph)
452
453
Capacity Adjustment Factor
0.93
due to Impeding Movements
0.93
Movement Capacity: (pcph)
420
421
Prob. of Queue -Free State:
0.99
0.89
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
________________________________________________________
Conflicting Flows: (vph)
726
696
Potential Capacity: (pcph)
402
419
Major LT, Minor TH
0.83
0.92
Impedance Factor:
0.87
0.94
Adjusted Impedance Factor:
Capacity Adjustment Factor
0.94
due to Impeding Movements
0.84
Movement Capacity: (pcph)
----------- ----------------------------------
338
---------
392
Intersection
Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
------ ------
(veh)
--------------
(sec/veh)
---------
-------- ------
NB L 8 338 >
NB T 4 420 > 433
8.6 0.0
B 8.6
NB R 4 1066 >
SB L 63 -392
10.9 0.6
C
SB T 46 421 >
9.4
_
SB R 26 881 > 519
8.1 0.5
B
EB L 29 1075
3.4 0.0
A 0.3_
_
WB L. _ 59 1289
2..9 0.0
A 0.3
- Intersection Delay 1.7 sec/veh
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4d
06-20-1997
Center
For Microcomputers
In Transportation
Streets:=(E
W) BOARDWALK
DRIVE=
(N-S) JFK PARKWAY
Analyst: RR
File Name: BJFK97A.14C9
Area Type:
Other
6-20-97 AM
Comment: EXISTING
CONDITIONS - 1997
Eastbound
= Westbound
Northbound
Southbound=
L
T R
L T
R
L T R
L T
----
R
No. Lanes
---- ----
1
----
1 <
---- ----
1 1 <
----
---- ---- ----
1 2 1
---- ----
1 2 <
Volumes
11
159 8
11 296
68
36 40 33
43 18
34
Lane W (ft)
12.0 12.0
12.0 12.0
12.0 12.0 12.0
12.0 12.0
RTOR Vols
0
0
0
0
Lost Time
3.00 3.00
3.00
3.00 3.00
3.00
3.00 3.00 3.00
3.00 3.00 3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination
1 2 3 4
5
6 7
8
EB Left
*
NB Left +
Thru
*
Thru
Right
*
Right +
Peds
Peds
WB Left
*
SB Left
Thru
+
Thru +
Right
+
Right +
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green
35.OP
Green 15.0P
Yellow/AR
5.0
Yellow/AR 5.0
Cycle Length:
60
secs Phase combination
order: #1 #5
-----------------------------------------------------------------------
Intersection Performance
Summary
Lane
Group:
Adj Sat v/c
g/C
Approach:
Mvmts
-----
Cap
----
Flow Ratio
------- -----
Ratio Delay LOS
----- ----- ---
Delay
-----
LOS
---
EB L
414
672 0.029
0.617 3.4 A
3.7
A
TR
1141
1850 0.153
0.617 3.7 A
WB L
710
1151 0.017
0.617 3.4 A
4.3
A
TR
1116
1810 0.344
0.617 4.3 A
NB L
436
1540 0.087
0.283 12.0 B
11.9
B
T
1055
3725 0.042
0.283 11.9 B
R
449
1583 0.078
0.283 12.0 B
SB L
451
1591 0.100
0.283 12.1 B
12.0
B
TR
952
3360 0.061
0.283 11.9 B
Intersection Delay =
6.3 sec/veh Intersection LOS =
B
Lost Time/Cycle, L = 6.0 sec Critical
-----------------------------------------------------------------------
v/c(x) = 0.267
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4d
06-20-1997
Center -For Microcomputers In Transportation
=
Streets: (E-W) BOARDWALK DRIVE
_ (N S) JFK PARKWAY
Analyst: RR
File Name: BJFK97P.HC9
Area Type:
Other
6-20-97 PM
Comment: EXISTING
CONDITIONS - 1997
===Eastbound ====westbound
= Northbound
Southbound
L
T R
L T
R
L T R
L T
R
No. Lanes
----
1
---- ----
1 <
---- ----
1 1 <
----
---- ---- ----
1 2 1
---- ---- ----
1 2 <
Volumes
55
390 31
61 387
133
129 148 80
185 108
87
Lane W (ft)
12.0
12.0
12.0 12.0
12.0 12.0 12.0
12.0 12.0
RTOR Vols
0
0
0
0
Lost Time
3.00
3.00 3.00
3.00 3.00
3.00
3.00 3.00 3.00
3.00 3.00 3.00
-------- --------------------------------------------------------------
Signal Operations
Phase Combination
1 2 3 4
5
6 7
8
EB Left
*
NB Left
Thru
*
Thru
Right
Right
Peds
Peds
WE Left
*
SB Left
Thru
*
Thru
Right
Right
Peds
Peds
NB Right
EB Right
SB Right
WE Right
Green
33.OP
Green 17.OP
Yellow/AR
5.0
Yellow/AR 5.0
Cycle Length: 60
secs Phase combination
order: #1 #5
-----------------------------------------------------------------------
Intersection Performance
Summary
Lane
Group:
Adj Sat v/c
g/C
Approach:
Mvmts
Cap
Flow Ratio
Ratio Delay LOS
Delay
LOS
-----
EB L
----
203
------- -----
348 0.286
----- ----- ---
0.583 5.0 A
-----
5.3
---
B
TR
1074
1842 0.413
0.583 5.4 B
WB L
302
518 0.212
0.583 4.6 A
5.9
B
TR
1045
1791 0.524
0.583 6.1 B
NB L
358
1130 0.380
0.317 12.4 B
11.6
B
T
1180
3725 0.139
0.317 11.1 B
R
501
1583 0.168
0.317 11.3 B
SB L
393
1241 0.496
0.317 13.5 B
12.4
B
TR
1101
3476 0.196
0.317 11.4 B
Intersection
Delay =
8.3 sec/veh Intersection LOS =
B
Lost Time/Cycle,
-----------------------------------------------------------------------
L = 6.0 sec Critical
v/c(x) = 0.514
APPENDIX C
UNSIGNALIZED INTERSECTIONS
Irtlersection7'otal Delay = (Vehicle Total Delay x Volume) _
Volume
Level -of -Service (Intersection) _
Level -of -Service
Average Total Delay,
secheli
A
<_5
B
>5and 510
C
> 10and <_20
D
>20and <_30
C
> 30 and 5 45
r
> 45
n
Level of Servlce for Slgnsllzed Intersectlons
Level of service for signalized intersections is defined in terms
of delay, which is a measure of driver discomfort and frustration,
fuel consumption, and lost travel time. Specifically, level -of -
service (LOS) criteria are slated in terms of the average slopped
delay per vehicle for a 15-min analysis period. The criteria are
given in Table 9-1. Delay may be measured in the field or estimated
using procedures presented later in this chapter. Delay is a complex
measure and is dependent upon a number of variables, including
the quality of progression, the cycle length, the green ratio, and
the P/c ratio for the lane group in question.
LOS A describes operations with very low delay, up to 5 sec per
vehicle. This level of service occurs when progression is extremely
favorable and most vehicles arrive during the green phase. Most
vehicles do not stop at all. Short cycle lengths may also contribute
to low delay.
LOS B describes operations with delay greater than 5 and up to
15 sec per vehicle. This level generally occurs with good progres-
sion, short cycle lengths, or both. More vehicles stop than with
LOS A, causing higher levels of average delay.
LOS C describes operations with delay greater than 15 and up
to 25 see per vehicle. These higher delays may result from fair
progression, longer cycle lengths, or both. Individual cycle failures
may begin to appear at this level. The number of vehicles stopping
is significant at this level, though many still pass through the
intersection without stopping.
LOS D describes operations with delay greater than 25 and up
to 40 sec per vehicle. At level D, the influence of congestion
becomes more noticeable. Longer delays may result from some
combination of unfavorable progression, long cycle lengths, or
high v/c ratios. Many vehicles stop, and the proportion of vehicles
not stopping declines. Individual cycle failures are noticeable.
LOS E describes operations with delay greater than 40 and up
to 60 see per vehicle. This level is considered by many agencies to
be the limit of acceptable delay. 'I here high delay values generally
indicate poor progression, long cycle lengths, and high P/c ratios.
Individual cycle failures are frequent occurrences.
LOS F describes operations with delay in excess of 60 sec per
vehicle. Ibis level, considered to be unacceptable to must drivers,
often occurs with oversaturation, that is, when arrival flow rates
exceed the capacity of the intersection. It may also occur at high
v/c ratios below 1.0 with many individual cycle failures. Poor
progression and long cycle lengths may also be major contributing
causes to such delay levels.
TABLE 9-1. LEVEL -OF -SERVICE CRITERIA FOR SIGNALIZED
INTERSECTIONS
LEVEL OF SERVICE STOPPED DELAY PER VEHICLE (SEC)
A
55.0
B
>5.0 and 5 15.0
C
>15.0 and 5 25.0
D
>25.0 and 5 40.0
E
>40.0 and 5 60.0
F
>60.0
APPENDIX B
A
M
p
m
MATTHEW J. DELICH , P.E.
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Observer Mt KC
INTEASEC'ION OF
TABULAR SUMMARY OF VEHICLE. COUNTS
Date `� 15 q 7 Day Fet bA y �Iry Folfr l:O L L / AJ `:
1 F K /a r D w A(-i -
AND
R -Right turn
S= Straight
L = Lett turn
TIME
BEGINS
J F K
J FK
OT
Norm
South
P,O.a�Dw/1��
from :AST
I R I S I L I Total II
tram WEST
R I S I L I Total II
I TE
"1e3
TOTAL
ALL
tram NORTH
from SOLITH
R I S I L I Total II
R I S
I L
I Total
1? O 115
1 3 1 7
1 /S II 9 1 -7 1 1 1
1 .27 II
4 II
to 164 1 Z 1 '7 II
0 I 9 1 0 l
3
I745 II-7
1 7 11(,,1
30 11 1 131 I
31 II
GI 11
31 -713 1113 11313(a14.1
y3 II
16"G it
a/7
2'00 11141 67 1 1 Z
1 32-11101 131 SI
a8 II
60 112
I 1 13 1 9z II
Z 1441s1
51 11
1'f3 II
'-�o3
I'sl5 II
I Z I
I lg 1151 77 I it
1 3 II
q 1 11
-7I ¢131 9q II
3 1401Zl
q5 11
/JF 11
/80
II
I I
I II I I I
II
II
I I I II
I ! I
II
II
17-24 0113`{I /a 1g31
7511331 40 1361 /07 II
4 11(p81a9
I // 107s11
S 116911/ I
i 9 11�re-
Sit '76-7
II
I I
I ii I I I
ii
II
1 I t II
I I I
II
II
I ecs II
I I
1 1 I► I I I
I II
Z II
I I t o II
I I I
o II
C7 II
2
PE�s II
I
1 0 II I I
t o II
U 11
1 1 I Z II
1 I t
o (I
11
Z
8IIz4I 13i
9II
IIao1 lag II
931131�3o
z7
745 IIZoI 151d(g1
s1 1111 1371311
g 11
114111171131 17,7 11
7 1 771121
3 11
4� z
Sao I1Z¢1 3,Z 14(91 o.211 Z21 ".`1 Z?
I /a 11
187
113 91 a(> 1171 14z. 11
3 11o8 1 /01
1;7 II
I , 7 it
L4 5 7
1 5/5 IIZZ13 1 is(✓I
09 111, 14Z IZ(oI
a�> 11
/45
112 I 031 134 11
7 1 gZlZOI
103 11�,53
11
L448
II
I I
I II I I
I II
II I I I II
I I I
II
II
430-t521l1 S 71
/09 11851
38o II Sol 149 I/Z.
1 357 II
73
II 3 I LI / 1 6-8 11.31
I 901661
47(� 11
105 II
/79q
II
I 1
1. _ II 1 1
1 II
11 1 1 1 11
1 1 1
11
II
i2'7511
1 1
1 3 11 1 1
1 / 11
4
II I I I Z 11
1 1 1
o II
'T II
�
o
a
MATTHEW J. DELICH , P.E.
of 2 2272 GLEN HAVEN DRIVE -
LOVELAND, CO 805.38 .
A TABULAR
Observer /�l K
INTERSECTION OF L AAJDIA-)G5
SUMMARY OF VEHICLE COUNTS
rD�ate 4 Z 1 77 Day PmtA Y Olty Fo p T l 0 Ll. /K)S
Pater OFFICE 1 14��WAcIG
AND
R = Right tum
S=Lefttrtt
L =Lett tum
BEGIN
L.AAJ�lVG' i
P_ O
Nort
South
`,-.o-bWAtFL
�APTIME OWAt_K
T
West
T�
tram NORTH
I from SOUTH
tram EAST
I
I from WEST
R I S
I L I Tonal II R I S I L
I Total II
I R
I S I L 17atal
II R I S
I L
I 7atal II
1730 113 1
10 I IA I
.27 110 1 I I
Z 1 3 II
1113 1 70 1 11 1 9
II IS I Z9 1 3 I o 11
/ z1q II'
1741
745 114 1
1(9 11s1
35 11
1 I Z 1
Z 1 s 11
4a
II2-41 R7 11-7 1 139
1121 144 1101 75- it
;Z/3 II
as3 .
7so0 I110I
5 I t4 I
a9 II
Z I o I
I I 3 II
.3
1119 11 1 1141 la4
11 1315.5- 1 TI73 11
/97 II
aa9
$I II l0 1
1 It I
i6 II
1 1 1 1
21 q II
3o
1114 17 I I 9g
1115152. 1 7 1 Iq II
/72-. II
ao
II I
I I
II
I I
I II
It I I I
II I i I II
II
h�-�3o11a31
q I 41117
II
LlI q
1 7 1 /s II
/32,-
117 0 13 3 31.5 1 qv4
11671/801as1a z II
aIa it
LEE
II I
I I
II
I
I I II
II
I I I
II I I I it
II
13�r e II I
I l
a It
I
I t o II
o
II I I 12
11 1 1 I I II
3 II
3
��711 I
I t
o II
I
I t o II
�
II I I I I
II i i I v II
I II
I
�IKEII I
I t
o II
I
I 1 o II
o
II I I I I
II I I I I II
2 II
z
PETiII I
I t
o II
I
I t o II
o
II I I I b
II I I t o II
O II
o
II i
I I
II
I
I I II
II I I I
II I I t II
II
30 11 a 1
5' 1 -7 1
11251 Ito
IIy 1 �(, 11
-7e,
II6-4175I1 7 1 /y/o
jZ6I G._; IZ&I //7 11
3 II
339
4-45 114 1
1 15 1
/o 11231 16
1 24 1 57 II
�g7
II&`b 1 10 1`7-1 /g/
1131 1 97 1381 /&q 11
.349 it
'4/io
s-oo II & I
Z I I I
7 II 24- I Z 1
12 Z I �, 7 11
7 C,
II 59 11771 -6' 1 /9,3
112 71 ' 131 1 /56 11
33.E 11
1 '
s/5 II I_
15"1
/S" 11Z&110
11-716� 8 it
3
I1L1731Z-Z1 /0
11221-75-1331 /3 q I
11
371
II I
I I
II
I
i I II
It I I I
it I 1 1 II
li
430-5301Ia7I
7 1 /al
5`f 119816;-
I7F1a3s 11
�9Z
11;30I31,`
1001
(,7q
11/061
I/a-75 111A
9
MATTHEW J. DELICH , P.E.
2272 GLEN HAVEN DRIVE
�(? ZZ LOVELAND, CO 80538
Ottaer"r N tit
INTERSECTION OF
TABULAR SUMMARY OF VEHICLE (rCOUNTS
U Date ZZ 97 Day t/ES f14? City Me T e0 LCr /AU S
10 A P D to A L. K AND T�gUT�dA)
R = Right turn
S= Stralprtt
L = Left tum
TIME
BEGINS
[�
{30A2'�wAL
�AoetWALK
TOTAL
NORh
South
—%2�JUTMit41J
_
East
Ewt
AL
TALL
ALL
from NORTH II
from SOUTH
from EAST
�)
from WEST
R
I S
I L I Tatal II R I S I L
I Total
I R
I S I L I Total II
R I S
I L I Total
1-730 II
2
14(o
I 142 II
Ilos 1 -7 I ilz 11
/60
11
I I I II 4 1
I Z I 4, II
(, II-
/GG
745 II 1
I �I I
I II
1133 114 1 t/ II
as
II
I I I 11131
13 I 6 li
�� it
a
Iwo II 2
I !�I I
I :� II
95 (lo I ios II
lab
II
I I 11 7I
I ( I 8 II
g II
/7(a
�61 S II I
131 I
I II
189 1 2 1 9/ 11
1 3 11
1 I 1 II 3 1
1 1 1 Iq II
i y II
s�
it
I I
I II
I I I II
II
I I I it I
I I II
II
173o83uil
I: '� I
I aYsll 12,Z1331 L/ssll 700 II
I I I 11371
1 7 1 yy II
44 I.I 74
1 II I
I
I II
I I I II
II
I I I II I
I I II
II
I ���� II I
I
I I II
I I II
Z II
I I II I
I t o II
o II
7-
Pe n l I
I
l 0 II
I 1 o it
o II
I I I
I I I
U
I o
i31K� I I
I
I I II
I I z II
3 II
I II I
I o 11
o II
Pe : II I
I
t o II
I I 1 0 II
v II
I I II I
I I o it
o II
v
II I
I
I II
I I I II
II
I I i II I
I I II
II
4?OII5- 1i9I
18q II
147 121/a3 II;Co7 11
1 1 1 113Z1
1 41 31, 11
.3 II
; 4 3
44s 11 I 1 lot 1
1 /02- 11
1l&01 z51 / s II 47 II
1 I 1 11441
1 a 1 48 11
Ai9 II
335
500 II S 1105-1
1 //o 11
11Z?I 141143 II -5-3 11 -1
1 115-31
1 4 157 11
6-7 it
3/0
61s IIZ 11//
I //8 11
117,1 IZ(oI y7 II
a6's 11
I I 114571
I(o 1s 11
II I
I
I II
I I I II
II
I I I II i
I I II
II
h071 cl/ 1. 98 ��
/o�z
��/
�/8 �19z ��
/9� 1I
/'205/
CITY OF FORT COLLINS
TRAFFIC OPERATIONS SYSTEM DESIGN AND MONITORING
02-05-1997 ••• Weekly S.,, For Meek Of February 4, 1997 • 08:27 Pg 1
.....................................................................................................................................
ale: M0297001.PRN Sta: oaaa 010304 Id: DOOOOOOOOMT131 C4mnld: Ol
lily/Tom: FORT COLLINS County: LARIMER
ideation: BOARDWALK WIG 0FK EAST80UND Format: Lane
lane/s: 1-1
Lnl-East
............................................................................................................................. ... ...
9 10 4 5 6 7 B Daily Wkday wend
Time Sun Mon Tue Wed Thu Fri Sat Avg. Avg. Avg.
_ _____ _____ _____ ------- ------- .......
J1:00 - - 27 27 - - - 27 21 0
:12:00 - - 6 13 - - - 10 10 0
u3:00 - - 9 B - - - 9 9 0
:;I: 00 - - 5 / - - - 6 6 0
05:00 - - 14 7 - - - 11 11 0
�'6:00 - - 39 31 - - - 35 35 0
J1:0G - - 72 69 - - - 71 71 0
39:00 - - 1B7 - - - - 107 197 0
09:00 - - 197 - - - 121 197 0
10:00 - - 261 - - - - 261 261 0
11:00 - - 253 - - - - 263 263 0
12: 00 - - 341 - - - - 341 341 0
13: 00 - - 405 - - - - 405 405 0
14:00 - - 410 - - - - 410 410 0
15:00 - - 415 - - - - 415 415 0
16:00 - - 360 - - - - 368 368 0
17:00 - - 461 - - - - 461 461 G
18:00 - - Ale - - - - 476 478 0
19:DO - - 273 - - - - 273 273 0
20:00 - - 201 - - - - 201 201 0
71:00 - - 152 - - - - 152 152 0
22:00 - - 177 - - - - 127 127 0
23:00 - - 65 - - - - 65 65 0
14:00 - - 41 - - - - 41 41 0
---- .---- ---- ---- ---- ' — ----- ----- -------
Totals - - 4817 162 - - 4812 4812 0
.....--------------------------------- .----------- ....--------- .------------------------------------ .._...._------.__.-.-....___..__
A Avg WuLay - - 100.1 3.4 - - -
A Avg Day - - 100.1 3.4 - - -
AM Peak Nr None More 12:00 07:00 None None None
AM Court - . 341 69 - -
PH Peak Hr None None 10:00 None None None None
PH Count - - 478 - - - -
............................................................................... ..
CITY OF FORT COLLINS
TRAFFIC OPERATIONS SYSTEM DESIGN AMC MONITORING
02.05-1991 — Weekly Gunmary For Week Of February 4, 1907 ... 00:21 Pg 1
r'Ile: 90297002.PRI1 Slat 000000010308 To: n000a0000m 13/ C.1d: 01
City/loin: FORT COLLINS County: LARINER
Location: BOARDWALK E/O DFK WESTBOUND Ft.l: Lane
Lane/6: 1-1
nl-Meat
---------------------------------- ____------- ___._.__..........................------__---____.._..------._._....--
9 1G 4 5 6 7 B DailyAdaWkenO
Time Sun Mon Tue Wed Thu Fri Sat Avg. Avg. Avg.
..... ----- ----- ----- ----- ----- ----- ----- ------- ....... _...—
01:00 - - 13 11 - - - 12 12 0
02:00 - - 6 9 - - - 8 a 0
02:00 - - 10 6 - - - 0 8 0
I14:00 - - 4 2 - - - 3 3 0
I15:00 - 0 8 - - - B B 0
06:00 - - 25 29 - - - 27 27 0
01:00 - - 91 93 - - - 92 92 0
08:00 - - 362 - - - - 362 367 0
09:00 - - 28B - - - 28B 268 0
10:00 - - 309 - - - - 309 309 0
13:00 - - 329 - - - - 329 329 0
12:00 - - 462 - - - - 462 462 0
13:00 - - 447 - - - - 447 447 0
14:00 - - 426 - - - - 426 426 0
15:00 - - 403 - - - - 403 403 0
16:00 - - 422 - - 422 422 0
17:00 - - 480 - - - - 400 480 0
18:00 - - 523 - - - - 523 523 0
19:00 - - 385 - - - - 365 US 0
20:00 - - 251 - - - - 251 251 0
21:00 - - 143 - - - - 143 143 0
22:00 - - 09 - - - - 99 Be 0
23:00 - - 64 - - - - 64 64 0
24:00 - - 25 - - - - 25 25 0
..-'- ----- ----- ----- -_-- ----- ----- ----- ------- ....... -------
Tdtale - - 5565 ISO - - - 5566 5566 0
....................................................................................................................................
4 Avg welay - - 100.0 2.6
4 Avg pay - - 100.0 2.9 - - -
AM Peak Nr None None 12:00 07:00 Mon, Ndne More
An Count - - 462 93 - -
PM Peak Hr None None 16:00 None None None None
PM Count - - 523 - - - -
CITY OF FORT COLLINS
T RAF IC OFF RATIONS SYSTEM OCS IGN AND MONITORING
of 05. 1997
— weekly Sunury For week 01February
4, 1997 ",
08:21
Py 1
....................................................................................................................................
•ile: 90297003.PRN
Ste: 000000010306
id: OOOOOUOUGHC at
COmmld: 01
Aty/7own: FORT COLLINS
County: LARIMER
..cation: JFK S/0 BOARDWALK
NORTHBOUND
Font]
Line
,ane/s: 1-1
in) -North
..............................................................................................................................
9 10
4
5
6 7 B
Daily
wkday
.....
Wend
Bloc Sun Mon
..... ..... .....
TUC
.....
Ned
.....
Thu Fri Sat
..... ..... .....
Avg,
Avg.
Avg.
U1:00 - -
9
9
- - -
......_
9
.....
9
------.
0
112: DO - -
3
1
- -
2
2
0
,13:00 - -
2
3
- - -
3
3
0
04:00 - -
2
3
- - -
3
3
0
On: 00 - -
1
2
- - -
2
2
0
J6:00 - -
5
1
- - -
3
3
0
07:00 - -
12
18
- - -
15
15
0
08: 00 - -
39
31
- - -
35
35
0
09: 00 - -
8o
-
- - -
80
60
0
10:00 - -
125
-
- - -
125
125
0
11:00 - -
179
-
- - -
179
179
0
12:00 - -
248
-
- -
248
248
0
t3:00 - -
238
-
- - -
238
238
0
14:00 - -
343
-
- - -
343
343
0
15:00 - -
32D
-
- - -
320
320
0
16:00 - -
276
-
- - -
270
278
0
17:00 - -
296
-
- - -
226
296
0
18:00 - -
367
-
- - -
367
367
0
11:00 - -
215
-
- - -
275
275
0
'U:OU - -
108
-
- - -
IDB
108
0
21:00 - -
81
-
- - -
81
81
D
22:00 - -
50
-
- - -
58
58
0
23:00 - -
30
-
- - -
30
30
0
24:00 - -
----
14
-
- - -
14
14
0
----- ---
mlals - -
'—..
3112
----
Be
----- ----- -----
- - -
----'--
3110
.......
3110
...----
0
Avg "day - -
103.1
^,2
- - -
B Avg Day - -
100.1
2.2
- -
AM Peak Ilr None None
12:00
09:00
None None None
Ah Count - -
240
31
- - -
PM Peek Mr None None
10:00
None
None None None
vM C.Unt - -
.............................................................................................................................
361
-
- - -
......
CITY nF FORT COLLINS
TRAFFIC OPERATIONS SYSTEM DESIGN AND MONITORING
u2 05-1991 All weekly Sunrary For week OF February 3, 1997 ••" 08:33 Py 1
......................................... ............................ .-------- .------ ............... .---------------- '----- ._....._.
File: M0291004.PRN Ste: 000000010302 Id: miloo000ithe 13( Conn, To: O1
'Ily/Town: FORT COLLINS County: LARIMER
location: JFK N/0 BOARWKK SORTHBOUND Foroa t4 Lane
:ene/a: 1-1
Inl-South
........................................... ....------------ .---------------------------- .-------------- .-------------- ...........
..
9 3 4 5 G 7 0 Daily AD, ukend
lime Sun Non rue Wed 11'. Fri Sat Avg. Avg. Avg.
..._ ..... ..... ..... ..... ..._ ._._. .__.. ..--... ....... .......
J1:00 - 7 3 - - - 5 5 0
IY:OC - - 1 2 - - - 2 2 0
JI:OO - - 0 0 - - - 0 D 0
.14: 00 - - 3 0 - - - 2 2 0
M3:00 - - 6 6 - - - 6 6 0
'J6:00 - - 10 10 - - 10 10 0
u7100 - - 32 26 - - - 29 29 0
08:00 - - 79 - - - - 79 79 0
69:0D - - 114 - - - 114 114 a
IU:OO - - 131 - - - - 131 131 0
11:00 - - 179 - - - - 170 178 0
12:00 - - 252 - - - 252 252 0
'AIDED - - 286 - - - - 286 286 0
1.1:00 - 2fi3 263 - - - - 263 263 O
15:00 - 265 235 - - - - 250 250 0
16:00 - 276 262 - - - - 269 269 0
11:00 - 307 321 - - - - 31A 314 0
19:00 - 309 216 - - - - 292 292 0
19:00 - ISO 156 - - - - 157 157 0
10:00 - 117 97 - - - 107 107 0
21:00 - 53 61 - - - - 57 57 0
22:00 - 41 44 - - - - 43 43 0
13:00 - 20 1B - - - - to 19 0
24:00 - 10 B - - - - 9 9 0
-'--- ----- ----- ----- ---- ----- ---- ----- ------- ------- ------
lotsls - 101B 2B40 41 - - - 2973 2073 0
w Avg N1day - 63.3 EGA 1.6 - - -
n Avg Be, - 63.3 91.9 1.6 - - -
AN Peak Nr None None 12: ON 07:00 None None None
AM Count - . 252 26 - - -
I'M Peak Hr None 18:00 17:0G None Wane None None
I'M Count - 308 321 - - -
....................................................................................................................................
BOARDWALK W/O
LANDINGS
EASTBOUND
HOUR ---- QUARTER HOUR ---- HOUR EACH * REPRESENTS 23 VEHICLES
OF DAY let 2nd 3rd 4th TOTAL A DAS33 MEANS HOUR VOLUME < 12
- - - - - - - - - - - - - - - - - - - - - - - - - - ------ -------------------------------
12 AM 7 6 5 3 21
1 AM 2 7 1 4 14
2 AM 1 0 2 1 4 -
3 AM 2 1 0 0 3 -
4 AM 2 2 1 4 9 -
5 AM 4 SO 17 14 45 **
6 AM 23 23 19 33 98 RRkk
7 AM 26 40 51 84 203 *********
8 AM 62 67 61 69 259 ***********
9 AM 87 61 76 83 327
10 AM 81 74 81 91 327 ***kRR%RRk*kkR
11 AM 109 87 117 123 436 ***RRR##kkkkkkRR«##
12 PM 108 144 .123 121 496 **********************
1 PM 152 121 109 112 494 *************RkRkkk«k
2 PM 113 115 124 136 490
3 PM 102 140 133 149 524 ******************#***#
4 PM 138 128 123 171 560 ********#**k*k**#k#k#kk#
5 PM 173 148 156 108 585 ******************k##kkRk
6 PM 105 97 78 65 345 ***************
7 PM 78 52 46 63 239 **********
8 PM 48 44 43 42 177 ********
9 PM 48 22 32 29 131 ******
10 PM 26 19 8 11 64 ***
11 PM 13 4 12 4 33
TOTAL VOLUME IS 5,884 VEHICLES.
PEAK HOURS:
MORNING PEAK HOUR VOLUME OF 436 BEGINS AT 11:00 AM ( 7 $)
EVENING PEAK HOUR VOLUME OF 648 BEGINS AT 4:45 PM ( 3.1 $)
BOARDWALK E/O
LANDINGS
WESTBOUND
HOUR ---- QUARTER HOUR ---- HOUR EACH * REPRESENTS 20 VEHICLES
OF DAY 1st 2nd 3rd 4th TOTAL A DASH MEANS HOUR VOLUME < 10
------ ----- ----- ----- ----- ------ -------------------------------
12 AM 11 3 1 7 22
1 AM 2 1 0 1 4
2 AM 5 1 2 2 10
3 AM 1 1 2 0 4 -
4 AM 1 2 1 7 11
5 AM 3 4 9 12 28
6 AM 15 22 25 54 116 ******
7 AM 54 80 96 133 363
8 AM 103 92 98 67 380
9 AM 82 75 85 95 337
10 AM 64 65 97 90 316 RkkkRR%kR#kRR%kR
11 AM 84 106 105 117 412 *xx"*k*kR%k%RRRRRR:f Rk
12 PM 113 103 113 114 443 **"***Rk#kkkkR«RRR«#RR
1 PM 112 103 112 100 427 kkk%%kkkkkRRRRkRRkkkk
2 PM 112 102 110 113 437
3 PM 108 103 125 127 463 ****kk#RR#kRk##kRkRR#R#
4 PM 118 106 144 149 517 #kkRkkkR%*RkkR#kk**k*kkk*R
5 PM 124 132 115 113 484
6 PM 119 105 69 91 384
7 PM 63 55 57 33 208
8 PM 42 52 39 44 177 kzk#zRkzk
9 PM 35 21 33 18 107 *****
10 PM 32 27 12 12 83 ****
11 PM 14 7 10 7 38 **
TOTAL VOLUME IS 5,771 VEHICLES.
PEAK HOURS:
MORNING PEAK HOUR VOLUME OF 426 BEGINS AT 7:45 AM ( 7 %)
EVENING PEAK HOUR VOLUME OF 549 BEGINS AT 4:30 PM ( 10 %)
DATA COLLECTION BEGAN AT 12AM ON WEDNESDAY, JANUARY 22, 1997. DATA COLLECTION BEGAN AT 12AM ON WEDNESDAY, JANUARY 22, 1997.
LANDINGS S/O
BOARDWALK
NORTHBOUND
HOUR
----
QUARTER
HOUR
----
HOUR
EACH * REPRESENTS 4 VEHICLES
OF DAY
1st
2nd
3rd
4th
TOTAL
A DASH MEANS HOUP VOLUME < 2
------
12 AM
-----
0
----- -----
0
-----
0
0
------
0
--------------------------------
-
1 AM
0
0
0
1
1
-
2 AM
0
0
0
0
0
-
3 AM
0
0
0
0
0
-
4 AM
0
0
0
0
0
-
5 AM
0
0
1
0
1
-
6 AM
1
1
2
6
10
***
7 AM
2
4
6
8
20
*****
8 AM
4
11
20
11
46
************
9 AM
17
17
13
8
55
******x***xRkR
10 AM
12
14
21
22
69
*****************
11 AM
16
22
18
16
74
*xx*Rxxx«Rxxfi RRxx*k
12 PM
18
20
17
15
70
*fiRzx**wkxRR*Rw«kR
1 PM
20
29
19
17
85
*****fi RRkRRkxRRfi%****
2 PM
26
10
17
23
76
zxxRxkxxxRkk*R*«h*x
3 PM
11
11
17
20
59
*******kk*kRxxx
4 PM
17
16
20
16
69
************k**k*
5 PM
18
15
11
10
•54
**************
6 PM
9
12
3
9
33
********
7 PM
7
5
4
6
22
xfi xfi xx
8 PM
6
4
1
2
13
***
9 PM
6
1
2
2
11
***
10 PM
0
0
1
1
2
11 PM
2
1
0
0
3
TOTAL VOLUME
IS 773
VEHICLES.
PEAK HOURS:
MORNING PEAK
HOUR
VOLUME OF
83 BEGINS
AT 10:30 AM ( 11 %)
EVENING PEAK HOUR
VOLUME OF
91 BEGINS
AT 1:15 PM ( 12 %)
DATA COLLECTION BEGAN AT 12AM ON WEDNESDAY, JANUARY 22, 1997.
LANDINGS N/O
BOARDWALK
SOUTHBOUND
HOUR
----
QUARTER
HOUR
----
HOUR
EACH * REPRESENTS 7 VEHICLES
OF DAY
1st
2nd
3rd
4th
TOTAL
A DASH MEANS HOUR VOLUME < 4
------
12 AM
-----
1
----- -----
1
2
-----
1
------
5
------------------------------
1 AM
0
1
1
1
3
-
2 AM
2
1
1
1
5
3 AM
2
1
1
1
5
4 AM
1
0
1
0
2
-
5 AM
5
5
5
4
19
***
6 AM
6
6
8
7
27
****
7 AM
22
25
21
19
87
************
8 AM
27
27
27
27
108
xkwfi Rzxfi hzRxfi*«
9 AM
29
27
31
32
119
*****************
10 AM
35
35
35
35
140
****xR*««RRxxxzxRRk#
11 AM
46
46
45
45
182
**************************
12 PM
48
49
45
53
195
1 PM
50
50
50
49
199
2 PM
46
45
46
45
182
*****««k««*k«««*khk*k#***k
3 PM
51
50
50
50
201
*****Rz«kxkx*««xR«xwzRz«fi zRxz
4 PM
52
52
52
52
208
5 PM
50
50
50
50
200
6 PM
34
34
34
34
136
7 PM
21
21
21
21
84
*RxxRxxzzkk*
8 PM
20
20
20
20
00
***********
9 PM
13
10
10
10
43
******
10 PM
3
4
3
4
14
**
11 PM
3
3
3
2
11
**
TOTAL VOLUME
IS 2,255 VEHICLES.
PEAK HOURS:
MORNING PEAK HOUR
VOLUME OF
182 BEGINS AT 11:00 AA ( 8 $)
EVENING PEAK
HOUR
VOLUME OF
208 BEGINS AT 4:00 PM ( 9 $)
DATA COLLECTION BEGAN AT 12AM ON WEDNESDAY, JANUARY 22, 1997.
APPENDIX A
n
VII. CONCLUSIONS
Thi$ study assessed the potential impacts of the High Point Office
Park near Boardwalk Drive and Landings Drive in Fort Collins,
' Colorado. As a result of the analysis, the following conclusions
were drawn:
The potential impacts of the proposed project were evaluated at the
following intersections: Boardwalk/JFK, Boardwalk/Landings,
Boardwalk/High Point (proposed north access drive), Boardwalk/
Troutman, Boardwalk/proposed south access drive.
The traffic impact analyses were performed for existing conditions
and future Years 2000 and 2015. Future background traffic
conditions without the project and total traffic conditions, with
completion of the proposed project, were evaluated.
' Under existing conditions, each of the study intersections are
currently operating at an acceptable level of service with the
exception of the northbound movements from Landings Drive to
Boardwalk Drive. The City of Fort Collins is currently considering
modifications to this intersection, which would remove the
northbound and southbound left -turn and through movements.
' For Year 2000 background and total traffic conditions, the study
intersections are projected to operate at acceptable levels of
service. It is not anticipated that traffic from the proposed
' project would significantly impact the traffic operations at the
study intersections.
For Year 2015 future background and total traffic conditions, the
' study intersections are projected to operate at acceptable levels
of service with the following exceptions: the eastbound traffic
at High Point Drive, and the eastbound left turn from Troutman.
In urban, areas as traffic volumes on collector and arterial streets
increase, delays to left -turn movements to these roadways will
increase. The traffic at each of these locations would have
opportunities to utilize alternative routes. No intersection
improvements would be required due to the proposed project traffic.
' Pedestrian access to and from the proposed High Point Office Park
is good. However, there are several gaps within the sidewalk
system in the area surrounding the project site. Most of these
gaps will be eliminated with the development of vacant parcels.
' Bicycle facilities are present within the entire study area. The
project site will be directly connected to these facilities.
Currently, transit service to the study area, which is provided by
' Route 1, is operating at an acceptable level of service. It. is
anticipated that this level of service will be maintained or
improved in the future.
W
TABLE 4
Year 2015 Intersection
Operation
Level
of Service
Intersection
AM
PM
Background Traffic
Boardwalk/JFK (signal)
B
B
Boardwalk/Landings (stop sign)
NB . RT
A
B
SB RT
A
B
EB LT
A
B
WB LT
A
A
Boardwalk/High Point (stop sign)
WB LT/RT
B
C
SB LT
A
B
Boardwalk/Troutman (stop sign)
EB LT
C
E
EB RT
A
B
NB LT
A
A
Total Traffic
Boardwalk/JFK (signal) B B
Boardwalk/Landings (stop sign)
NB RT
A B
SB RT
A B
EB LT
A B
WB LT
A B
•Boardwalk/High Point/Access (stop sign)
EB LT/T/RT
C E
WB LT/T/RT
B D
NB LT
A A
SB LT
A B
Boardwalk/Troutman (stop sign)
EB LT
C E
EB RT
A B
NB LT
A A
Boardwalk/South Access (stop sign)
EB LT/RT
B C
NB LT
A A
24
TABLE 3
Year 2000 Intersection
Operation
Level
of Service
Intersection
AM
PM
Background Traffic
Boardwalk/JFK (signal)
B
B
Boardwalk/Landings (stop sign)
NB RT
A
B
SB RT
A
B
EB LT
A
B
WB LT
A
A
Boardwalk/High Point (stop sign)
WB LT/RT
B
C
SB LT
A
A
Boardwalk/Troutman (stop sign)
EB LT
C
C
EB RT
A
B
NB LT
A
A
Total Traffic
Boardwalk/JFK (signal) B B
Boardwalk/Landings (stop sign)
NB RT
A B
SB RT
A B
EB LT
A B
WB LT
A A
Boardwalk/High Point/Access (stop sign)
EB LT/T/RT
B D
WB LT/T/RT
B C
NB LT
A A
SB LT
A A
Boardwalk/Troutman (stop sign)
EB LT
C C
EB RT
A B
NB LT
A A
Boardwalk/South Access (stop sign)
EB LT/RT
B C
NB LT
A A
23
factor of 1.0. Based upon the criteria set forth by the City of
..Fort Collins, the project site is located within an area defined
as the "remainder of service area". Currently the level of service
is LOS D, which is acceptable for this service area. It is
anticipated that this level of service will be maintained or
improved in the future with implementation of the City's Transit
.Development flan.
n
n
22
PEDESTRIAN LEVEL OF SERVICE
The pedestrian activity associated with the proposed project would
be related to the following: individuals who work at the future
' office park and live within the adjacent neighborhood, and
individuals who work at the office park and are destined to
adjacent commercial facilities, such as banks and restaurants.
' Most'of the adjacent neighborhoods have good pedestrian facilities
which provide connections to the proposed office park. Those
individuals living to the east of the site must cross Boardwalk
' Drive. This crossing could occur at the pedestrian crosswalks a.t
either Breakwater Drive or Westshore Way. Those pedestrians living
north of these crossing would have to cross Boardwalk at unmarked
locations. The need for additional crossing facilities for these
' individuals is unknown because the demand would not be determined
until after completion of the project. It is anticipated that no
additional crossings would be necessary. However, this should be
' re-evaluated after completion of the project. It would appear that
a pedestrian crossing of Boardwalk Drive, similar to those at
Westshore Way and Breakwater Drive, could be painted at Landings
' Drive and/or High Point Drive. Signalized pedestrian crossings of
Boardwalk Drive are not recommended. As mentioned earlier, there
are some gaps within the sidewalk system to the north of the
project site. These gaps exist either adjacent to undeveloped
' parcels or adjacent to residential areas which were designed
without sidewalks. It is anticipated that the sidewalk system will.
be completed as development occurs on undeveloped parcels. Near
' the residential. area (on the east side of Landings, south of.
Horsetooth), there are sidewalks on the opposite side of Landings
Drive. gaps in the off -site sidewalk system are not the
' responsibility of this development.
,Pedestrian access to the adjacent commercial areas, primarily to
the,west of the project site, is good. There are sidewalks within
' this area and the route is very direct and continunus. It is
concluded that the pedestrian level of service is acceptable.
BICYCLE LEVEL OF SERVICE
There are bicycle facilities within the entire study area. The
bicycle level of service to/from the proposed office park to
adjacent areas is acceptable.
TRANSIT LEVEL OF SERVICE
' The current transit level of service is determined based upon the
following: the 12 hours of weekday service, 30 minute headways, a
travel time factor of 2.0 to 3 of the 4 specific destinations
suggested in the "Level of Service Manual," and the peak load
21
VI. TRANSPORTATION IMPACT ANALYSIS
The previous chapter described the development of future traffic
forecasts both with and without the proposed project. Intersection
capacity analyses are conducted in this chapter for both scenarios
to assess the potential impact of the proposed project generated
traffic on the local street system.
TRAFFIC ANALYSIS - YEAR 2000
The peak hour background and total traffic volumes for Year 2000,
illustrated on Figures 4 and 7 respectively, were analyzed to
determine the intersection delay and corresponding level. of
service. Table 3 summarizes these results for Year 2000 background
and total traffic conditions. Calculation forms are provided in
Appendices D and E, respectively.
As indicated in Table 3, the traffic movements at each of the study
intersections are projected to operate at an acceptable level of
service under future traffic conditions for Year 2000. As
mentioned earlier, within the City of Fort Collins, the minimal
'acceptable level of service is LOS D or better.
TRAFFIC ANALYSIS - YEAR 2015
' The,Ye,ar 2015 peak hour traffic, volumes for background and total
traffic -conditions were analyzed to determine the intersection
delay and corresponding level of service. Table 4 summarizes these
' results. Calculation forms are provided in Appendices F and G,
respectively.
The level of service analysis shown in Table 4 indicates that the
study intersections will continue to operate at acceptable levels
of service, with the following exceptions: the eastbound traffic
at High Point Drive, and the eastbound left turn from Troutman.
It should be noted that, in urban areas as traffic volumes on
collector and arterial streets increase, delays to minor street
left -turn movements onto these roadways increase. The eastbound
traffic exiting the proposed project site at High Point Drive are
projected to experience delays. However, the site plan was
designed such that this traffic would have the option of utilizing
the south access drive which is projected to operate in the long
range future with acceptable operating conditions. The eastbound
left turn at Boardwalk and Troutman is projected to operate with
long delays under both background and total traffic conditions for
Year 2015. As mentioned above, this is a typical condition in
urban settings. A review of the future total traffic projections
also indicates that very few vehicles will experience these long
delays.
20
N
4
J 00 0� / r\sS/1p4g0
90/1 pS Se ��'`
`00��1�C'
•� m q� 5
0-
���h\h
Q
O rr s s
!ems 9
Site
♦�.�
AM/PM
Rounded to the Nearest
5 Vehicles.
TOTAL PEAK HOUR TRAFFIC -
YEAR 2015
,N
5/20
5125 �
w
o 0
rn
to
C"
0
o s
�s s
Z°
5a ti o 0
Figure 8
19
co
z�
�a
o�
�3'SiZss
rss 854zs
i
Site
AM / PM
Rounded to the Nearest
5 Vehicles.
TOTAL PEAK HOUR TRAFFIC -
' YEAR 2000
18
Figure 7
1
V. FUTURE TOTAL TRAFFIC PROJECTIONS
' The future total traffic projections reflect future traffic
conditions with the traffic from the proposed High Point Office
Park project. The future total traffic projections were developed
for Years 2000 and 2015.
TOTAL TRAFFIC - YEAR 2000
' The total traffic for Year 2000 was developed by adding traffic
from the proposed project to the background traffic for Year 2000.
The resulting peak hour- total traffic projections for Year 2000 are
shown on Figure 7.
,TOTAL TRAFFIC - YEAR 2015
' The total traffic for Year 2015 was developed by adding traffic
from the proposed project to the background traffic for Year 201.5.
The resulting peak hour total traffic projections for Year 2015 are
shown on Figure 8.
17
Imop
\♦
Site
-..�
AM / PM
3�20
v+ 4'
A&
N
SITE GENERATED PEAK HOUR TRAFFIC
16
Figure 6
a
Land Use
Office - 55 KSF
TABLE 2
Trip Generation
Daily
Trips
910
15
A.M. Peak
Trips Trips
in out
107 13
P.M. Peak
Trips Trips
in out
20 100
IV. PROJECT TRAFFIC PROJECTIONS
Development of traffic projections for the proposed High Point
Office Park project involved the following steps: estimation of
trip generation, development of a trip distribution, and assignment
of traffic to the roadway system.
TRIP GENERATION
' Standard traffic generation characteristics compiled by the
Institute of Transportation Engineers in their report entitled Trip
Generation, 5th Edition, 1991, were utilized to develop trip
' generation estimates for the proposed. High Point Office Park. The
ps'timated trip generation is shown in Table L. Land use code 710
•(General Office) was used to determine the trip generation. A
vehicle trip is defined as a one-way vehicle movement from a point
of 'origin to a point of destination.
' TRIP DISTRIBUTION
The overall directional distribution of the site generated traffic
was determined based on the location of the site within the City
of Fort Collins and the existing traffic patterns and system in
this area. The trip distribution used in the subsequent traffic
' assignment is as follows:
approximately 30 percent to the north on JFK and Landings,
' approximately 30 percent to the south on Boardwalk,
approximately 30 percent to the west on Boardwalk, and
approximately 10 percent to the west on Troutman.
' TRAFFIC ASSIGNMENT
Traffic assignment is how the generated and distributed trips are
' expected to be loaded on the roadway network. The site generated
trip assignments are shown on Figure 6.
1 14
co
-0At
=Q
Site
AM/PM
Rounded to the Nearest
5 Vehicles.
Access „ _ _
BACKGROUND PEAK HOUR TRAFFIC -
' YEAR 2015
N
Figure 5
A.
�T
k�
410
,0
a�
I
�♦ Site
AM/PM
Rounded to the Nearest
5 Vehicles.
w
BACKGROUND PEAK HOUR TRAFFIC -
YEAR 2000
N
Figure 4
12
BACKGROUND TRAFFIC — YEAR 2015
Future projections of background traffic for Year 2015 were
developed by factoring the existing traffic to account for overall
' 'growth and adding traffic from proposed developments.
Area Wide Traffic Growth
' An overall growth in traffic of approximately 1.5 percent annually
was applied to the study intersections. The existing traffic
' volumes were adjusted upward by a total of 1.3 to reflect this area
wide growth.
Traffic From Nearby Pro'ects
The Landings Office Park development project, mentioned in the Year
' 2000 analysis, was accounted for in the Year 2015 analysis.
Background Traffic Year 2015
The peak hour background traffic for Year 2015 is depicted on
Figure 5. As mentioned above, this was developed by factoring
existing traffic to account for growth near the study area and
adding traffic from nearby developments.
1 11
III. FUTURE BACKGROUND TRAFFIC PROJECTIONS
' In order to properly evaluate the potential impact of the proposed
High Point Office Park project on the local traffic conditions,
future traffic volumes were first estimated for the study area
without the project. These future forecasts reflect the growth
' that, is expected from overall development in and around the City
of Fort Collins and from proposed projects in the vicinity of the
project site.
BACKGROUND TRAFFIC - YEAR 2000
The growth reflected in Year 2000 Background Traffic is based on
two factors: general area growth, and traffic generated by
specific projects located near the study intersections.
Future Roadway_System
It was assumed that the intersection of Boardwalk and Landings
would be modified to eliminate the northbound and southbound left -
turn and through movements.
Area Wide Traffic Growth
' Based upon historical traffic growth and information within the
North Front Range Regional Transportation Plan, October 1994, it
' was determined that traffic within the study area has increased by
approximately 1.5 percent per year.
Traffic From Nearby Proiects
Based upon data available from other traffic studies, the following
project is planned within the short range future: the Landings
Office Park development, located on the north side of Boardwalk.
This development is currently under construction.
Background Traffic - Year 2000
The peak hour background traffic for Year 2000 is depicted on
Figure 4. As mentioned above this was developed by factoring
existing traffic to account for overall qrowth within the area and
accounting for traffic from other proposed projects near the study
area.
10
TABLE 1
Existing Intersection
Operation
Level
of Service
Intersection
AM
PM
Boardwalk/JFK (signal)
B
B
Boardwalk/Landings (stop sign)
NB LT/T/RT
B
F
SB LT
C
E
SB T/RT
B
B
EB LT
A
B
WB LT
A
A
Boardwalk/High Point (stop sign)
WB LT/RT
B
C
SB LT
A
A
Boardwalk/Troutman (stop sign)
EB LT
B
C
EB RT
A
B
NB LT
A
A