HomeMy WebLinkAboutPOUDRE RIVER BUSINESS PARK 2ND FILING PDP - FINAL PLAT REVIEW - 24-99 - SUBMITTAL DOCUMENTS - ROUND 4 - ROUTING SHEETProject., s Z v-�>
Planner: Zj- -7
Engineer:
Traffic Operations: I ), � Z)
Date: rz�
Items Requested
Engineering Site land I Plat Udli Drainage R t Other Items Re uired
Rediined Items Being Returned
Site land Plat Utility Drainage fl t Other Items Being Returned
itormwater
—
—
Water/Wastewate
—
TraMc Operations
Trans. Planning
Tran*rt
—
Natural Resources
—
—
Park Planning
Totals
Other:
Note: All redlined Items should be returned with the resubmittal/ revisions.
r
Revisions
Routing Sheet
Item: W 2 ¢ 92 ]
�
Date: s. �cz�,
Iry WP'
FILE: PROJECT PLANNER
Z
ENGINEERING: PAVEMENT
ZONING
DRAFnNG • 0����������
----.--------
ADVANCE PLANNING M
R-O.W. PLANNING ------------_
WATER CONSERVATION --M----5----_
• • • .-M--�----.--
---...-----_
PUBLIC ------.------=
------- -�
1 ---_
STATE HIGHWAY EPARTMENT-.---.-------
1 • ---.-.------_
RAILROAD: . o------------_
-------------
=:=-..-------