Dear Mr. Bowie:
For your information, attached is a copy of the Staffs comments concerning the
City Office Building presented before the Conceptual Review Team on March
29, 1999.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6206.
Sin clrely,
Troy J nes
City anner
cc: Bruce Hendee, BHA Designi
Jack Gianola, Facilities Department
Pete Wray, Advance Planning
Mark McCallum, Engineering
Janet Meisel Burns, Park Planning
Eric Bracke, Streets Department
Stormwater Department
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
Advance Planning - Conceptual Review Comments March 29, 1999
Project
t. Fort Collins Office Building
• Length of phase I, II buildings extend more than half the entire block. Will this
preclude an appropriate amount of land for potential library and parking structure
facilities on north portion of block? Should we consider a shorter building footprint?
• Only east/west building access. Architect should consider providing user access on
south and north sides of building. Parking structure will be north of building.
• Mid Block pedestrian connections are extremely important, internal to the block and
leading to adjoining blocks. The Civic Plan shows a strong pedestrian spine
north/south and east/west. The proposed design, although shows a concept for a
public plaza between city buildings fall short as to how these connections continue to
Maple Street as a cohesive design. In addition, the east/west pedestrian connection
proposed locates a very narrow sidewalk between the office buildings and future
parking structure and potential library facilities.
Comm ity Planning and Environmenta. ervices
Current Planning
City of Fort Collins
Jim Bowie
The Neenan Company
2290 E. Prospect Road
Fort Collins, CO 80524
April 7, 1999
Dear Mr. Bowie:
The advanced planning department has forwarded their comments to me for the
conceptual review for the city office building. I'm forwarding these comments to
you so you will have the specific wording of their concerns.
Si erely,
Troy nes
City Planner
cc: Bruce Hendee, BHA Design
Jack Gianola, Facilities Department
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
M. All lighting must be down directional, cut-off, high-pressure sodium light sources.
N. The maximum on -site lighting levels cannot exceed 10 foot-candles in any one
spot, except loading/unloading platforms where it can be 20 foot-candles.
0. The light levels measured 20 feet beyond the property line (adjacent to residential
or public right-of-way) cannot exceed 0.1 foot-candle.
P. Outdoor storage areas must be screened.
Q. Mason is a minor arterial, Laporte is a full arterial. The build -to -line specified that
the building shall:
• Be no further than 15' from the ROW on minor arterials,
• Be between 10' and 25' from the ROW on full arterials.
R. If the height to width ratio exceeds 1:3'on any fagade, a variation in massing is
required as part of the design of that fagade.,
S. Make sure you have architectural building bays articulated no further apart than
every 30' on all facades.
T. Maximum building coverage is 75% in the Civic Center subdistrict.
U. Maximum floor area ratio = 5 in the Civic Center subdistrict.
V. Maximum front yard setback is 15' in the Civic Center subdistrict.
W. Maximum building height is 12 stories or 168 feet, whichever is greater.
K No blank walls that face a public street shall exceed 50 feet.
Y. Buildings shall promote and accommodate outdoor activity, with balconies,
arcades, terraces, decks and courtyards for residents' and workers' use and
interaction to the extent reasonably feasible.
Z. All development shall incorporate the concept of the "civic spine" as described in
the Downtown Civic Center Master Plan, allowing for continuous north -south and
east -west pedestrian connections.
AA. The use of local sandstone is required in all civic buildings, within the
civic center subdistrict, to establish a visual continuity and local sense of place.
BB. New buildings in the Civic Center Subdistrict shall be designed in a
manner that establishes continuity and a visual connection between new and
existing buildings within and adjacent to the Civic Center Subdistrict. The height,
mass and materials of major public buildings shall convey a sense of permanence
and importance.
B. The standard drainage and erosion control reports and plans are required and they
must be prepared by a professional engineer registered in Colorado. The new
precipitation rates have been adopted by City Council.
C. It was stated that the intent is to wait until the Howes Outfall System was
complete. If that changes there is an issue of the temporary detention presently on
the site.
D. Water Quality would need to be addressed and extended detention is the
recommended method. Other methods such as the ones used for the parking
structure could be considered.
E. Onsite detention may not be needed. The design engineer would need to prove
the site drainage beats the peak of the Howes Outfall, otherwise there is a
standard detention requirement.
F. There may be a residual flood plain which has not been mapped. The design
engineer may need to provide the mapping if Stormwater hasn't completed it in
time for this project.
G. Issues of Abacas and eliminating inlets need to be worked through in the design
process with the Water Utilities.
10. Park Planning:
A. Since you intend for the parks department to maintain the interior plaza area, you
will need to coordinate the details of the plaza with Park Planning.
11. Current Planning:
A.
Street tree plantings are required at least every 40' along all street frontages.
B.
"Full tree stocking" must in all areas within 50' of any building.
C.
The trees shown on the landscape plan must satisfy "minimum species diversity"
requirements.
D.
Foundation plantings (minimum 5' wide) are required along 50% of exposed
sections of exterior building wall.
E.
Trees must be placed between street right-of-way and parking lots no further apart
than every 25' along that frontage.
F.
Trees must be placed between parking lots and adjacent lots no further apart than
every 40' along that boundary.
G.
Parking lots must be screened along 70% of the length of the frontage of the street
and other nonresidential uses with a 30" wall, fence, planter, berm, plant material,
or equivalent.
H.
Parking lots with less than 100 spaces require 6% of the area of the lot to be
devoted to landscaping. Lots with more than 100 spaces require 10%.
I.
Dumpsters, loading docks, etc. must be screened.
J.
Bicycle racks must be provided both for employees and customers.
K.
Parking lots must be setback from:
• An arterial — 15' average / 5' minimum point
• A non -arterial — 10' average / 5' minimum point
• A property lot line — 5'.
L.
The maximum allowable parking for this use is 3 spaces per 1000 s.f. of gross
„
leasable floor area.
E. Parking alternatives should be coordinated with Suzanne Edminister of
Transportation.
F. The comer of the building, and the Laporte Ave. fagade have no pedestrian
entrances. Maybe a minor entrance would be appropriate on the Laporte Ave.
fagade. Coordinate this request with Kathleen Reavis of Transportation.
6. Engineering:
A. The street oversizing fee could range from $1.75 to $2.47 per gross square foot of
floor area. Contact Matt Baker for an exact figure.
B. Underground utilities must be coordinated with future phases of development on
this block.
C. The Engineering Department will be extending the sewer lines in Mason up from
the new Courthouse site. Coordinate construction of your utilities with the
Engineering Department's Mason St. sewer extension project. Stub outs should
be provided for your sit at time of sewer extension.
D. Coordinate your timing with the timing of the Howes Outfall project.
E. You have proposed to extend the curb line of Mason Street out 12'. This is not
acceptable. Mason street's bicycle lanes and traffic flows would be impacted too
much by this amount of street narrowing in this area.
F. Your curb cuts off Mason into your parking lot area should align with the
intended location of the curb cut for the access to the future parking garage.
G. A Development Construction Permit will be required.
H. Utility Plans will be required.
I. No Development Agreement will be required.
7. Water/Wastewater:
A. Existing services include a 12" water main in Laporte Avenue, an 8" water main
in Mason, a 12" sanitary sewer in Maple, and an 8" sanitary sewer in Howes.
B. The Howes Outfall might change the location of some of these existing services.
C. Water Conservation standards will apply.
D. Plant investment fees and water rights will be due at the time of building permit.
E. Any existing service lines stubs from the mains into the site must either be used or
vacated.
8. Poudre Fire Authority:
A. Hydrant flow must be 1500g.p.m. at 20 p.s.i.
B. Hydrants must be located within 300' of a corner of your building (measured as a
fire hose would lay).
C. Addresses must be labeled in 6" numerals visible from the street.
D. The retail uses in the parking garage will be fire sprinklered, however the
remainder of the parking structure will require standpipe.
9. Stormwater :
A. This site is located within the Old Town basin where the new development fee is
$4,150/acre which is subject to the runoff coefficient reduction. The site is in
inventory grid #7G
F. There is a required 15' setback from the street right-of-way.
2. Advance Planning:
A. We prefer wide sidewalks to provide a pedestrian comfort zone.
B. Show the diagonal parking on the north side of Maple Street.
C. The mid -block plaza/public space is a major concern.
D. Expand and emphasize the east -west pedestrian access.
E. Be sure to coordinate proper allocation of a realistic amount of adequate space for
a library if it is to also be located on this block.
F. The Civic Center Master Plan calls for retail ground floor uses, particularly on the
comers. A verbal response at the meeting was that it was not in the program and
the existing budget doesn't allow for it. The program must however be
coordinated with all development review criteria, so further discussion on this
issue should be arranged with Pete Wray.
3. Light and Power:
A. Development charges apply.
B. You must submit a commercial C 1 form in order to size transformer.
C. If you intend to get power by extending the line up Mason from the Justice
Center, you will need to coordinate the removal of excess services.
D. The Master Plan of the whole site must be provided to light and power so they
will know where stubs for future expansions will be.
E. Solar powered light poles, if used in the internal plaza, are out of light and
power's jurisdiction.
4. Natural Resources: .
A. You will be required to file a fugitive dust control permit (attached).
B. Reduce the use of bluegrasses, and use native grasses wherever appropriate.
C. Phase 1 and 2 will need and Environmental Assessment.
D. We would like to utilize the design and construction of this building as a
showcase opportunity for a "green" building (contact Suzie Gordon of Natural
Resources):
• Publicize the amount in reduction of greenhouse emissions,
• Examples of where green building materials are being used,
• Consider opportunity to reduce waste stream during construction
(perhaps have an info sign stating how much isn't going to the landfill
as a result in the reduction of the waster stream).
5. Transportation:
A. The Traffic Impact Study (TIS) has already been done, but show how this
building is compatible with the existing TIS.
B. You must determine if the Mason curb changes affect the TIS.
C. You must coordinate the north -south mid -block pedestrian crossing on Laporte
Avenue with the Howes Street Outfall project.
D. You will need coordination meetings with the Civic Center Committee, and the
Transportation Department.
Ct :T. -'`.v Planning and Environn. _ta rvices
Current Planning
MEETING DATE:
ITEM:
APPLICANT:
March 29, 1999
City Office Building
Jim Bowie
The Neenan Company
2290 E. Prospect Road
Fort Collins, CO 80524
LAND USE DATA: A 70,000 s.f., 3 story municipal office building located at the
north-west corner of Laporte Avenue and Mason Street.
DEPARTMENTAL CONTACTS:
Current Planning-
Troy Jones
221-6750
Zoning Department-
Jenny Nuckols
221-6760
Engineering Department-
Mark McCallum
221-6605
Street Oversizing Coordinator-
Matt Baker
221-6605
Poudre Fire Authority-
Ron Gonzales
221-6570
Stormwater Utilities-
Glen Schlueter
221-6681
Water & Sewer Utilities-
Roger Buffington
221-6681
Natural Resources Development Planner
Kim Kreimeyer
221-6750
Light and Power
Alan Rutz
221-6700
Transportation Services
Kathleen Reavis
221-6608
Transfort
Gaylene Rossiter
224-6195
Advance Planning
Pete Wray
221-6754
COMMENTS:
Zoning:
A. The property is in the Downtown (D) zoning district, and in the civic center
subdistrict.
B. Because the project is over 50,000 s.f. it is subject to a Type 2 (Planning and
Zoning Board) review.
C. The Development Standards in Section 4.12(E) of the Land Use Code (LUC)
apply.
D. Take special note of Section 4.12(E)(5) of the Land Use Code, Special Provisions
— Civic Center Subdistrict.
E. Take care to meet all parking, handicap parking, and bike parking requirements.
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
X. No blank walls that face a public street shall exceed 50 feet in length. - Refer to the
architectural elevations provided in the PDP.
Y. Buildings shall promote and accommodate outdoor activity to the extent reasonably
feasible. - An outdoor area has been provided for seating, eating, and relaxing. This area
is located just northwest of the building around the water quality enhancement area
Z. Incorporate the "civic spine" as described in the Downtown Civic Center Master Plan,
allowing for the north -south and east -west pedestrian connections.- The building has been
situated on the site to allow for the civic spines connecting in both directions. The civic
spines will be constructed with future projects that will be located on this block. Refer to
the preliminary master plan which illustrates the future civic spine connections. The
master plan is available in the Facility Services department (contact Jack Gianola).
AA. The use of local sandstone is required in all civic buildings within the civic center
subdistrict to establish visual continuity. - Sandstone is incorporated into various
portions of the building. Refer to the architectural elevations included in the PDP.
BB. New buildings in the Civic Center Subdistrict shall be designed in a manner that
establishes continuity and visual connection between new and existing buildings within
and adjacent to the Civic Center Subdistrict. The height, mass and materials of major
public buildings shall convey a sense of permanence or importance. - Refer to the
architectural elevations included in the PDP to review the building character.
Thank you for your time. Please let us know if we can answer any questions or if you need any
other information.
Thank you,
for bha design, inc.
Roger B. Sherman
bha design, inc.
223-7577
40' along that boundary. - The Howes Outfall runs along the entire western boundary of
this site making it impossible to plant trees within the parking islands on the west side of
this site. Shrubs have been planted in the parking islands to lessen the impacts of the
parking lot.
G. Parking lots must be screened along 70% of the length of the frontage of the street(s). - A
Cheyenne Privet hedge is provided between the parking lot and the adjacent streets.
H. Parking lots with less than 100 spaces require 6% of the area of the lot to be devoted to
landscaping. - Understood.
I. Dumpsters, loading docks, etc. must be screened. - The dumpster will be fully enclosed
with a structure that will be complimentary to the primary building.
J. Bicycle racks must be provided both for employees and customers. - Employee bicycle
parking will be provided within the first floor of the office building. Bicycle racks are
provided along Mason Street and LaPorte Avenue for customers. Refer to the Site Plan.
K. Parking setbacks. - Refer to the PDP Site Plan for proposed parking setbacks.
L. Maximum allowable parking for this use is 3 spaces per 1000 sf of gross leasable floor
area. - This plan provides approximately I space per 1000 sf of gross floor area.
M. Lighting must be down directional, cut-off, high-pressure sodium light sources. - The
City's standard ornamental pedestrian light (which exists at the Transit Center site) uses
a metal halide lamp. This project will incorporate the same ornamental fixture along
Mason, Maple and LaPorte. In order to provide a consistent light source, we have
indicated that the parking lot lights are metal halide fixtures. Pedestrian and parking lot
light fixtures will be down directional.
N. Maximum on -site lighting levels cannot exceed 10 foot-candles in any one spot, except
loading/unloading platforms where it can be 20 foot-candles. - Understood, refer to the
site lighting plan for additional information.
O. Light levels measured 20 feet beyond the property line (adjacent to residential or public
right-of-way) cannot exceed 0.1 foot-candle. - Ornamental light fixtures are being
provided along Mason, LaPorte and Maple as required in the Mason Streetscape
Improvement Plan. These lights cause the light levels in the public right-of-way to exceed
the maximum 0.1 foot-candle.
P. Outdoor storage areas must be screened. - Understood.
Q. Build -to -lines. - 10 setbacks are provided from Mason and LaPorte. These setback are in
compliance with the "build -to -line" requirements.
R. If the height to width ratio exceeds 1:3 on any facade, a variation in massing is required
as part of the design of that facade. - Refer to the architectural elevations provided in the
PDP.
S. Architectural bays articulated no further apart than 30' on all facades. - Refer to the
architectural elevations provided in the PDP.
T. Maximum building coverage is 75% in the Civic Center Subdistrict. - A 25% building
coverage is proposed for this project.
U. Maximum floor area ratio =5 in the Civic Center Subdistrict. - A 0.75 FAR is proposed.
V. Maximum front yard setback is 15 feet in the Civic Center Subdistrict. - A 10' front yard
setback is proposed along Mason and LaPorte.
W. Maximum building height is 12 stories or 168 feet, which ever is greater. - A maximum
building height of 60 feet is proposed.
Mason Street parking lot entrance. Refer to the Site Plan.
C. Addresses must be labeled in 6" numerals visible from the street. - Understood.
D. The retail uses in the parking garage will be fire sprinklered, however the remainder of
the parking garage will require standpipe. - Understood.
9. Stormwater
A. Site located in the Old Town basin where new development fee is $4,150/acre which is
subject to the runoff coefficient reduction. - Understood.
B. Standard drainage reports are required with new precipitation rates. - Understood.
C. Temporary detention may be required if project precedes the Howes outfall. -
Understood.
D. Water quality needs to be addressed. - Extended detention is provided in the water quality
enhancement area as shown on the PDP site and landscape plans.
E. On -site detention may not be need if the engineer could prove that site drainage beat the
peak of the Howes Outfall. - The drainage plan demonstrates that site drainage will beat
the peak of the Howes Outfall.
F. There may be a residual flood plain which has not been mapped. The design engineer
may need to provide the mapping if Stormwater hasn't completed it in time for this
project. - Flood plain mapping will be the responsibility of the Howes Outfall project.
G. Issues of Abacas and eliminating inlets need to be worked through in the design process
with Water Utilities. - Abraxis Glass issue has been resolved. Sear Brown is proposing
that all of the existing inlets be removed.
10. Park Planning
A. Coordinate the details of the interior plaza with Park Planning. - The plaza design
illustrated in the master plan is shown for illustrative purposes only. The programming,
design and detailing of the interior plaza will be coordinated with Park Planning.
11. Current Planning
A. Street Tree Plantings are required at least every 40' along all street frontages. - Street tree
plantings are shown on the landscape plan. - Street tree plantings are illustrated on the
PDP landscape plan for your review. Street trees have intentionally been spaced along
Mason to provide visual access to the main building entrance.
B. "Full tree stocking" must be provided in all areas within 50 feet of any building. - Don't
understand. Please clarify this comment.
C. The trees shown on the landscape plan must satisfy the minimum species diversity
requirements. - The landscape plan has been coordinated with Tim Buchanen and he
feels that the plan meets the minimum species diversity requirements.
D. Foundation plantings (minimum 5' wide) are required along 50% of exposed sections of
exterior building wall. - Foundation plantings have been provided around the majority of
the building.
E. Tree spacing between parking lots and streets right-of-ways shall be no further apart than
25 feet along that frontage. - A hedge and some evergreen trees have been used to lessen
the visual impacts of the parking lot.
F. Trees must be placed between parking lots and adjacent lots no further apart than every
questions.
D. You will need a coordination meetings with the Civic Center Committee, and the
Transportation Department. - Jack Gianola will schedule these meetings.
E. Parking alternative should be coordinated with Suzanne Edminister of Transportation. -
Coordinate this issue with Jack Gianola.
F. The corner of the building, and the LaPorte Ave facade have no pedestrian entrances.
Maybe a minor entrance would be appropriate on the LaPorte facade. Coordinate this
with Kathleen Reavis. - Entrances are not provided for the following due to the space
programming within the first floor of the facility.
6. Engineering
A. Contact Matt Baker for exact street oversizing figures. - Understood.
B. Underground utilities must be coordinated with future phases on this block. - Understood
C. Coordinate construction of your utilities with the Engineering department's Mason Street
sewer extension project. Stub out for this site should be provided at time of sewer
extension. - Understood
D. Coordinate your timing with the timing of the Howes Outfall project. - Understood.
E. Proposal to extend the curb line of Mason Street out 12 feet is not acceptable. - We have
designed the curb to allow for an 8' bicycle lane, one through lane and one-half of the
rail road right-of-way on the west side of the street. This should not constrict traffic flow.
Also it is our understanding that Nolte/Parsons is preparing a striping plan for Mason
Street which will show the new curb alignments in this area. The two projects will be
coordinated.
F. Curb cuts off Mason into the parking area should align with the access to the future
parking garage. - This is difficult because the parking garage has not yet been designed.
We assume that the curb cut will most likely be relocated once the parking garage is
designed.
G. A development construction permit will be required. - Understood, but cost of permits
will be the responsibility of the Engineering Department.
H. Utility plans will be required. - Utility plans are being submitted along with the PDP.
I. No development agreement will be required. - Understood
7. Water/Wastewater
A. Existing service include... - Understood.
B. The Howes Outfall might change the location of some existing services. - Understood.
C. Water conservation standards will apply. - A water quality enhancement area is proposed
northwest of the office building.
D. Plant investment fees and water rights due at time of building permit. - Understood.
E. Existing service line stubs from the mains into the site must either be used or vacated. -
Understood.
8. Poudre Fire Authority
A. Hydrants flow must be 1500 gpm at 20 psi. - Understood.
B. Hydrants must be located within 300 feet of a corner of this building (measure as a fire
hose would lay). - A new fire hydrant is proposed north of the office building near the
C. The mid -block plaza/public space is a major concern. - Please refer to the Preliminary
Master Plan available from Jack Gianola.
D. Expand and emphasize the east -west pedestrian access. - We anticipate that the east -west
pedestrian access included with this project will be removed and replaced by a
wider/more emphasized sidewalk with construction of the future parking garage north of
this office building. Please refer to the Preliminary Master Plan available from Jack
Gianola..
E. Be sure to coordinate proper allocation of space for the library is it is to be located on this
block. - The libraryfoot print shown on the master plan is based upon the preliminary
library drawings.
F. The Civic Center Master Plan calls for retail ground floor uses, particularly on the
corners. Further discussion should be arranged with Pete Wray. - Retail space will not be
provided in the Civic Center Office Building. This item will be discussed within the city
as future development takes place.
3. Light and Power
A. Development charges apply. - Understood.
B. Must submit a commercial CI form in order to size transformer. - Understood.
C. If you intend to get power by extending the line up Mason from the Justice Center, you
will need to coordinate the removal of excess services. - Understood.
D. The master plan of the whole site must be provided to light and power so they will know
where stubs for future expansions will be. - The preliminary master plan is completed
and available in the Facility Services Department (contact Jack Gianola).
E. Solar powered lights, if used, are out of light and power's jurisdiction. - Understood
4. Natural Resources
A. Required to submit a fugitive dust control permit. - Understood.
B. Reduce the use of bluegrass, and use native grasses wherever possible. - Turf areas will
be sodded with a mixture of 100% Tall Fescue blends. Other native grasses may or may
not be incorporated into the water quality enhancement area.
C. Phase I and 2 will need Environmental Assessment. - Copies of the completed
assessments are available at the City of Fort Collins Facility Services department
(contact Jack Gianola).
D. Would like to utilize the design and construction of this building as showcase opportunity
for a "green" building. Contact Suzie Gordon of Natural Resources. - The building is
being designed to meet the "Green Building" concept. Contact Jack Gianola for any
questions.
5. Transportation
A. Show how building is compatible with Traffic Impact Study. - Refer to memorandum
prepared by Matt Delich.
B. Determine if the Mason curb changes affect the TIS. - Refer to memorandum prepared by
Matt Delich.
C. Must coordinate the LaPorte mid block pedestrian crossing with the Howes Outfall
project. -This issue is being reviewed by City Staff. Contact Jack Gianola for any
September 13, 1999
Mr Troy Jones
Planning Department
City of Fort Collins
281 N. College Avenue
Fort Collins, CO 80524
RE: Civic Center Office Building PDP
Dear Troy,
We are pleased to submit the Fort Collins Office Building PDP and all of the other related
documents for your review.
Along with our submittal we would like to offer the following responses to the Conceptual
Review Team meeting comments dated April 5, 1999.
RESPONSES TO COMMENTS:
The Staff comments are summarized followed by a response in italic letters.
Zoning
A. Downtown Zoning District - Understood.
B. Type 2 (Planning and Zoning Board) review - Understood.
C. Development Standards in Section 4.12(E) of the LUC apply - Understood.
D. Make special note of Section 4.12(E)5 of the LUC - Understood.
E. Take care to meet all parking, handicap parking, and bike parking requirements. - A total
of 72 parking spaces are being provided on site. 50 of the parking spaces are dedicated
to customer parking, while 22 are reserved for City of Fort Collins company vehicles.
Employee parking will be provided within the adjacent City Parking Structure. A total of
4 handicap accessible parking spaces are provided in the on -site parking with 2 being
reserved for employees and 2 for customers.38 bicycle parking spaces are provided
within the office building along with a total of 3 surface mounted bicycle racks, which
accommodate 2 bicycles each, located along LaPorte Avenue and Mason Street.
F. There is a 15' setback from the street right-of-way -A maximum 15'setback is required
by 4.12(D)(2) of the LUC. We are proposing a 10 foot setback along Mason and LaPorte.
2. Advance Planning:
A. Prefer wide sidewalks to provide a pedestrian comfort zone. - Walks that are
approximately 15 feet wide are provided along Mason, LaPorte, and Maple adjacent to
this project. Internal sidewalks are generally 6 feet wide.
B. Show the diagonal parking on the north side of Maple Street. - We assume that you are
referring to the diagonal parking on the south side of Maple Street. The parking is now
shown on the site and landscape plans.