Loading...
HomeMy WebLinkAboutOLD TOWN NORTH, NORTH FLATS - PDP & MODIFICATION OF STANDARDS - 28-99D - CORRESPONDENCE - (3)[10/27/06] Cover Sheet: Please add a secondary benchmark to the plans in to comply with LCUASS Appendix E standards. Number: 15 Created: 10/27/2006 [11/27/06] Add a note to the Grading Plan stating that all roof top drainage shall be conveyed to public alleys, no concentrated flows are permitted to drain over sidewalks. [10/27/06] All landscaped areas, hardscaped areas and roof top drainage shall be conveyed to the street gutter. No concentrated surface drainage shall be conveyed over sidewalks. Please provide area drain inlets and a curb drain or sidewalk chase to carry this water to the gutter. Provide a standard detail for any curb drains or sidewalk chase. Topic: General Number: 48 Created: 11 /27/2006 [11/27/06) Please add a copy of the subdivision Plat to the Utility Plans for reference. Include this on the sheet index as well. Number: 49 Created: 11 /27/2006 [11/27/06] All remaining issues may be resolved with the Final Compliance Plan submittal. OK to schedule a hearing. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMastewater Number: 50 Created: 11 /28/2006 [11/28/06] Show and label all existing curb stops and proposed meter pits. Move the location of the branch lines which go to the dog washes to a point at least 5 feet downstream of the meter pit. All pre -hearing issues have been resolved, so you are ready to schedule your administrative hearing. Please call me to coordinate the hearing date. Also, submit 2 copies of the planning set (including cover, site, landscape, architecture, lighting plans and plat) directly tc me as soon as for use by me and the Hearing Officer. If possible, please also submit them electronically to me at aaspen cDfcgov.com for inclusion in the powerpoint for the hearing. After the hearing, assuming approval, you will submit a revised set of plans for the Final Plan review. For maximum efficiency, you'll want to address all of the remaining comments in this letter and previous staff review letters. The first staff review will be held 4 weeks after final plan submittal. I am attaching a routing sheet for the final plan submittal. Please remember that you must wait til you have approval from the hearing to submit and that you need to schedule an appointment with the front counter staff at 221-6760 for the submittal. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6206. Sincerely, nne H. Aspen City Planner Page 2 F) r STAFF PROJECT REVIEW Cityof Fort Collins Greg Fisher Date: 11/29/2006 Greg D. Fisher, Architect 3115 Clyde Street Fort Collins, CO 80524 Staff has reviewed your submittal for OLD TOWN NORTH, NORTH FLATS PDP - TYPE I, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Anne Aspen Topic: General Number: 51 Created: 11 /29/2006 [11/29/06] Zoning indicates that they have no further issues with this plan. Number: 52 Created: 11 /29/2006 [11/29/06] The plans look great now. Great job on the revisions! Thank you for being so responsive and attentive to our comments. Topic: Landscape Plan Number 53 [11/29/06] City Forester Tim Buchanan comments as follows: "Add these General Notes on sheet L2 1.A permit must be obtained from the City Forester before any trees or shrubs as noted on this plan are planted, pruned or removed on the public right-of-way. This includes zones between the sidewalk and curb medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy. 2.The developer shall contact the City forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase. Failure to obtain approval by the City forester for street trees in a phase shall result in a hold on certificate of occupancy for future phases of the development. 33he soil in all landscape areas shall be thoroughly loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at least six 96) inches by tilling, discing or other suitable method at a rate of at least three (3) cubic yards of soil amendment per one thousand (1,000) square feet of landscape area." Department: Engineering Issue Contact: Randy Maizland Topic: Engineering - Utility Plans Number: 9 Created: 10/27/2006 [11/27/06] Secondary bench mark provided is not adequate. Please provide a 2nd bench mark from the Fort Collins BM List and provide reference with the elevation. Page 1