Loading...
HomeMy WebLinkAboutDOWNTOWN TRANSIT FACILITY - PDP - 9-00 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: Planner: ZI'''c� Engineer: 14?e Date 1rafUc Operations: -�<� ��-�<< Items Requested Site land I Plat Utilly I Drainage R t Other Items Required Redlined Items Being Returned cite Land I Plat Utility Drainage fl t Other Items Being Returned - Stormwater Water/Wastewate i Tragic Operations Trans. Planning Transfort Natural Resources Park Planning 7'73F Totals Other: Hole: All redlined Items should be returned with the mubmittal/ revisions. Revisions Routing Sheet - Item: Date: IMb�1CG� • 8,/Z C�QQ 4 ao vo y` c o tr 4' .. tea` O" e r o` a o g` FILE: PROJECT PLANNER Z y ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER I i MAPPING / DRAFTING FORESTRY FCLWD/ELCOBOXELDER FIRE POLICE ADVANCE PLANNING STREETS R.O.W. PLANNING siiiii� WATER CONSERVATION PUBLIC SERVICE mm m STATE HIGHWAY DEPARTMENT m mmm mommom RAILROAD: UP or BN/CS mmmmmmm mmmmmm mm����iiiiiim VAN mommmomm • rr�mc�r�r�®0®�����