HomeMy WebLinkAboutDOWNTOWN TRANSIT FACILITY - PDP - 9-00 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject:
Planner: ZI'''c�
Engineer: 14?e
Date
1rafUc Operations: -�<� ��-�<<
Items Requested
Site land I Plat Utilly I Drainage R t Other Items Required
Redlined Items Being Returned
cite Land I Plat Utility Drainage fl t Other Items Being Returned
-
Stormwater
Water/Wastewate
i
Tragic Operations
Trans. Planning
Transfort
Natural Resources
Park Planning
7'73F
Totals
Other:
Hole: All redlined Items should be returned with the mubmittal/ revisions.
Revisions Routing Sheet -
Item:
Date:
IMb�1CG� • 8,/Z C�QQ
4 ao vo y` c o tr
4' .. tea` O" e r o` a o g`
FILE: PROJECT PLANNER
Z y
ENGINEERING: PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
I
i
MAPPING / DRAFTING
FORESTRY
FCLWD/ELCOBOXELDER
FIRE
POLICE
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
siiiii�
WATER CONSERVATION
PUBLIC SERVICE mm
m
STATE HIGHWAY DEPARTMENT m mmm
mommom
RAILROAD: UP or BN/CS
mmmmmmm
mmmmmm
mm����iiiiiim
VAN mommmomm
• rr�mc�r�r�®0®�����