HomeMy WebLinkAboutDOWNTOWN TRANSIT FACILITY - PDP - 9-00 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTNOLTE Final Drainage &
B E Y O N D E N G I N E E R I N G Erosion Control Study
Downtown Transit Center
5.0 EROSION CONTROL
5.1 General Concept
The Downtown Transit Center site lies within the moderate Rainfall Erodibility
Zone and the low Wind Erodibility Zone per the City of Fort Collins zone maps.
The potential exists for erosion problems during and after construction until the
disturbed ground is again vegetated.
The Erosion Control Performance Standard (PS) during construction. for this
project was computed to be 76.80 per the criteria in the City of Fort Collins
Erosion Control Reference Manual for Construction Sites. The Effectiveness
(EFF) of the proposed erosion control plan was calculated to be 90.35. The
proposed erosion control methods meet the City of Fort Collins' requirements.
Calculations can be found in the appendix.
5.2 Specific Details
During overlot grading, the detention area will be excavated. This area will act as
a sediment trap during construction. A gravel filter will be placed over the outlet
pipe until sodding is completed. Silt fence will also be installed.
After overlot grading has been completed, all disturbed areas not in a roadway area
shall have straw hay mulch applied. The areas of the site that are to be paved shall
�i have gravel mulch applied. After the utilities have been installed, the impervious
areas shall be paved as soon as possible. The pervious areas will have sod
installed. The erosion control measures can be seen on the drainage and erosion
�I control plan in a pocket in the back of this report.
�l
9 N:\FC0091\Doawents\dramage\Fc0091DmgRptdoc
October 19, 2000
Mr. Basil Hamdan
City of Fort Collins
Water Utilities - Stormwater
700 Wood Street
Fort Collins, Colorado 80522
p4C)=
B E Y O N D E N G I N E E R I N G
SUBJECT: Final Drainage and Erosion Control Study for the Downtown Transit Center
Dear Mr. Hamdan:
' We are pleased to submit to you, for your review and approval, this Final Drainage and Erosion
Control Study for the Downtown Transit Center. All computations within this report have been
completed in compliance with the City of Fort Collins Storm Drainage Design Criteria.
We appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions.
Sincerely,
NOLTE ASSOCIATES, Inc.
Prepared by:
Storm Gewirt�EIT
Project Engineer
Cc: File FC0091
NOLTE ASSOCIATES, INC.
1901 SHARP POINT DRIVE, SUITE A
FORT COLLINS, CO 80525
970.221.2400 TEL 970.221.2415 FAX
WWW.NOLTE.COM
Reviewed by:
Thomas Ochi
Project Mana,
n:\fc0091\documents\drainage\cover letter.doc
CHERRY ST.
�rlLOW
S>
MAPLE ST.
h'Sp
N
Q
V
O
¢
LAPORTE AVE.
ell -
MOUNTAIN AVE.
VICINITY MAP
NTS
APPENDIX A
Vicinity Map
N007E Final Drainage &
BE POND ENGINEERING Erosion Control Study
Downtown Transit Center
r
1. Storm Drainage Design Criteria and Construction Standards (Criteria), City of Fort
Collins, Colorado (Revised January 1997).
2. Drainage Criteria'Manual (Manual), Urban Drainage and Flood Control District, Wright -
McLaughlin Engineers, Denver, Colorado, March 1969.
3. Erosion Control Reference Manual for Construction Sites, City of Fort Collins, Colorado,
January 1991.
4. Final Drainage Report for Temporary Parking Lots Parsons &Associates, Inc., Fort
Collins, Colorado, August 19, 1998.
5. Civic Center Parking Structure Final Drainage Report, Parson & Associates, Inc., Fort
Collins, Colorado, (Revised January 1999).
12 N:\FC00911Documentsldrainage\Fc009lDmgRpLdoe
z
NUL=E Final Drainage &
BEYOND ENGINEERING Erosion Control Study '
Downtown Transit Center
6.0 CONCLUSIONS
6.1 Drainage Concept
The proposed drainage concepts presented in this study and shown on the final
drainage plans adequately provide for the conveyance and detention of developed
runoff from the proposed development.
11 I N:1FC00911Documents\dminage\Fc009llhngRpLdoc
NO= Final Drainage &
BEYOND ENGINEERING Erosion Control Study
Downtown Transit Center
All construction activities must comply with the State of Colorado permitting
process for Stormwater Discharges Associated with Construction Activity. A
Colorado Department of Health NPDES Permit will be required before any
construction grading can begin.
10 N:\FC00911Domments\drainage1Fc0091DmgRpt.doc
NC U E Final Drainage &
BE Y O N D E N G I N E E R ING Erosion Control Study
Downtown Transit Center
vegetated areas. The Downtown Transit Center proposes to use a combination of
sedimentation and straining as a means of water quality.
Due to the size of the site, only a small amount of water quality storage is
required. The Downtown Transit Center proposes to employ characteristics of
different structural BW's for basic pollutant removal. The detention/water
quality pond on the site is a shallow flat grassy area that allows for stormwater to
sheet flow slowly, allowing pollutants to settle out before the runoff leaves the site.
The flat grassy area also acts like a grass buffer that promotes filtration, infiltration
and settling to reduce runoff pollutants. In addition, the detention/ water quality
pond acts like an extended detention basin, allowing small particles to combine and
settle. The pond proposes to utilize a water quality structure with an orifice plate
to slow the release of runoff from the site, allowing more time for sediment to
settle. See appendix and plans for more details.
The WQCV is based on the tributary area draining to the detention pond as well as
the percentage of the total area that is impervious. The calculated water quality
storage volume is 0.041 ac-ft. At elevation 4979.94, 0.041 ac-ft of water quality
has been provided for. Calculations can be found in the appendix.
The 100-yr WSEL for the 0.09 ac-ft of required storage plus the 0.041 ac-ft of
water quality is 4980.74. The proposed detention/water quality pond adequately
provides for this amount.
8 N:1FC00911DommeNsWramge1Fc0091D rngRpLdoc
N : LO= Final Drainage &
BEYOND ENGINEERING Erosion Control Study
Downtown Transit Center
4.3 Detention Pond Design
As previously stated, the proposed development is not required to detain the
runoff from the site. The capacity of the 15" pipe the site drains to is 11.45 cfs.
The site (Basin 7) has a total flow of 12.93 cfs. The development proposes to
release at the 10-yr flow and provide detention for the remainder of flow.
The detention pond shown in Basin 7 was sized using the FAA method.
According to the calculations, 0.09 ac-ft is required. Additional volume for water
quality has also been provided. See appendix for calculations.
The release rate
Q1o=4.56 cfs, is based on the 10-yr flow from Basin 7.
Emergency overflows from the detention pond will be directed out the north
entrance of the site, at an elevation of 4981.86, onto Maple Street.
4.4 Water Quality
Criteria outlined in Volume 3 of the Urban Storm Drainage Criteria Manual were
used to determine the required Water Quality Capture Volume (WQCI). The
water quality storage volume is equal to 120 percent of the WQCV based on a 40-
hour drain time.
The Urban Storm Drainage Criteria Manual suggests many mechanisms for
treating stormwater runoff for water quality enhancement, two of which are
sedimentation and straining. Sedimentation, which includes extended detention,
allows smaller particles to combine into larger ones and settle. According to
Urban Drainage, sedimentation is the primary pollutant removal mechanism for
most structural BMV's. Straining is a method that uses grass to filter out
pollutants. This happens when sheet flow is directed to flow slowly over
7 N:\FC0091\Documents\drainage\Fc0091DmgRptdoc
Final Drainage &
B E Y O N D E N G IN E E R ING Erosion Control Study
Downtown Transit Center
Basin 7 (1.38 ac) contains the main portion of the site involving improvements.
Developed flows from this basin will travel northwest in curb and gutter to the
detention/water quality pond in the northwest corner of the site.
s
6 N:1FC0091\Documents\drainage1Fc009IDmgRpt.doc
B E V O N D E N G IN BE RING
Final Drainage &
Erosion Control Study
Downtown Transit Center
1 4.0 DEVELOPED DRAINAGE CONDITIONS
4.1 General Concept
In general, developed flows from the proposed site will sheet flow in a
northwesterly direction to the proposed on -site water quality/detention pond.
Runoff from portions of the site will continue to flow as it has done historically.
4.2 Basin Descriptions
Stormwater runoff from Basin 1 (0.40 ac) travels along the curb and gutter on
Mason Street where it will enter a relocated inlet.
Developed flows from Basin 2 (022 ac) will travel in the curb and gutter on
Mason Street where it will enter a relocated inlet.
Flow from Basins 1 and 2 have historically entered existing inlets along Mason
Street. The alignment of Mason Street has changed resulting in the relocation of
the inlets to the new curb and gutter. The northeast corner of the LaPorte/Mason
intersection has been improved and the new inlet that will catch flows from Basin 1
has been installed.
Basins 5 and 6 (0.08 ac and 0.52 ac, respectively) combine and travel east along
existing the curb and gutter of LaPorte Street, where it will enter an existing inlet.
Runoff from Basin 3 (0.17 ac) will flow in curb and gutter along Maple Street
where it will combine with the developed flows from Basin 4 (0.74 ac). Basin 4
consists mostly of the back of the existing freight depot building, as well as parking
and asphalt drive. This area has historically drained to the northeast corner of the
site and will continue to do so.
1 5 N:1FC00911Documents\dminage\Fc009lDmgRptdoc
r4C TE Final Drainage &
BEYOND ENGIN BERING Erosion Control Study
Downtown Transit Center
3.0 HISTORIC DRAINAGE BASINS
3.1 Major Basin Description
As seen on the Fort Collins Stormwater Basin Map, the Downtown Transit Center
lies within the Old Town Master Drainage Basin Plan. There is no major
drainageway through the basin. Runoff travels through streets and several storm
sewer systems where it eventually discharges to the Poudre River.
Through discussions between the City of Fort Collins Stormwater Department and
Nolte Associates, Inc., the Downtown Transit Center site is not required to
provide detention. However, the site can not release more runoff than the existing
storm sewer system can handle. Therefore detention has been designed for the
difference. Water quality is also required.
4 N.\FC0091\Documents\dmamp\Fc009lDmgRptdoe
NOLTE Final Drainage &
Erosion Control Study
BEYOND ENGINEERING
Downtown Transit Center
2.0 METHODOLOGY
2.1 Compliance with Standards
The following Final Drainage & Erosion Control Study was prepared in
accordance with the design requirements and procedures set forth in the City of
Fort Collins Stormwater Drainage Design Criteria and Construction Standards
(Revised January 1997) and Urban Storm Drainage Criteria Manual by the Urban
Drainage and Flood Control District.
2.2 Analytical Methods
The Rational Method was used to calculate 10- and 100-year developed flows.
The Rational Method is widely accepted for design problems involving small
drainage areas (<160 acres) and short times of concentration. Mathematically, it
relates peak discharge to the runoff coefficient, rainfall intensity, and drainage area.
Runoff coefficients and rainfall intensity data were obtained from the Stormwater
Drainage Design Criteria and Construction Standards.
3 N:\FC0091\DaumentsWrainage1Fc009lDmgRpt.doc
NOLTE Final Drainage &
Erosion Control Study
BEYOND ENGINEERING
Downtown Transit Center
1.4 Previous Report and Studies
IParsons & Associates, Inc. prepared a report entitled, Final Drainage Report for
Temporary Parking Lots, for the existing Downtown Transit Center site, in August
' 1998.
' The Civic Parking Structure Final Drainage Report, by Parson & Associates in
October 1998, also makes reference to the Transit Center site.
Both reports refer to the Downtown Transit Center site as Block 22 and they
describe the current drainage patterns of the site.
2 N:\FC009lW40ementsWmlnage\FcOO91DMgRPLdoc
I r% L7-
IB E Y O N D E N G IN E E R ING
1 1.0 INTRODUCTION
Final Drainage &
Erosion Control Study
Downtown Transit Center
1.1 Site Location
The proposed Downtown Transit Center is located south of Maple Street, north of
LaPorte Street and west of Mason Street. More particularly, the Site is located in
the northeast '/a of Section 11, Township 7 North, Range 69 West of the 6111
Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado.
The site location can be seen in the Appendix.
1.2 Existing Site Description
The Downtown Transit Center site contains approximately 3.5 acres and currently
serves as a parking lot. It was designed to temporarily replace the parking that
was lost during the construction of the parking garage located to the south of the
site. The existing Freight Depot building is also located on this site, as well as a
back alley. The historic "Anne's Grave" monument is located on the west side of
the site.
Currently, the site's topography generally slopes toward the center of the site,
toward four existing area inlets. A gravel base covers the majority of the site.
Empire Laboratories prepared a geotechnical engineering report in January 1995
for the Storm Drainage Department Office Building, which is the present
Downtown Transit Center site. This soil report indicates that on -site subsoil
consists of sandy lean clay underlain by well -graded gravel with silt, sand, cobbles
and boulders. This study indicates the clays and gravels exhibit moderate to high
bearing characteristics and non to low swell potential.
1.3 Proposed Project Description
The proposed Downtown Transit Center will operate as a transit station for City of
Fort Collins buses (Transfort). A bike shelter is also proposed. Renovations to
1 the existing Freight Depot building as well as the construction of new buildings are
proposed for the future. The back alley is to remain unchanged. The proposed
' site can be seen on the drainage plan in the back of this report.,
1 N:\FC0091WomnentsWrainW\FcOO9lDmgRpLdm
NCCTE
BEYOND ENGINEERING
Final Drainage &
Erosion Control Study
Downtown Transit Center
TABLE OF CONTENTS
PAGE
1.0.
INTRODUCTION........................................................................................................
I
1.1 Site Location.....................................................................................................
1
1.2 Existing -Site Description...................................................................................1
j
1.3 Proposed Project Description............................................................................1
1.4 Previous Reports and Studies............................................................................
2
2.0
METHODOLOGY.......................................................................................................3
2.1 Compliance with Standards...............................................................................
3
2.2 Analytical Methods...........................................................................................
3
3.0
HISTORIC DRAINAGE CONDITIONS.....................................................................
4
3.1 Major Basin Description....................................................................................
4
4.0
DEVELOPED DRAINAGE CONDITIONS
5
1
4.1 General Concept ........................... .................................................................
5
4.2 Basin Descriptions.............................................................................................
5
4.3 Detention Pond Design ......................................................................................
7
4.4 Water Quality....................................................................................................
7
5.0
EROSION CONTROL.................................................................................................
9
5.1 General Concept...............................................................................................
9
5.2 Specific Details.................................................................................................
9
6.0
CONCLUSIONS........................................................................................................11
6.1 Drainage Concept...........................................................................................
11
REFERENCES...........................................................................................................
12
APPENDIX A - Vicinity Map.
APPENDIX B - Developed Site Hydrology
• Developed Flow Calculations
• Curb Cut & Inlet Analysis
APPENDIX C - Detention Pond Design & Water Quality Design
Is Orifice Sizing & Existing Pipe Capacity
APPENDIX D - Erosion Control Calculations
APPENDIX E - Charts, Tables & Graphs
BACK POCKET - Drainage and Erosion Control Plan
I( 1 N:\FC009100mmentsWmHWP\Fc009llhngRptdOe
d -
DOWNTOWN TRANSIT CENTER
FINAL DRAINAGE &
EROSION CONTROL STUDY
for
AllereLii
748 Whalers Way
Building E, Suite 200
Fort Collins, Colorado 80525
m
Nolte Associates, Inc.
1901 Sharp Point Drive, Suite A
Fort Collins, Colorado 80525
(970) 221-2400
August 10, 2000