HomeMy WebLinkAboutCIVIC CENTER OFFICE BUILDING - FDP - 29-99A - CORRESPONDENCE -Planner: fi�v Tah�
Engineer: ��-r�i<ry/c��,fi
Tra fi( Operations: Fze- z3o.-�cx ,=—
Dare:
Items Requested
Site land I Plat Utill Drainage R t Other Items Required
Engineering
Redlined Items Being Returned
Site land Plat Utility Drainage R t Other Items Being Returned
Stormwater
Rater/Haitewatel
TrafDs; Operations
x
.
Trans. Planning
Tranifort
Ilatural.Resources
Park Planning
Totals
Other.
Hote: All redlined items should be returned with Me resubmittal/ revisions.
f
b. I recommend you speak directly with water/wastewater to resolve
their comments. -
c. Once you have addressed the comments from the above 4
departments, please bring in mylars reflecting the changes.
If you have any questions about anything on this letter, feel free to call me.
fincerely,
1n.J
Tr. Jon s
Project Plan er
2
Commu 1 Planning and Environmental ; vices
Current Planning
City of Fort Collins
Jack Gionola
Facilities Department
P.O. Box 580
Fort Collins, CO, 80522
STAFF REVIEW COMMENTS
May 15, 2000
RE: Staff review comments for the Final Compliance of the Civic Center
Office Building
COMMENTS:
1. Water/Wastewater Utility Department:
a. Please see the redlined plans and the attached comments from the
Water and Wastewater department.
2. Stormwater Utility Department:
a. Please seethe redlined plans and the attached comments from
Stormwater department.
3. Engineering Department:
a. Please seethe redlined plans and the attached comments from the
. Engineering department.
4. Poudre Fire Authority:
a. Please see the attached comment sheets from Poudre Fire Authority.
5. Current Planning:
a. The new location of the utility boxes needs to be coordinated with
Joe Frank. We want to make sure that the new location doesn't
conflict with a possible corner entrance if a building is ever built on
the northeast corner of Mason and La Porte.
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020