Loading...
HomeMy WebLinkAboutPROMONTORY - PDP - 32-99 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWb. Public transit service may soon be provided along Boardwalk Drive. C. Pedestrian connections to adjacent properties and transportation systems (including Troutman Parkway) must be provided. d. Bicycle parking for both the residential and office portions of the development must be provided in convenient, secure locations. Please contact Kathleen, at 224-6140, if you have questions about these comments. 8. If the residential portion of this project is going to comprise more than 25% of the development plan then a modification of the standard as set forth in Section 4.22(D)(1) of the LUC must be requested, and this request for a modification will make the development request a Planning and Zoning Board (Type II) review. 9. A neighborhood meeting should be held for this project before a formal development request is submitted to the City. 10. This development request will be subject to the Development Review Fee Schedule that is available in the Current Planning Department office. The fees are due at the time of submittal of the required documents for the Overall Development Plan (if necessary), Project Development Plan, and Final Compliance phases of development review by City staff and affected outside reviewing agencies. 11. This development proposal is subject to the requirements as set forth in the City's LUC, specifically Articles 2. Administration (Development Review Procedures), Article 3. General Development Standards, and Article 4. [Zoning] Districts. b. The standard utility plans submittal requirements will apply to this development request and a development agreement between the developer and the City will be necessary. The development agreement will be prepared by the Engineering Department near the end of the City's review and approval process. C. Street oversizing fees will apply to this development, with the fees for multi -family residential being approximately $908.00 per dwelling unit and the fees for office uses being approximately $1.75 - $3.70 per square foot of building. Please contact Matt Baker, at 224-6108. d. This development will be responsible for improvements to Boardwalk Drive and (possibly) Troutman Parkway, if it has any frontage along Troutman. e. Access points into this development should align with and be the same widths as existing access points on the opposite sides of adjacent streets. f. A minimum of 200' (horizontal distance) should be maintained between access points into this development and access points on the opposite sides of adjacent streets, as well as to the Troutman Parkway intersection. Please contact Mark, at 221-6750, if you have questions about these comments. 6. Janet Meisel -Burns of the Parks Planning Department stated that both the neighborhood parkland and community/regional parkland fees will apply to this proposed development (for the residential portion only) and the fees will be collected at the time of issuance of building permits. There may be some increase in these fees in 1999. The community/regional parkland fee will go towards development of the Fossil Creek Community Park that is approved. 7. Kathleen Reavis of the Transportation Planning Department offered the following comments: a. A TIS is required for this development proposal and it must address all modes of transportation (vehicle, bicycle, pedestrian, and public transit). 4. Glen Schlueter of the Stormwater Utility offered the following comments: a. The site is located within the McClelland/Mail Creek Basin, where the new development fee is $3,717 per acre, subject to the runoff coefficient. The inventory grid # is 8P. b. The standard drainage and erosion control reports and plans are required and they must be prepared by a professional engineer registered in the State of Colorado. C. The outfall ditch along the west property line needs to remain in its present location or be routed through this development. d. On -site detention is required and the HEART SID drainage report may restrict the detention to 0.87 cfs/acre. If it is not part of that area's requirements then the standard 2-year historic release rate would apply. e. Water quality needs to be addressed and extended detention is the preferred method. f. The multiple detention pond idea works good for water quality extended detention, but Stormwater would caution you that each pond should have a separate outlet. The problem with connecting each pond directly with the upper one flowing through the lower ones is that the water is detained several times so each of the successive ponds needs to be larger. g. The new precipitation rates will apply to this project. Please contact Glen, at 221-6065, if you have questions about these comments. 5. Mark McCallum of the Engineering Department offered the following comments: a. A Transportation Impact Study (TIS) will be required for this proposed development. The study must address the levels of service for all forms of transportation; therefore, you should contact Eric Bracke, at 224-6062, and Kathleen Reavis, at 224- 6140, to schedule a scoping meeting for the purpose of determining the information required with your TIS. 2. Bruce Vogel of the Light & Power Department offered the following comments: a. There is an existing oval electric vault on Boardwalk Drive that can be used to provide power to this development. b. Light & Power wants to be on the interior, to the front of the units. C. The site as shown on the concept plan would be very tight; therefore, a utility coordination meeting should be held. Please contact Bruce, at 221-6700, if you have questions about these comments. 3. Roger Buffington of the Water/Wastewater Department offered the following comments: a. There is an existing 12" water main in Boardwalk Drive that can be tapped into for services to this development. The water main should be looped through this site. b. There is an existing 8" sanitary sewer main in Boardwalk Drive that can be tapped into for services to this development. C. This property is responsible for a repay for the Warren Lake Trunk Sewer. d. There are utility services to this property from Troutman Parkway that must be abandoned back to the mains unless they are used for this development. e. The City's water conservation standards for landscaping and irrigation systems will apply to this development. f. Plant investment fees and water rights will apply to this development and they will be due at the time of issuance of building permits. g. The site as shown on the concept plan would be very tight; therefore, a utility coordination meeting should be held. Please contact Roger, at 221-6681, if you have questions about these comments. DATE: December 14, 1998 ITEM: 4kgit Peint Office/Residential APPLICANT: Jon Prouty Lagunitas Company 3307 South College Avenue Fort Collins, CO. 80525 LAND USE DATA: Request for a mixed -use development containing office and residential uses on approximately 7.7 acres located on the south and west side of Boardwalk Drive between Landings Drive and Troutman Parkway. The property is in the E - Employment Zoning District. COMMENTS: Gary Lopez of the Zoning Department offered the following comments: a. The property is in the E - Employment Zoning District. The proposed office use is a permitted use in the District, subject to an administrative (Type I) review. The proposed residential use would be an administrative (Type I) review unless the residential portion of the development were to exceed 25% of the development plan. If that were the case, a request for a modification of a standard in the Land Use Code ( UC) would be required, automatically turning the development request into a Planning and Zoning Board (Type II) review. b. The property is in the Residential Neighborhood Sign District; therefore, locations for all building signage must be shown on the building elevations. Locations only, not size and content, must be shown. Please contact Gary, at 221-6760, if you have questions about these comments. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT Community Planning and Environmental Services Current Planning City of Fort Collins January 4, 1998 Jon Prouty Lagunitas Company 3307 South College Avenue Fort Collins, CO. 80525 Dear Jon, For your information, ttached is a copy of the Staff s comments concerning the request for the Office/Residential development proposal, which was presented before the Conceptual Review Team on December 14, 1998. This is a request for a mixed -use development containing office and residential uses on approximately 7.7 acres located on the south and west side of Boardwalk Drive between Landings Drive and Troutman Parkway. The property is in the E - Employment Zoning District. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerel, Awclob�_ Steve Olt, Project Planner cc: Stormwater Utility Streets File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 September 28, 1999 Steve Olt, Project Planner Planning Department, City of Fort Collins P.O. 580 Fort Collins, CO 80522 Re: Park Place Project/Response to Conceptual Review Matters Dear Steve, In response to your letter of January 4, 1999, regarding conceptual review comments: 1. The residential portion of the proposed project exceeds 25% of the development plan and the properties located in the E Zoning District, therefore it is a Type II review and our request for a modification is provided under separate cover. 2. Locations of building signs will be designated on residential building elevations. 3. Communication with all utilities engineers is planned as well as a utility coordination meeting to assure that all utility requirements are met and the various utilities are carefully coordinated. 4. This project has no property ownership or frontage on Troutman Parkway. 5. A neighborhood meeting was held and the primary concern was the regional problems of traffic volume and unsafe traffic speeds along Boardwalk. The most satisfactory solution suggested may be a traffic light at Landings and Boardwalk. 6. All other matters raised in the conceptual review comments have been addressed in the various submittal documents. Sincerely, JoVrout JP/vd 3307 South College Avenue, Suite 200, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125