HomeMy WebLinkAboutPROMONTORY - PDP - 32-99 - SUBMITTAL DOCUMENTS - ROUND 2 - REVISIONSV4 There will be no basements in any office building. Office building 5 will be of the same character and architecture as represented in the other elevations with some adjustments as required to accommodate the two "notches" in the building to allow building to fit appropriately on the site. All ditch company requirements in terms of respecting their easement, setback from their ditch, and ditch maintenance and accessibility have been addressed and we are within their requirements and parameters in general, subject to its approval of specific grading plans and engineering drawings. Sincerely, J ro , President J P/vd Enclosure All fire lane requirements requested by Poudre Fire Authority have been complied with including 20' project entrances and 16' project exits (minimum width). Fire lanes will be marked with signage in the same fashion as in the Landings Bay project. All utility engineers have been/will be met with to discuss the specifics of each respective utility needs in terms of locations and all other requirements. Also utility coordination meetings will be scheduled shortly. Comprehensive soil testing has been done on the site and engineering of all improvements has been and is being completed with consideration for meeting requirements for a) stabilizing and/or eliminating expansive soils on site where relevant, b) maximizing grade to assure that water on hard surface flows efficiently off site, and c) minimizing sprinkle irrigation where same might possibly infiltrate into subsoil. Pedestrian flow to and within site has been designed to comply with suggestions from transportation and planning. No walks will occur to the back of residential buildings C, D and F, because there are no exits or entrances for them to connect to or from out the backs of these buildings. Office building 4 now opens onto a walkway which connects to street sidewalk via three different distinct pedestrian routes. All other transportation and planning questions have been complied with and/or resolved. The sight distance and parking lot setback design questions have been worked out based on the "as -built" design reality of Boardwalk with the approval of engineering and transportation. They will be further addressed with a variance request as required. All residential and office parking requirements have been met. "Tandem Parking" has been removed from parking calculation. Applicant has written the people who attended the first neighborhood meeting to make them aware of the project and how their concerns have been addressed, and furthermore will continue to address with them the neighborhood questions of the traffic volume and speed on Boardwalk and the difficulty of making a left turn when proceeding south from Landings Drive out onto Boardwalk and what can be done to alleviate this circumstance. All buildings will meet building height requirements and additional shadow analyses will not be required. The maximum office building floor area is only achieved in the event that two or three buildings are joined together as is shown in the optional office elevations. elaborated in the landscape plan, the pedestrian flow plan and slides, which will be presented at P&Z. Front -facing Facades to Maximum Extent Practicable — Because of a) the unique mixed use office — residential nature of this project, b) the unusual configuration of the site and access restraints, and c) our design philosophy of having a group of five residential units arranged around and fronting onto a central park —courtyard, and in addition five small office buildings fronting each other across central parking and landscape areas, we have consistent with these considerations planned front facades of buildings to face Boardwalk "to the maximum extent practicable". Restated, our primary planning and design focus has been to achieve the paramount intents and purposes of the LUC, and create a functional and aesthetic project which achieves the objectives of sense of community, pedestrian -friendliness, public safety, social interaction, and quality of life. Accordingly and in consideration of our design philosophy relating to the central park — courtyard concept (as described in the foregoing paragraph 3 and further described in the attached Statement of Planning Objectives), front facades of buildings face Boardwalk "to the maximum extent practicable". Furthermore, all buildings in this project, both residential and office, have been planned to reflect a consistent relationship of buildings to the street sidewalk and visually continuous pedestrian -oriented building elevations with no vehicle use between buildings and street. The trash enclosures have been designed with adequate room for recyclable bins. Four trash enclosures have been provided which based on our research are more than adequate for meeting the needs of this project approximately as follows with some possible cross -over between buildings and trash enclosure usage: South residential trash enclosure services buildings A, R and F. West residential trash enclosure services buildings C, D, and E. East office trash enclosure services buildings 1, 2, and 3. West office trash enclosure services buildings 4 and 5. Planting will be added along the west side of residential buildings C and D, however two limitations must be respected: the underground storm drainage pipe and the west project boundary grading -landscape wall. In fact the view to the west is an attractive view primarily of the post office's open -space and detention pond, and also mountain views to the southwest. All other zoning comments have been complied with and are reflected in our resubmitted plans. All building inspection comments have been and will be complied with. Lagunitas Park Place, Inc. 3307 S. College Avenue, #200 Fort Collins, CO 80525 970-226-5000 Fax:970-226-5125 November 23, 1999 Mr. Steve Olt, Planner Planning Department, City of Fort Collins P. O. Box 580 Fort Collins, CO 80522 Re: Park Place PDP Dear Steve, In response to your letter of October 28th including your comments, the project comment sheets from various departments and the red lined plans, a) we have met with various departments as necessary to review comments, concerns and proposed solutions, and b) furthermore our specific responses are as follows: An updated modification request is enclosed requesting an increase of residential uses on this transitional site from 25% of the gross area of the development plan to approximately 53% (it was initially submitted to the City with our original application). A blanket easement is being used whereby easements for drainage, utilities and access are permitted on all areas of the site except for specific defined tracts on which buildings are located. The central park -courtyard area is comprised of the entire area between the residential buildings (exclusive of the drive between the garages at the north side). This concept of a central park -courtyard is founded on the notion that it is desirable to minimize concrete, curb and asphalt, and soften them as much as possible allowing them to be adequate for carrying traffic, emergency vehicles, etc. and at the same time allow them to -merge aesthetically and functionally with other green space-hardscape-landscape features of the project and be integrated with one another forming a pedestrian friendly central area fostering sense of community and promoting quality of life. The private drives internal to the project will have very low traffic volumes and will be vehicle -free and open most of the time. Therefore, most of the time the elements of landscape, hardscape, vehicle -ways, parking, driveways, and pedestrian -ways merge sensibly into a functional but aesthetic and pedestrian - friendly matrix. This is the concept of a "central park -courtyard" which is further