HomeMy WebLinkAboutPROMONTORY - PDP - 32-99 - CORRESPONDENCE - REVISIONS12. Letter of intent from Post Office regarding off -site drainage easement has
been submitted.
13. See #11 above.
14. Import of structural dirt onto the site is as per a specific agreement
between the applicant and the owner of the property, which is the City of
Fort Collins, which agreement has been ratified by City Council.
15. Immediately upon realization that there was a fox den just west of the
project site along the existing ditch, we a) prohibited any trucks from
driving along the north side of the ditch bank, b) put orange construction
flagging at both the east end of the ditch access road (along the north of
the ditch) and also at the west end at JFK.
a. Put a sign on each such fence indicating "Fox Den Protected Area
— Please do not walk into this area with or without pets. Thank
you."
b. All dirt import operations including trucking the dirt in will occur only
from the north end of the site and well away from the fox den.
16. If necessary with regard to modification requests, plan will provide
showing how project would look if it met the intent of LUC.
17. Detached garage structure will be designed to comply with LUC
requirements or a modification requested.
18. Site, landscape and building elevations plant comments will be satisfied in
our final submittals.
Thank you for your favorable consideration and recommendation of this project.
J P/vd
Lagunitas Companies
3307 S. College Avenue, Suite 200, Fort Collins, CO 80525
970-226-5000•fax 970-226-5125
To: Steve
From: Jon
Date: May 18, 2000
Re: Promontory Project / Response to 5/3/00 Comments
1. Written consent of Larimer Canal #2 Ditch Company has been submitted.
2. Eight residential parking spaces will be signed as residential, building
elevations will be modified to show building mounted lighting where
relevant, no number level will be clarified regarding draft enclosure gates,
topography lines will be removed from final site plan, plant note #5 will be
modified as requested.
3. All red lined plans will have/be responded to and have been resolved,
including Advance Planning.
4. Changes will be made in response to Public Service comments.
5. The Storm Water will be responded to and satisfied in final submittals.
6. All Engineering comments have been/will be responded to.
7. Applicant has clarified with Advance Planning that rear walkways from
rear of residential buildings will not be provided for reasons we have
discussed and documented and that our modification request is written
broadly enough with regard to the connecting walkways requirement to
include buildings A, B and F.
8. Transportation planning is pleased with internal pedestrian circulation
parking lot/auto/pedestrian separation and connectivity to street sidewalk
system. Thank you.
9. Mapping comments will be satisfied in final submittal.
10. Ditch company will approve and sign the subdivision plat and has written
us a letter of intent indicating their satisfaction with the project and
requirements, which our plan meets.
11. Letter of intent from the ditch company has been submitted.