Loading...
HomeMy WebLinkAboutJ.L. WEST (726 S. LEMAY AVE.) - PDP - 39-99 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSRIVERSIDE - J.L. WEST It was determined that a Neighborhood Meeting would not be necessary for this project. This was determined by Bob Blanchald on November 17, 1999. No residential neighborhood appears to be affected or within the vicinity of the Project. RIVERSIDE - J.L. WEST The project is planned to be constructed as a single phase during the spring of the year 2000. No Text J.L. West, Project Development Plan, Current Planning File # 39-99 April 13, 2000 Administrative Hearing Page 7 FINDINGS OF FACT/CONCLUSIONS After reviewing the J.L. West, Project Development Plan, staff makes the following findings of fact and conclusions: 1. The proposed land uses are permitted in the (E) Employment zone district. 2. The Project Development Plan complies with all applicable district standards of Section 4.22 of the Land Use Code, (E) Employment zone district. 3. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. RECOMMENDATION: Staff recommends approval of the J.L. West, Project Development Plan, Current Planning File # 39-99. J.L. West, Project Development Plan, Current Planning File # 39-99 April 13, 2000 Administrative Hearing Page 6 B. Engineering Standards [3.3] 1. Plat Standards [3.3.1 ] • Public Sites, Reservations and Dedications [3.3.1(C)] — In order for the City of Fort Collins to obtain the ultimate right-of- way for the future Riverside Avenue and Lemay Avenue as designated on the Master Street Plan, the applicant is providing an additional 11 feet of street right-of-way along both the Riverside Avenue and Lemay Avenue frontages. 2. Water Hazards [3.3.3] — The PDP has been reviewed by and complies with the requirements of the Stormwater Department. 3. Engineering Design Standards [3.3.5] — This project complies with all design standards, requirements, and specifications for all of the commenting departments and agencies. C. Building Standards [3.5] Building and Project Compatibility [3.5.1] — The proposed synthetic stucco building with structural steel awnings and aluminum frame windows is compatible with the established architectural character and materials of buildings in the surrounding area. Loading docks, outdoor storage, utility meters, trash collection, and other service functions are incorporated into the overall design scheme of the site so that these uses are screened and out of view of high visibility areas. 2. Mixed -Use, Institutional and Commercial Buildings [3.5.3] — The proposed building is in conformance with the prescribed build -to line, satisfies the variation in massing, fagade treatment, entrance treatment, and the base and top treatment requirements, therefore the application satisfies the requirements of this section of the code. D. Transportation and Circulation [3.6] Master Street Plan [3.6.1 ] - Riverside Avenue and Lemay Avenue are both designated as a 4-lane arterials on the Master Street Plan. Both streets are currently built as a 4-lane arterial designed to old standards. The proposed development provides and additional dedication of 11 feet of right-of-way in order to fulfill the current required street right-of-way width (a modified arterial width was allowed due to the infill nature of the site) requirement of today's standards. 2. Transportation Level of Service Requirements [3.6.4] — The Transportation Planning Department has determined that the project meets the applicable Level of Service(LOS) requirements. 3. Transit Facilities Standards [3.6.5] — There is an existing Transfort route that goes down Riverside Avenue and Lemay Avenue. Employees and customers can utilize this existing system including the existing bus stops. J.L. West, Project Development Plan, Current Planning File # 39-99 April 13, 2000 Administrative Hearing Page 5 Lemay Avenue right of way, and therefore satisfies the setback requirement. • Required Number of Spaces for Type of Use [3.2.2(K)] — The proposed building has two uses. There is 1020 square feet of office use which is limited to a maximum of 3 spaces per 1000 square feet of gross leasable area, and there is 1500 square feet of food catering which.is limited to 15 spaces per 1000 square feet of gross leasable area. The proposed office use allows 3 spaces and the proposed food catering use allows 22 spaces, therefore the site (the southern lot) would be allowed to have a maximum of 25 parking spaces. The site plan shows 21 parking spaces, thereby satisfying the maximum parking space limitation. • Handicap Parking - [3.2.2(K)(4)] — The applicant has provided one handicap space, therefore the application satisfies this requirement. • Parking Stall Dimensions - [3.2.2(L)] — The standard parking stalls are 9'x17'. The stall length requirement is 19 feet long unless the stalls allow for a 2' overhang with a curb or wheel stop provided. The proposed parking lot provides a qualifying 2' overhang area for the stalls, therefore is in conformance with the required stall size requirement. • Landscaping - [3.2.2(M)] - The parking lot area on the site plan is required to devote at least 6% of the area of the parking lot to landscaped areas. The parking lot is 6,672 square feet. 6% of that area is 400 square feet. The applicant proposes 568 square feet of landscaped areas, which exceeds the minimum required, therefore the parking lot satisfies the 6% minimum area for landscaping requirement. 3. Solar Access, Orientation, Shading [3.2.3] — The proposed plan is designed in a way that protects its roof's access to sunshine between 9am and 3pm on December 21st. The physical elements of the development plan are located and designed in a way that will not cast a shadow onto structures within the site or on adjacent property greater than allowed in this section. 4. Site Lighting — [3.2.4] —As required the applicant is using lighting fixtures that are concealed and fully shielded featuring sharp cut-off capability which reduces up -light, spill -light, glare and unnecessary diffusion on adjacent property. The maximum and minimum lighting on -site lighting levels are in compliance with this section. J.L. West, Project Development Plan, Current Planning File # 39-99 April 13, 2000 Administrative Hearing Page 4 • Screening [3.2.1(E)(6)] —Landscape and building elements are placed to adequately screen areas of low visual interest and visually intrusive site elements including the loading dock and trash enclosure areas. • Utilities [3.2.1(K)] — The landscape and utility plans have been coordinated and the required tree/utility separations have been provided, thereby satisfying this standard. 2. Access, Circulation and Parking [3.2.2] • Safety Considerations [3.2.2(C)(1)] — Pedestrians are separated from vehicles and bicycles to the maximum extent feasible, thereby satisfying this requirement. • Curbcuts and Ramps [3.2.2(C)(2)] — Ramps are provided for the sidewalk where the sidewalk crosses the entry drive, and a ramp is also provided for the handicap parking space to give access to the front door, thereby satisfying this requirement. • Bicycle Facilities [3.2.2(C)(4)] — A bicycle rack is being provided near the main entrance to the new building, thereby satisfying this requirement. • Walkways [3.2.2(C)(5)] — A grade separated sidewalk directly connects the street sidewalk with the main entrance of the new building without requiring a pedestrian to cross a drive aisle or vehicle area, thereby satisfying this requirement. • Access and Parking Lot Requirements [3.2.2(D)] — Vehicle areas are clearly separated from walkway areas. Unobstructed vehicular access is provided from the public street to all parking spaces. All off-street parking areas are surfaced with materials in conformance with city specifications. The project therefore complies with access and parking lot requirements. • Parking Lot Layout [3.2.2(E)] — The parking lot provides well- defined circulation routes for vehicles, bicycles and pedestrians. Landscaped peninsulas with raised curbs define parking lot entrances and the end of parking aisles. The proposed plan provides continuous, direct pedestrian access with a minimum of driveway and drive aisle crossings. No parking bays extend more than 11 spaces without an intervening landscape peninsula. • Setbacks [3.2.2(J)] — The parking lot is required to be setback from Lemay Avenue at least and average of 15 feet along the parking lot frontage and no closer than 5 feet at any one point. The parking lot is proposed to be located 28 feet behind the J.L. West, Project Development Plan, Current Planning File # 39-99 April 13, 2000 Administrative Hearing Page 3 3. Article 3 of the Land Use Code — General Development Standards The Project Development Plan complies with all applicable General Development Standards as follows: A. Site Planning and Design Standards [3.2] 1. Landscaping and Tree Protection [3.2.1 ] • Full Tree Stocking [3.2.1(D)(1)(c)] — Full tree stocking is required in all landscaped areas within 50 feet of any building along high use or high visibility sides. Full tree stocking is formal or informal groupings of trees planted at 30' to 40' spacing intervals for canopy shade trees, or at 20' to 30' spacing intervals for coniferous evergreens or ornamental trees. The proposed site plan satisfies this standard. • Street Trees [3.2.1(D)(2)] — Street trees are required at 30 to 40 foot spacing along adjacent streets. The applicant satisfies this standard. • Minimum Species Diversity [3.2.1(D)(3)] — Based on the total proposed number of new trees, the applicant would be allowed to have up to 6 of any one species, but has only proposed a maximum of 3 of one species, therefore satisfies the minimum species diversity requirement. • Foundation Plantings [3.2.1(E)(2)(d)] —All exposed sections of building walls have planting beds in at least 5 feet in width. The landscape plan therefore satisfies the foundation plantings requirement. • Parking Lot Perimeter Landscaping [3.2. 1 (E)(4)] — The parking lot does not abut a public street. Trees are provided at the required 1 tree per 40 feet along the side lot line parking setback area (the eastern property boundary). The parking lot is also screened by plant material from the abutting nonresidential use to the south of the property. The landscape plan therefore satisfies the parking lot perimeter landscaping requirement. • Parking Lot Interior Landscaping [3.2. 1 (E)(5)] — The parking lot area on the site plan is required to devote at least 6% of the area of the parking lot to landscaped areas. The parking lot is 6,672 square feet. 6% of that area is 400 square feet. The applicant proposes 568 square feet of landscaped areas, which exceeds the minimum required, therefore the parking lot satisfies the 6% minimum area for landscaping requirement. J.L. West, Project Development Plan, Current Planning File # 39-99 April 13, 2000 Administrative Hearing Page 2 COMMENTS: 1. Background The surrounding zoning and land uses are as follows: N: I; Riverside Avenue, CCR; Existing medical clinic, Union Pacific Railroad right-of-way, Burlington Northern and Santa Fe Railroad right-of-way, vacant property, RC; Vacant property, POL; Poudre River Trail, S: E; Existing tire store, existing restaurant, existing credit union, existing dental office, existing convenience store with fuel sales, E: I; Riverside Avenue, E; Existing auto repair shop, existing glass shop, CCR; Union Pacific Railroad right-of-way, vacant property, W: NC; Lemay Avenue, shopping center anchored by Albertson's and Longs Drugs. The property was annexed in September of 1967 as part of the First Lemay Annexation. 2. Division 4.22 of the Land Use Code, Employment District (E) The proposed uses of "offices" and "food catering" are both permitted in the (E) Employment Zoning District subject to administrative review. The PDP meets the applicable Land Use Standards [4.22(D)] as follows: • The proposed use of "food catering" is listed as a secondary use, and is therefore limited to occupy no more than 25% of the total gross area of the development plan. The gross area of the development plan is 39,714 square feet. The proposed new building is on a lot that is 16,083 square feet. The "food catering" use one of two uses proposed in the new building, therefore each use occupies roughly 8,042 square feet of the site. The "food catering" use therefore occupies less than 25% of the total gross area of the development plan, so thereby satisfying this standard. • The proposed building does not exceed the maximum permitted building height. • The proposed project is less than 50,000 square feet of gross leasable area, and is therefore not subject to Planning and Zoning Board review. ITEM NO. MEETING DATE �D STAFF City of Fort Collins HEARING OFFICER STAFF REPORT PROJECT: J.L. West, Project Development Plan, Current Planning File # 39- 99 APPLICANT: Ric Hattman Hattman Associates 145 W. Swallow Fort Collins, CO 80525 OWNER: Roger Albrecht 2305 Nottingham Ct. Fort Collins, CO 80526 PROJECT DESCRIPTION: This request is a two part request. The first part is to replat an existing lot into two smaller lots. The second part is to propose a development plan on one of the two lots, and having the existing use of the site continue to use the other lot as an existing permitted use. The existing lot, which currently contains the restaurant Wok & Roll Teriyaki, is located at the southeast corner of the intersection of Lemay Avenue and Riverside Avenue, and is approximately 39,714 square feet in size. The northern new lot will be 19,058 square feet, and the southern new lot will be16,083 square feet. The northern lot will continue to contain Wok & Roll Teriyaki, and the layout for the lot is not part of this application. On the southern lot, the applicant is proposing to construct an additional 3,240 square foot mixed -use food catering/office building. The Project Development Plan includes the replat of the larger lot and the site planning of the southern (newly created) lot. RECOMMENDATION: Approval EXECUTIVE SUMMARY: The proposed land uses are permitted in the (E) Employment zone district. The Project Development Plan complies with all applicable district standards of Section 4.22 of the Land Use Code, (E) Employment zone district. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 PLANNING DEPARTMENT